Recommended expert

Dirk Laudan

Consultant, PMO, Project Lead, Project Manager, Organization And Coordination, Rollout Coordinator-Manager, Migration Manager,

Dirk Laudan
Reinbek, Germany

Experience

Oct 2024 - Present
1 year 6 months

Project Management; Coordinator

  • Renovation, refurbishment and construction of two houses in Southern Europe.
  • Organization and management of the trades to be performed, including hands-on tasks.
  • Project management, coordination, documentation and execution.
  • Preparation and carrying out the sale of the plots and properties.
Sep 2023 - May 2024
9 months

Data Management; Tester

  • Worked on the project to replace HPSM with ServiceNow.
  • Took on the roles of ServiceNow ITSM Tester and ServiceNow ITSM Test Analyst.
  • Used HP Application Lifecycle Management via Citrix.
  • Prepared data for migration to ServiceNow.
  • Compiled the necessary data exports.
  • Created test cases and executed tests, including for loss reports and orders.
  • Provided test and production data for testing purposes.
  • Used Windows 10, MS Office 2010/O365, Access, HPSM, Webex, SharePoint, LAN-Inspector, MS Project, ServiceNow.
  • Responsibilities in project preparation, consulting, communication and office management.
Jan 2021 - Sep 2024
3 years 9 months

Consultant; PM-Office Coordination | PMO; Data Analyst

  • Planning and implementation of an open/flex-space and desk-sharing concept including hardware refresh in the IT department of a development bank.
  • Coordinating and managing external service providers, as well as supporting daily operations and providing operational assistance.
  • Internal coordination between departments, teams and external partners.
  • Preparing for moves and preliminary work, as well as planning and coordinating client replacement (rollout, hardware refresh and printers) in Frankfurt am Main, Berlin and Bonn across about 30 buildings.
  • Supporting around 8000 employees and devices.
  • Assessing the current hardware, workstation and network situation.
  • Identifying weaknesses and sources of errors.
  • Analyzing the IT and supplier client data inventory.
  • Providing and preparing data for project success as part of IT data management.
  • Evaluating and planning the distribution of moves from the perspective of IT and move management.
  • Determining the electronic and technical availability of each workstation for refresh and moves.
  • Selecting the new hardware equipment.
  • Running a pilot project.
  • Informing employees and managers affected by the move (including quick-start guides for the first steps at the new workstation).
  • Stakeholder management.
  • Organizing floor walkers and helpdesk support for affected employees on the first day.
  • Transferring the data into a reservation system and conducting tests.
  • Planning the infrastructure (network patching, floor multifunction printers).
  • Planning and staging the devices and accessories needed for the refresh.
  • Planning the replacement process and coordinating with the affected departments.
  • Planning and evaluating the hardware refresh.
  • Conducting needs analysis of the departments and informing them about the move and refresh process.
  • Planning standard workstations, special workstations and anchor workstations for employees with restrictions.
  • Switching to new clients and USB-C equipment, including supporting employees.
  • Organizing, coordinating and aligning the involvement of all project participants per phase.
  • Planning emergency workstations.
  • Conducting acceptance checks, debriefings and lessons learned.
  • Communication, documentation and reporting.
  • Stakeholder and change management.
  • Using Windows 10/11, MS Office O365, Access, Excel, HPSM, Webex, SharePoint, LAN-Inspector, MS Project, iTop, ServiceNow.
  • Activities in project planning, preparation, consulting, communication, office management and data analytics.
Jan 2020 - Jan 2025
5 years 1 month

Project Management, Consultant, PMO, Data Analyst & Quality Management

  • Project management for reducing end devices in the client management environment and hardware refresh (rollout).
  • Identifying reduction potential by analyzing the data inventory.
  • Defining metrics to measure project success.
  • Defining and documenting the reduction process.
  • Reducing end devices to a predetermined target level.
  • Continuously monitoring the implementation status.
  • Establishing and improving processes to ensure and maintain the 'end devices per employee' target.
  • Ongoing reporting on project results.
  • Documenting project results as well as related guidelines and instructions.
  • Reporting on the current stock of end devices.
  • Ensuring compliance with internal guidelines for documenting changes and incidents.
  • Participating in the introduction of IGEL boot sticks.
  • Consulting, analysis and support for various projects (license management, FlexSpace, ServiceNow implementation, Windows 11, Corona emergency plan, etc.).
  • Using Windows 7/10, MS Office 2010/O365, Access, HPSM, Webex, IGEL boot sticks, iTop, Confluence, ServiceNow.
  • Activities in project planning, preparation, consulting, communication, office management and project management.
Jan 2019 - Jan 2025
6 years 1 month

Consultant; PMO; Data Analyst

  • Consulting in data management, error analysis and optimization of data inventories.
  • Identifying sources of errors by analyzing the data inventory.
  • Defining and implementing processes to improve data quality.
  • Defining and implementing measures to clean up faulty data records.
  • Weakness analysis focusing on the leaver process, device returns and quantity control as a basis for the monthly invoicing of the outsourced desktop services.
  • Reducing end devices and optimizing inactive clients.
  • Documenting and presenting results, including decision-making bases.
  • Introducing and adapting processes based on the weakness analysis.
  • Reactivating and evaluating inactive clients.
  • Preparing data for project-related topics (e.g. FlexSpace, refresh).
  • Creating reports and reporting, conducting license clean-ups.
  • Building a client history database.
  • Performing KPI analyses.
  • Quantity control for suppliers, service and invoice control.
  • Analyzing security-risk devices and updating, replacing or blocking them.
  • Using Windows 10, MS Office 2010/O365, Access, HPSM, SQLite, Wiki, Webex, SharePoint, LAN-Inspector, MS Project, iTop, ServiceNow.
  • Activities in project planning, preparation, consulting, communication, office management and data analytics.
Jan 2019 - Dec 2019
1 year

Project Management Office

  • Analyze and optimize processes in the end-user area.
  • Coordinate and implement new or modified processes.
  • Identify savings potential in the end-user area and inform the committees.
  • Design and implement a process to reduce the number of end devices.
  • Introduce a boot stick concept and support the rollout.
  • Document the processes and results.
  • Monitor the reduction and hardware distribution process.
  • Perform error analysis and create reports.
  • Prepare and deliver stakeholder presentations.
  • Use MS Office 2010, HPSM, Webex, IGEL Boot Stick.
  • Activities in project planning, preparation, consulting, communication and office management.
Oct 2018 - Dec 2018
3 months

Process Management, Documentation, Consulting

  • Analyze existing processes in a telecommunications environment.
  • Coordinate and implement new or modified processes.
  • Create work instructions and manuals.
  • Set up and maintain technical and process documentation.
  • Perform error analyses.
  • Create protocols and reports.
  • Use MS Office 2016, Jira, Confluence, Lync, Visio 2013.
  • Activities in project planning, preparation, consulting, communication and office management.
Nov 2017 - Oct 2018
1 year

Support, Consulting

  • Roll out and support of around 14,700 logistics scanners.
  • Document and plan service and support processes.
  • Perform error analyses.
  • Service management and communication management.
  • IT consulting and building a support department.
  • Perform software and hardware tests.
  • Create work instructions and manuals.
  • Set up, guide and train a 1st and 2nd level support team.
  • Set up reporting structures.
  • Change management and stakeholder management.
  • Plan the software rollout.
  • Create protocols and reports.
  • Use MS Office 2010, Jira, Confluence, Soti, Circlon Operate, Wiki, MS Project, Skype/Lync, H@V DB, Webex.
  • Team size 1–5 people.
  • Activities in project planning, preparation, consulting, communication and office management.
May 2017 - Nov 2017
7 months

Project Manager / PMO

  • Plan and prepare the migration of all bank branches and ATMs of a German bank under MiFID II.
  • Plan and prepare the rollout of all locations.
  • Prepare parts of the contract and define framework parameters.
  • Create technical documentation and manuals.
  • Set up and design a test lab.
  • Plan, set up and approve a pilot.
  • Report to stakeholders and management.
  • Stakeholder management.
  • Requirements management including requirement definition, analysis and documentation.
  • Use MS Office 2010, online meeting tools (Skype for Business, Webex Meeting), Merlin2, MS Project.
  • Create protocols and reports and approve contract-related milestones.
  • Manage a team of 32 people.
  • Activities in project planning, preparation, consulting, communication and office management.
Sep 2016 - Sep 2017
1 year 1 month

Project Manager / Coordinator

  • Plan and execute an international carrier change for 2,800 locations with various connection types.
  • Ensure data quality.
  • Requirement definition, analysis and documentation.
  • Develop and implement processes for migration, testing, acceptance and handover to operations.
  • Communication management with internal and external partners.
  • Supplier management.
  • Planning, documentation, interface tests, acceptance reports and reporting.
  • Use MS Office, MS Project, Visio, Windows 10, OS X, MS Office 2011/2013, Skype for Business.
  • Data maintenance and project communication.
  • Team size 8 people, more than 200 contacts.
  • Activities in project planning, preparation, consulting, communication and office management.
Sep 2016 - Oct 2016
2 months

Rollout Manager / Coordinator

  • Planning and execution of a hardware rollout and move for 800 users across multiple buildings.
  • Project and rollout planning as well as operational coordination.
  • Process development and communication planning.
  • Coordination and alignment with vendors.
  • Monitoring and coordinating the on-time delivery of project deliverables.
  • Supporting the project manager.
  • Documentation and quality assurance of documents.
  • Budget and resource planning.
  • Creating reports for internal and external communication.
  • Maintaining open items lists and risk & issue logs; creating and consolidating protocols and lists.
  • Using MS Office, Windows Vista/8.1 Pro, MS Office 2010/2013, Skype for Business, Merlin2, MS Project.
  • Creating acceptance protocols and reporting.
  • Team size: 9 members.
Mar 2016 - Jul 2016
5 months

Rollout Manager / Coordinator

  • Planning and coordination of a rollout at multiple sites and branch offices.
  • Training the client's employees.
  • Stakeholder management.
  • Project and rollout planning.
  • Process development and communication concepts.
  • Coordination and alignment with vendors and rollout teams.
  • Hardware preparation (system staging) and testing.
  • Execution of hardware and network rollouts as well as dismantling old hardware at the client.
  • Coordination of the teams' service and support.
  • Planning and setup of a ticketing system.
  • Conducting software tests and software distribution.
  • Data maintenance and documentation.
  • Creating acceptance protocols and reporting.
  • Consulting activities and scheduling appointments.
  • Using MS Office, Windows Vista/8.1 Pro, MS Office 2010/2013, Lync (Skype), MS Project, Merlin 2, Visio, Mindmap.
  • Team size: 4 members.
Sep 2015 - Nov 2015
3 months

Rollout Manager / Coordinator, Support

  • Planning and coordination of a rollout.
  • Planning and preparation for relocating the company headquarters to a new building.
  • Coordination and alignment with suppliers and subcontractors.
  • Stakeholder management.
  • Preparation of hardware (system staging) and executing tests.
  • Executing the hardware rollout and dismantling old hardware at the client.
  • Planning and implementing the relocation of workstations and the network, including rolling out new network components.
  • Data maintenance, documentation, and reporting.
  • Consulting activities and scheduling appointments.
  • Using Windows 7/8.1 Pro, Outlook 2010/2013, MS Project, Mindmap, Visio.
  • Team size: 5 members.
Jul 2015 - Present
10 years 9 months

Internet Marketing

  • Developing additional income streams through internet and affiliate marketing.
  • Designing and implementing online marketing strategies.
  • Building and managing online channels and partner programs.
Mar 2015 - Jul 2015
5 months

Consultant

  • Process optimization at a packaging industry company.
  • Optimizing complaint management.
  • Training employees on new or adapted processes.
Dec 2014 - Present
11 years 4 months

Entrepreneur

  • 3D printing and design in the field of product development and prototyping.
  • Development of products and prototypes as well as custom solutions for various customer requirements.
Dec 2014 - Present
11 years 4 months

Entrepreneur

  • Setup and operation of a 3D printing and design business.
  • Development of custom solutions, including homologation of vehicles for the German market.
  • Concept, design, and production of 3D-printed components and products.
Feb 2014 - Mar 2015
1 year 2 months

PMO

  • Development of new processes in telecommunications, media, and IT.
  • Establishment of reporting and controlling structures.
  • Monitoring and coordinating the timely delivery of project results.
  • Development of new products and migration of existing products.
  • Preparation, follow-up, and execution of international meetings and workshops.
  • Support of project and program managers.
  • Requirements management.
  • Documentation and quality assurance of project documents.
  • Budget and resource planning.
  • Creation of reports for internal and external communication.
  • Management of open item lists and risk & issue lists.
  • Creation and consolidation of protocols.
May 2012 - Jan 2014
1 year 9 months

PMO

  • Planning and definition of a new NGTV/IPTV platform (Entertain).
  • Conducting as-is and to-be analyses, including requirements management for the hardware platform and future products.
  • Definition of the NGTV/IPTV product, including requirements, RFP, workshops, and evaluation.
  • Building a prototype and selecting the vendor.
  • Support during contract negotiations.
  • Reporting to program management and executive management.
  • Stakeholder and vendor management.
  • Documentation of the definition and planning of the RFP and prototype.
  • Preparation for project start with the selected vendor.
  • Internal role assignment and definition of project roles.
  • Creation and maintenance of the business case, project plan, open item list, risk list with evaluation, and exception plan.
  • Alignment and documentation of acceptance criteria.
  • Project documentation and controlling in terms of schedule, budget, resources, and quality.
  • Creation of management reporting.
  • Setup of a test lab and preparation of test scenarios for hardware and software, including documentation, evaluation, and recommendations for DTAG management.
Jul 2011 - Apr 2012
10 months

Project Leader

  • Project leadership in a government environment.
  • Conception, management, and implementation of a confidential project (no further details can be provided due to contractual obligations).
Sep 2010 - May 2011
9 months

Product Manager

  • Development of an offline billing solution for consumer DSL within an existing IT structure.
  • Definition of all required processes in collaboration with involved departments and vendors and their implementation.
  • Process analysis and process design.
  • Creation of role descriptions and alignment with departments.
  • Moderation and mediation of process workshops.
  • Role coaching.
  • Support for process managers in refined process design.
  • Advisory support for the rollout process.
  • Direct contact with more than 40 stakeholders.
Jul 2010 - Feb 2011
8 months

Project Lead

  • Expansion of IPTV product availability for Alice customers on TDe DSLAMs at HVT sites shared with HanseNet.
  • Ensuring IPTV availability over VDSL and ADSL connections.
  • Planning, testing, rollout, and acceptance of hardware and software.
  • Handover of the solution to regular operations.
Nov 2009 - May 2010
7 months

PMO, Project Lead

  • Setup of a lab environment for a mobile carrier.
  • Implementation of a customer solution to provide CES and IMA services between mobile base stations and switching centers over ADSL2+ and SHDSL links.
  • Planning, documentation, and setup of the lab environment.
  • Design of test cases and execution of field tests.
  • Preparation of decision papers for management.
Jun 2009 - Dec 2010
1 year 7 months

Project Lead, PMO

  • Planning and implementation of the interconnection between the public NGN of a German carrier and the public NGN of a Spanish carrier in Germany.
  • Involvement in defining and specifying the NGN interconnect.
  • Development of a standard in collaboration with the German carrier.
  • Analysis and presentation of potential savings by using SIP interconnects instead of TDM interconnects.
  • Consideration of the technology shift from PSTN/ISDN circuit switching to packet-switched Next Generation Networks.
  • Contribution to the technical design of the NGN interconnect according to current technology and AKNN guidelines.
  • Review of transition scenarios between NGN and PSTN/ISDN connections.
Aug 2008 - May 2009
10 months

Project Lead, Process Manager, Consultant

  • Development of an alternative connection to the leased line using SHDSL and ADSL.
  • Planning and technical rollout of the required hardware.
  • Setup of a test lab.
  • Training of the involved departments.
  • Definition of all needed processes in collaboration with involved departments and vendors and implementation of these processes.
Apr 2008 - Nov 2008
8 months

Project Manager

  • Design and implementation of a new SS7 network.
  • Migration of SS7 signaling from the existing network to the new SS7 network.
  • Improvement of stability, scalability and redundancy of the SS7 network.
  • Introduction of new functionalities to increase flexibility and reduce costs of existing and new products/product features.
  • Introduction of a MAP gateway to optimize mobile destination routing.
  • Integration of SS7 application servers via IP.
Oct 2007 - Mar 2008
6 months

Project Manager

  • Decommissioning a data center after prior migration.
  • Documenting existing hardware, networks and services using reverse engineering.
  • Defining required hardware, network components and services going forward.
  • Planning and executing the migration of services, hardware and network.
  • Stakeholder management and coordinating the migration with application owners and customers.
  • Dismantling all hardware components and handing the location over to the owner.
  • Documenting the final hardware and service landscape.
Apr 2007 - Mar 2008
1 year

Project Manager

  • Reducing costs while delivering a more highly available network with extended product capabilities.
  • Migrating SDSL customers to new SHDSL DSLAMs and decommissioning the previous Lucent platform.
  • Developing a migration database to move customers from the old SDSL platform to the new SHDSL platform.
  • Defining all required processes together with departments, suppliers and customers.
  • Developing processes such as platform/network expansion process, cancellation process, customer contact process, migration process, new customer process and Lucent-Stinger decommissioning process.
  • Coordinating the technical migration.
  • Stakeholder management and communication management with customers to align between technical teams and marketing.
Jul 2006 - Oct 2006
4 months

Project Manager

  • Development and integration of a VoIP solution.
  • Defining all required processes in collaboration with involved departments and the customer, and implementing them.
  • Connecting the customer to the carrier's VoIP Class IV platform.
  • Documenting the processes, interfaces and integrations.
  • Solution acceptance and handover to operations.
Jun 2006 - Oct 2007
1 year 5 months

Consultant, Technical Project Manager

  • Defining a DSL product for a mobile network operator.
  • Conducting contract negotiations and supporting product development.
  • Providing the platform and rolling out necessary hardware and software.
  • Defining all required processes together with departments, suppliers and the customer, and implementing these processes.
  • Connecting the customer to the carrier's systems.
  • Documenting the processes, interfaces and integrations.
  • Handover of the solution to operations.
Dec 2005 - Oct 2006
11 months

Technical Project Lead, Rollout Manager

  • Building and rolling out a telecommunications network.
  • Setting up Points of Presence (POPs).
  • Defining all needed processes in collaboration with departments and suppliers and implementing them.
  • Connecting sites to the backbone and expanding the backbone.
  • Documenting processes, sites, connections, and approvals.
Dec 2005 - May 2006
6 months

Project Lead

  • Setting up a DSL connection via an alternative carrier to DTAG.
  • Defining all needed processes in collaboration with departments and customers and implementing them.
  • Developing and introducing processes like cancellation process, customer contact process, change process, new customer process, and migration process.
  • Connecting the customer to the carrier's systems.
  • Documenting processes, interfaces, and connections.
  • Developing a critical chain process.
Sep 2004 - Jul 2005
11 months

Project Lead

  • Expanding a network and a VPN network for an insurance company.
  • Rolling out hardware and taking on administrative tasks in the network environment.
Jul 2003 - Sep 2003
3 months

Consultant

  • Optimizing the complaint handling process in a packaging industry manufacturing plant.
  • Planning, implementing, and training on new processes.
  • Introducing new complaint tools and providing related employee training.
Jul 2002 - Mar 2003
9 months

Project Lead

  • Europe-wide VPN connection of military depots and sites using various technologies (fiber optics, E1, etc.).
  • Coordinating technical implementation and provider connections.
  • Direct contacts with more than 30 stakeholders.
Jul 2002 - Mar 2003
9 months

Carrier Project Manager

  • Restructuring and merging multiple regional employment offices.
  • Resource optimization and setting up a call center.
  • Restructuring and expanding voice and data connectivity.
  • Planning and implementing an automated voice information system with a multilingual angel function.
  • Connecting multiple sites to a data center.
Nov 2001 - Jun 2002
8 months

Carrier Project Manager, Technical Consultant

  • Connecting a German agency to a carrier's systems for voice data transmission.
  • Defining processes and interfaces.
  • Planning and documenting the technical implementation.
  • Direct communication with over 50 contacts.
May 2001 - May 2002
1 year 1 month

Rollout Manager, Coordinator

  • Rolling out ATMs in Germany.
  • Coordinating the installation of the machines.
  • Integrating the ATMs into the customer network.
  • Coordinating the commissioning at several hundred locations.
  • Direct communication with over 40 contacts.
Jun 2000 - Feb 2001
9 months

Project Manager, Rollout Manager

  • Planning and expanding the German backbone of a US carrier.
  • Procuring hardware and resources.
  • Planning, rolling out, and implementing the backbone expansions.
  • Direct contacts with over 70 stakeholders.
Feb 2000 - Jun 2000
5 months

Project Manager

  • Connecting all sites of a transport company via IP-VPN.
  • Planning and implementation, including hardware and software rollout.
  • Defining and implementing all required processes in collaboration with the involved departments.
Mar 1997 - Dec 1998
1 year 10 months

Project Leader

  • Introduced SAP R/3 in a trading and manufacturing company in the packaging industry.
  • Responsible for implementing the SD, MM, and WM modules.
  • Developed the concept and the product "Telesales" (programmed by SBS).
  • Provided training and support for the SD, MM, and WM modules.
  • Took on multiple roles, including IT department head, subproject leader for the SD/MM/WM modules, consultant, Telesales product manager, trainer, rollout manager, and support manager.
Dec 1995 - Jan 1999
3 years 2 months

Project Leader, IT Manager

  • Optimized processes and established an IT department in a trading company.
  • Managed the IT department.
  • Oversaw process management and workflow optimization.
  • Managed the order processing department.
  • Provided consulting in IT and organizational areas.
  • Built and maintained data management.
  • Worked as a data analyst.
Jan 1995 - Dec 1995
1 year

Consultant, Trainer, Project Leader, Rollout Manager

  • Planned and rolled out Novell networks, servers, and workstations with peripherals in the medical sector.
  • Provided training on MS Office products and industry-specific software and hardware solutions.
  • Served as a network consultant, trainer, purchasing manager, project leader, rollout manager, data manager, and data analyst.

Industries Experience

See where this freelancer has spent most of their professional time. Longer bars indicate deeper hands-on experience, while shorter ones reflect targeted or project-based work.

Experienced in Manufacturing (13 years), Automotive (11.5 years), Telecommunication (10.5 years), Advertising (10.5 years), Information Technology (10 years), and Government and Administration (6 years).

Manufacturing
Automotive
Telecommunication
Advertising
Information Technology
Government and Administration

Business Areas Experience

The graph below provides a cumulative view of the freelancer's experience across multiple business areas, calculated from completed and active engagements. It highlights the areas where the freelancer has most frequently contributed to planning, execution, and delivery of business outcomes.

Experienced in Project Management (26.5 years), Information Technology (18 years), Product Development (17.5 years), Production (11.5 years), Marketing (10.5 years), and Operations (7.5 years).

Project Management
Information Technology
Product Development
Production
Marketing
Operations

Skills

  • Prince2

  • Critical Chain

  • Itil

  • Okr

  • Jira

  • Confluence

  • Itop

  • Aris Toolset

  • Ms Office

  • Ms Project

  • Ms Access

  • Ms Excel

  • Ms Power Point

  • Lotus Notes

  • Chilli Projects

  • Ms Sharepoint

  • Hpqc

  • Hpsm

  • Tcp/ip

  • Atm

  • Sdh

  • Frame Relay

  • Sap R/3 Sd

  • Sap R/3 Mm

  • Sap R/3 Wm

  • Circlon Operate Asset Management

  • Soti

  • Unix

  • Linux

  • Os X

  • Windows Nt

  • Windows 2000

  • Windows 3.x To 11

  • Banks

  • Development Bank

  • Authorities

  • Public Sector

  • Military

  • Telecommunication

  • Mobile Networks

  • Providers

  • Education

  • Instruction

  • Training

  • Healthcare

  • Insurance

  • Logistics

  • Industry, Trade And Manufacturing

  • Packaging Industry

  • It System Houses

  • Internet Providers

  • It Service Providers

  • Data Center

  • Building Materials

Languages

German
Native
English
Advanced

Certifications & licenses

PRINCE2, Project-Management Business Skool London Certificate No. 4348563

Project-Management Business Skool London

Profile

Created
Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions

Frequently asked questions

Do you have questions? Here you can find further information.

Where is Dirk based?

Dirk is based in Reinbek, Germany.

What languages does Dirk speak?

Dirk speaks the following languages: German (Native), English (Advanced).

How many years of experience does Dirk have?

Dirk has at least 28 years of experience. During this time, Dirk has worked in at least 31 different roles. The average length of individual experience is 1 year and 8 months. Note that Dirk may not have shared all experience and actually has more experience.

What roles would Dirk be best suited for?

Based on recent experience, Dirk would be well-suited for roles such as: Project Management; Coordinator, Data Management; Tester, Consultant; PM-Office Coordination | PMO; Data Analyst.

What is Dirk's latest experience?

Dirk's most recent position is Project Management; Coordinator.

Which industries is Dirk most experienced in?

Dirk is most experienced in industries like Manufacturing, Automotive, and Telecommunication. Dirk also has some experience in Advertising, Information Technology (IT), and Government and Public Administration.

Which business areas is Dirk most experienced in?

Dirk is most experienced in business areas like Project Management, Information Technology (IT), and Product Development. Dirk also has some experience in Production/Manufacturing, Marketing, and Operations.

Which industries has Dirk worked in recently?

Dirk has recently worked in industries like Manufacturing, Automotive, and Advertising.

Which business areas has Dirk worked in recently?

Dirk has recently worked in business areas like Product Development, Production/Manufacturing, and Marketing.

Does Dirk have any certificates?

Dirk has 1 certificate: PRINCE2, Project-Management Business Skool London Certificate No. 4348563.

What is the availability of Dirk?

Dirk will be available from March 2026.

What is the rate of Dirk?

Dirk's rate depends on the specific project requirements. Please use the Meet button on the profile to schedule a meeting and discuss the details.

How to hire Dirk?

To hire Dirk, click the Meet button on the profile to request a meeting and discuss your project needs.

Average rates for similar positions

Rates are based on recent contracts and do not include FRATCH margin.

1000
750
500
250
Market avg: 660-820 €
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.