Hazem (Gamal) Khatarey
Civil Engineer
Experience
Area Construction Manager
Exyte GmbH
Serving as Construction Area Manager on a large-scale pharmaceutical production facility project for Eli Lilly in Alzey, Germany, with a total investment of €2.3 billion. The facility is intended for the manufacturing of injectable medications such as Mounjaro (Tirzepatid) for diabetes and obesity treatment and is scheduled to begin operations in 2027.
I was responsible for leading the structural and logistical execution of key buildings, including: B06 – Material Transfer,B08 – ASRS / Automated Warehouse & Logistics, B10 – Receiving, Shipping, Maintenance & Warehouse. My duties included managing deep foundation works under varying soil conditions (rammed piles, bored piles, and strip footings), as well as full coordination and execution of precast concrete structural systems, delivery logistics, on-site erection, quality control, and interface planning with adjacent buildings.
- Full technical and organizational responsibility as Construction Area Manager for buildings B-06 / B-08 / B-10, all built using precast concrete systems.
- Supervised the construction and compliance of the fire-rated separation wall (Firewall) in building B-08, ensuring safe and code-compliant installation.
- Led all aspects of precast concrete erection, including delivery schedules, SLOT coordination, temporary staging areas, crane operations, and installation QA/QC.
- Daily management of work permits, including review of Safe Plan of Action (SPA) and Last Minute Risk Assessments (LMRA).
- Enforced strict adherence to PPE usage and site-wide HSE protocols.
- Coordinated activities with subcontractors, Engineering resolved technical conflicts, monitored work sequencing, and ensured proper use of logistics resources.
- Managed delivery planning and SLOT windows to optimize logistics and prevent site congestion.
- Maintained reporting standards: Daily Reports on progress, manpower, safety, and deliveries. Weekly Reports comparing actual vs. planned work and identifying key risks. Monthly Reports detailing KPIs, milestone progress, and recommended actions.
- Coordinated media and utility services with the infrastructure team.
- Oversaw interface management with surrounding buildings (B-02 / B-04 / B-09 / B-14) to maintain uninterrupted workflows.
- Executed deep foundation works, including rammed piles, bored piles, and strip footings, in coordination with geotechnical engineers. Reviewed foundation plans and monitored daily hammer blow counts (ramms) to validate pile performance and production targets.
- Managed precast concrete erection from delivery to final positioning, ensuring structural accuracy, alignment with shop drawings, and compliance with safety standards.
- Oversaw construction in pharmaceutical environments, including cleanrooms and technical areas, ensuring civil work aligned with building system requirements.
- Administered construction acceptance (Abnahme) processes, documented inspections, and submitted packages per German regulations and client procedures.
- Supported project closure through final documentation and coordinated handover to project stakeholders.
- AutoDesk ACC · Sitelog · MS Project · AutoCAD · Microsoft Office Suite · Lean Construction · Takt Planning
- English was the primary working language used in over 95% of project communications and documentation due to the American client Eli Lilly. Arabic was used for internal coordination and technical discussion, and German was applied in field communication with subcontractors and local authorities.
Project Manager Engineer Fibre-optic -(LPH 8-9)
Deutschen Telekom AG
Field of Fiber optic ,Directed and supervised civil and road construction for the "FTTH at Deutsche Telekom" project, ensuring quality, compliance with deadlines, and safety standards. Facilitated site meetings to streamline fiber optic cabling for the "FTTH, FTTX Biedenkopf, Marburg" project, prioritizing construction quality and on-time delivery.
- Conducted FTTH surveying for civil engineering works and fiber optic connections to homes, with key responsibilities including:
- Assessing current project statuses and performing on-site evaluations.
- Managing the construction and maintenance of fiber optic and copper networks, coordinating subcontractors in civil engineering, cabling, and house connections.
- Ensuring seamless construction processes, inspecting site results, and providing technical guidance to industrial personnel.
- Planning and scheduling workforce deployment and material resources.
- Addressing construction issues promptly, preparing measurements, and documenting progress through GIS and photographic records.
- Handling smaller side projects, maintaining construction diaries, and producing technical reports for infrastructure projects involving cables and pipelines.
- Supervising client service providers for subsoil exploration, utilizing GIS and SAP tools for site planning and management.
SS/Civil Engineering Project Manager - (LPH 8-9)
Siegfried Pharma Chemikalien Minden GmbH
Civil Engineering Department Organization of execution. Responsible for construction supervision and project management in the trades of interior finishing for production buildings, façade construction, cleanroom technology, high- and low-voltage systems, ventilation, cooling and air conditioning systems, building automation, process automation, process and technical equipment, pipeline construction, and security systems. The activities included construction monitoring and management tasks for the new production building of Siegfried Pharma Chemikalien Minden GmbH with a project value of €100 million. The goal was to ensure optimal installation according to the client's requirements and to standardize processes for efficient and successful project realization.
- Coordination of the services of all stakeholders and disciplines involved.
- Compilation of cost deviations compared to the previous project phase, with explanations of the discrepancies.
- Identification of the need to involve specialists and sub-project managers.
- Maintenance of a detailed project journal.
- Acting as the client's representative on-site, leading the construction implementation according to the project organization.
- Protecting the client's interests on the construction site.
- Ensuring interdisciplinary coordination of works on the building and its equipment.
- Coordination of specialized site managers for individual trades.
- Conducting quality controls for construction execution (inspection and test plans).
- Performing quality and risk management during the construction phase.
- Daily inspection of on-site construction activities and visualization of progress.
- Participation in weekly and daily meetings (Jour-Fixe), including documenting discussions.
- Supporting the overall project manager in contract management and contract controlling .
- Reviewing compliance with safety regulations and documenting adherence to PPE (personal protective equipment) rules.
- Assisting with testing, commissioning, and functional inspections of buildings and systems.
- Organizing and participating in interim and final acceptance processes, including issuing approval recommendations.
- Reviewing revision documents and verifying their completeness.
- Monitoring and documenting construction progress ( actual vs. planned ).
- Implementing measures to address schedule deviations in coordination with project management.
- Preparing a timeline for defect rectification and warranty-related approvals.
- Developing an overview plan for the warranty timelines of all structures and components.
- Façade Construction: Concept and planning completed; installation initiated. Coordination of remaining work and resolution of conflicts.
- Structural Work, Doors, Tile Finishing: Coordination of remaining tasks and conflict resolution.
- Drywall Construction: Managing remaining work despite space constraints and late deliveries.
- Elevators and Installations: Coordination of installations and resolution of conflicts.
- Steel Construction Installations:External pipe bridge: Planning completed, remaining work coordinated. Ventilation platform: Concept in progress, handover to Köster for implementation planned. Stair tower: Detailed design completed, remaining tasks coordinated. GMP platform assembly: Support provided for execution.
- Assisted with regulatory approvals and ensured the provision of necessary documents.
- Participated in weekly meetings with the construction company Köster GmbH.
- Attended Siegfried meetings to align project requirements.
- Took part in construction coordination meetings to ensure progress and interdisciplinary collaboration.
Project Manager Engineer for Electromobility
Tokheim Service GmbH & Co. KG - Dienstleister Der Mobilitätsbranche
Field of management of electric mobility infrastructure projects for the construction of charging stations at Aldi, Lidl, Rewe and petrol stations across Europe.
- Managing the complete project lifecycle, from planning to execution, ensuring quality standards and timelines are met.
- Advising clients on-site regarding the implementation of electrical installations.
- Coordinating and supervising installation teams to ensure efficient and compliant execution.
- Preparing and maintaining comprehensive project documentation in adherence to quality standards.
- Collaborating effectively with back-office teams and sales to align project outcomes with client requirements.
Project Manager Engineer Fibre-optic - (LPH 8-9)
Vitronet Gruppe
Field of fiber optic house connection, Management and supervision of civil engineering and routing tasks in the "FTTH at the end customer Deutsche Telekom , LEOnet" project, ensuring quality, deadlines, and safety standards. Coordinated site manager meetings to align on the construction process for fiber optic cabling in "FTTH, FTTP, FTTX Rötz/Bad Kötzting.
- Planning and monitoring adherence to schedules for external companies' construction activities.
- Developing a schedule and defining key work processes for civil engineering and routing stages.s
- Preparation of the construction manager's schedule and presentation of the current status to the overall project manager.
- Deadline tracking, control, and documentation of the ordered and delivered items based on the previously defined schedule.
- Responsible for personnel planning, as well as equipment and material disposition.
- Performance and quality control responsible for measurement preparation, invoicing, documentation, and post-trade management handling and invoicing of construction sites.
- Customer-oriented and quality-conscious execution of tasks.
- Utilization of railway-specific EDP applications, e.g., BRZ, and proficiency in VOB and MS Office.
- Entrepreneurial and budget-conscious decision-making.
- Responsible for work preparation, quality assurance, accident prevention, invoicing, documentation, acceptance procedures, and complaints management on the construction site.
- Coordination of interdisciplinary teams consisting of own employees and subcontractors.
- Responsible for the economical use of vehicles and machinery.
- Supervise construction site cordoning and accident prevention measures.
- Responsible for the preparation and execution of turnover planning and order monitoring.
- Measurement in fiber optic road construction using software (Leica Measure System, MESSRAD-VOLLRAD-D318-UMFANG1M running measurement system).
- Documenting the daily report with photo GIS system and photo documentation in the Geographical Information System.
- Inventory of quantities and materials consumed at the site warehouse by the supplier company for each week.
- Preparation of a performance log for outside contractors.
- Preparation of a construction diary.
- Preparation of specialized reporting (technical documentation) in the relevant areas.
Project Manager Engineer
Saudi Binladin Group
Field of interior design, architecture, and renovation projects for houses, apartments, and offices, focusing on technical oversight and coordination.
- Participating in team meetings to resolve project issues, coordinate plans, and ensure smooth execution.
- Inspecting and controlling construction quality for foundations, basements, roofing, plumbing, window installations, interior finishes, facades, and furniture work.
- Managing structural engineering tasks, including mass determination, performance specifications, and on-site inspections.
- Overseeing project management, including construction scheduling, invoice verification, and execution checks.
- Leading 3D CAD modeling using Autodesk Navisworks and Intergraph Smart Review, as well as design planning with AutoCAD systems.
- Organizing master data and collaborating with a 30-member team to develop a new application for enhanced mobile computing.
- Conducting professional development reviews and ensuring all project communications are in English and Arabic.
Project Manager Civil Engineer- (LPH 5-9)
Boehringer Ingelheim Pharma GmbH & Co. KG
Field of Architecture and Structural Engineering – Chemical Plants,Managed architectural packages for an API plant being planned in Rhineland-Palatinate, Germany. The first package involved an in-situ concrete structure valued at approximately 12 million EUR, while the second package focused on steel construction, valued at 1.5 million EUR. A potential future package includes the architectural interior, with an estimated value of 8.5 million EUR.
- Supported preparation of price documents (LV) and design tender specifications using the AVA program.
- Checked execution on-site and performed mass determination according to execution plans.
- Developed performance specifications and conducted cost estimation and calculations based on construction plans.
- Prepared price comparison lists and verified invoices in line with execution plans.
- Established and reviewed the construction schedule.
- Participated in object and TGA planning for residential construction projects (LPH 1-5) and coordinated with segment leaders.
- Attended team meetings to resolve technical issues and review project plans, while maintaining filing and master data.
- Planned and led professional development reviews.
Underground Construction Project Manager-(LPH 1-9)
Thales Deutschland GmbH
Field Civil Engineering Served as a Construction Manager in the railroad environment and infrastructure for a rail network operator, providing services in construction coordination and foundations within civil engineering as part of the overall project.
- Coordination of tasks at the interface to the customer DB and its UANs as well as Thales UANs within the project DKS (planning and construction of foundations for signals, shaped signals, and cable cabinets).
- Managed coordination with the customer on various topics, including soil surveys, explosive ordnance sounding, search shafts, and ecological construction supervision.
- Collaborated with internal firms contracted by Thales on key topics such as PT1 planning, marking of signal locations, providing expert opinions for signal foundation recommendations, and foundation work.
- Emphasized strong organizational skills in planning, controlling, and maintaining accountability in accordance with VOB regulations and compliant trading practices.
- Oversaw the planning of the construction process to ensure alignment with project objectives.
- Held control and responsibility for the overall construction project.
- Conducted continuous monitoring, documentation, and optimization of the construction process to enhance efficiency.
- Ensured compliance with quality standards, schedules, and budgetary constraints for the respective construction project.
- Managed the installation and commissioning of railroad control systems, ensuring they were ready for operation.
- Acted as the primary interface and contact person for adjacent departments, subcontractors, and customer representatives involved in the construction project.
- Ensured adherence to all applicable regulations and guidelines to maintain project integrity and safety.
Construction Engineer; Site Manager- (LPH 1-9)
MIKU Natursteine GmbH
Field Construction Management and Supervision Responsible for managing and supervising the construction work of external companies for the tiling trade, focusing on quality, costs, deadlines, and coordination of tiling for 243 bathrooms in the "Hotel Scandic Munich" project.
- List of Services According to HOAI Specifications: Basic determination.
- Schedule Compliance: Preparation and monitoring of compliance with schedules for the construction activities of contractors in the tiling area.
- Coordination of External Work: Coordination of the external work on the construction site at Hotel Scandic Munich / Obj. Street 28, 81673 Munich.
- Schedule Preparation: Preparation of a schedule and definition of all necessary work procedures for the bathrooms in the tiling trade.
- Regulatory Compliance: Monitoring and compliance with valid regulations from the construction plan.
- Construction Diary: Creation of a construction diary.
- Deadline Tracking: Control and documentation of ordered services and deliveries based on the previously drawn-up implementation plan.
- Performance Monitoring: Tracing external performance and creating corresponding protocols.
- Specialized Reporting: Specialized reporting in the field of tile installation.
- Design Review: Review of contractor's design and construction documents for accuracy.
- Safety Control: Safety control of the construction site and coordination to maintain work safety.
- Overall Project Documentation: Preparation of overall documentation about the project at Hotel Scandic Munich, including:Technical documentation Time schedule Performance record of external companies.
Civil Lead Engineer (LNG-GPP Plant)
Linde GmbH, Engineering Division
Field of Architecture and Structural Engineering Division – Chemical Plants (LNG and GPP Plant, Ust Luga Gas Processing Complex, Russia) Main responsibilities of the Architectural Lead Engineer for Basic Engineering Design Phase: covering project phases from Pre-FEED through FEED/EPC/EPCM.
- Main responsibilities of leading the team on the projects: Worked in a range of refineries, gas, and petrochemical plants for various local and international clients.
- Review and comment on the Basic Engineering Design Package (BEDP): Reviewed and commented on the BEDP documentation (4 revisions) done by the engineering subcontractor (RDI Russian Design Institute).
- Review and comment on the BUILDING 3D model: Reviewed and commented on the BUILDING 3D model (10 revisions) elaborated by the HVAC engineering subcontractor.
- Review of project execution schedule: Reviewed the project execution schedule developed by the Cost and Planning Department and developed a detailed schedule for Civil Engineering and Design activities.
- Elaboration of MTO and document delivery schedule: Elaborated MTO (accuracy ±10%) based on engineering subcontractor(s) input and issued document delivery schedules for RDI Engineering subcontractor(s) up to the 3rd issue, including all necessary expediting (progress controlling and claim management) to achieve the above.
- Supervision and coordination of RDI work packages: Supervised technical, commercial, and timely coordination for the RDI work packages done by engineering subcontractor(s). Generated general technical input documents applicable for the work packages (e.g., project specifications, typical, etc.) in close coordination with the Architect Lead Engineer of the GPP plant.
- Team operation and policy compliance: Checked and ensured the operation of the team to meet project requirements and adhere to Company Health, Safety, Environmental, Security, and Quality Policies.
- Interface coordination: Coordinated interfaces between RDI Engineering subcontractor(s) and LINDE disciplines (Dresden – Pullach – India) and developed mitigation measures to avoid or counteract delays or cost overruns.
- Management of engineering projects >10,000,000 EUR: Managed the engineering of global industrial projects exceeding 10 million EUR, including scheduling, claim management, and technical supervision of engineering subcontractor(s).
- Liaison with Project Engineer: Liaised with the Project Engineer regarding information required by Design Engineers and CAD Group. Coordinated with other Groups and Clients as necessary.
- Responsibilities with Revit 3D and BIM 360 collaboration software: Main responsibilities of Revit 3D and BIM 360 collaboration software by Autodesk.
- Responsibilities with 3D-CAD viewing software: Main responsibilities of 3D-CAD viewing (Autodesk Navisworks and Intergraph Smart Review).
- Consulting on safety regulations: Provided consulting regarding compliance with safety regulations of all trades and performed technical inspections of project progress on-site.
- Technical exchange with customers and grid operators: Conducted technical exchanges with customers and grid operators.
- Communication in English and Russian: All reports, project-related correspondence, and written and verbal communication were in English and Russian.
Site Manager Fibre-optic Cabling - (LPH 1-5-8)
Deutsche Telekom AG
Field of fiber optic Managed and supervised and telephone cable civil construction projects, focusing on house connections and road construction for Deutsche Telekom.
- Coordinating subcontractors and assigning them to specific construction sites.
- Overseeing on-site execution, including fiber optic installations and asphalt construction.
- Supervising civil engineering and road construction activities to ensure quality standards and compliance.
- Conducting quality assurance checks for civil engineering works and fiber optic laying.
- Performing measurements for final invoicing and ensuring accurate documentation.
- Organizing site setup for earthworks and civil engineering tasks.
Project Manager Engineer (LPH 1-9)
Khatarey Engineering Office
Field of Architecture and Civil Engineering Extension and conversion of a residential building into a 3-family house. Planning and construction with a common Auto-CAD system.
- Service Specifications and Execution: Tendering service specifications with AVA program, checking execution on-site, and determining quantities according to execution plans. Creating service descriptions.
- Cost Management: Cost estimation and calculation based on execution plans, price comparison, and invoice verification.
- Construction Scheduling: Drawing up and reviewing construction schedules.
- Technical Drawing and Planning: Creating, printing, and modifying drawings in Auto-CAD and Revit. Participating in object and TBE planning (LPH 1-7).
- Team Coordination and Data Management: Attending meetings to resolve technical issues, coordinating with team members, and maintaining storage and master data. Managing professional development and architectural goals with segment leaders.
- Site and Civil Engineering Management: Managing site setup, earthwork, concrete work, shoring, dewatering, and demolition, following DIN 18 305 28.
- Energy Audits and Efficiency: Conducting energy audits for HVAC, electrical, and lighting controls, evaluating lighting systems, and installing energy management routines.
- Review and Monitoring: Reviewing architectural, mechanical, or electrical plans and monitoring HVAC systems for efficiency.
- Electrical and PV Systems: Installing, maintaining, and testing electrical systems. Designing custom photovoltaic (PV) systems and coordinating solar designs for residential and commercial buildings.
- Customer and Resource Management: Acting as the contact for partner customers, providing cost overviews, consulting, and system planning. Handling grid registration.
Architect, Site Manager – (LPH 1-5)
Department of Agriculture and Construction
Field of Architecture and Civil Engineering Specializing in agriculture and construction.
- Site Manager / Civil Engineer: Supervision of construction files, including documentation. Construction management of demanding building construction projects. Supervision and control of deadlines, costs, and quality.
- Coordination: Implementation of necessary agreements and coordination with construction companies, specialist planners, and experts. Modifying and adapting design plans for farm buildings (LPH 3).
- Tendering and Applications: Tendering service specifications with the AVA program. Compiling building applications (LPH 4). Participation in implementation planning (LPH 5).
- Execution and Planning: Determination of quantities according to execution plans. Service descriptions. Check execution on-site. Draw up and review the construction schedule.
Architect, Site Manager – (LPH 1-5)
Reiner Bierbach Architecture Office
Field of Architecture Specializing in house construction, apartment renovation, house renovation, and school renovation.
- Conducted local measurements to ensure accurate assessments.
- Prepared CAD as-built plans for effective project documentation.
- Developed comprehensive renovation concepts tailored to project requirements.
- Managed the tendering of service specifications using the AVA program.
- Coordinated necessary agreements and communication with construction companies, specialist planners, and experts.
- Planned and executed projects utilizing CAD applications for design accuracy.
- Determined quantities based on execution plans to facilitate resource management.
- Created detailed service descriptions to guide project implementation.
- Conducted on-site execution checks to ensure compliance with design specifications.
- Developed and reviewed construction schedules to maintain project timelines.
Project Manager Engineering - (LPH 1-9)
Dorsch International Consultants GmbH
Field of Architecture and Civil Engineering Focused on the Car Maintenance Center & Showrooms for Range Rover, Mercedes-Benz, BMW, and Jaguar (EPC/EBC Contract) – Kuwait, GCC
- Led all team meetings to address technical and project issues, coordinated with team members, and reviewed project plans.
- Directed engineering, procurement, and construction (EPC) activities to ensure project quality and compliance with standards.
- Oversaw structural engineering and building construction tasks, ensuring accurate determination of quantities as per execution plans.
- Developed comprehensive service descriptions, performed on-site execution checks, and conducted audits to maintain project standards.
- Managed Material Take-Off (MTO) to ensure precise cost estimation and efficient resource allocation.
- Created and reviewed construction schedules, ensuring timely project delivery and adherence to client requirements.
- Managed factory planning tasks and Auto-CAD engineering processes using standard Auto-CAD systems.
- Maintained storage and master data for efficient project execution and ensured compliance with safety regulations across trades.
- Planned and executed professional development reviews to enhance team capabilities.
- Supervised the installation of solar systems on rooftop structures, coordinating technical requirements with customers and network operators.
- Provided bilingual support, ensuring clear and precise communication in both English and Arabic for all project correspondence.
Site Manager Engineer, Architect (LPH 1-9)
IPF Engineering GmbH
Field of architecture and civil engineering specializing in factory construction, factory production planning, industrial construction, and rooftop photovoltaic/solar systems installation.
- Project Management: Managed projects focusing on factory planning and Auto-CAD engineering, participating in object and TGA planning for industrial, administrative, and residential construction (LPH 1-9).
- Construction Coordination: Planned and executed projects with Auto-CAD, checked on-site execution
- Technical Review and Consulting: Reviewed project progress, maintained master data, and consulted on building permits and safety regulations compliance.
- Service Management: Created service descriptions, verified invoices, and developed construction schedules, ensuring adherence to timelines.
- Stakeholder Interaction: Engaged in technical exchanges with customers and grid operators to meet project specifications and regulations.
Project Manager, HVCK Engineer (LPH 1-9)
CAD4FM UG
Field of architecture and civil engineering specializing in housing construction, factory construction, and industrial construction.
- HVAC Systems and Air Control Solutions: Applied advanced technical troubleshooting to develop and implement efficient HVAC systems. Focused on optimizing air control, ventilation, and heating operations to enhance indoor air quality and achieve energy efficiency goals.
- Plumbing, Heating, and Ventilation Engineering: Engineered and managed the installation of plumbing, heating, and ventilation systems to ensure seamless integration with architectural designs and meet performance standards for thermal comfort and air quality.
- Auto-CAD Design and HVAC Components: Drafted technical drawings and assemblies using Auto-CAD, designing essential HVAC components such as silencers, air outlets, and volume flow controllers, with attention to precision and project specifications.
- Construction Management: Oversaw project planning and construction activities in alignment with HVAC and architectural requirements, ensuring systems met all design and safety standards.
- Control Systems Engineering: Designed and installed control panels to efficiently manage HVAC operations, focusing on adaptability and precise regulation of heating and cooling systems.
- Service and Maintenance: Planned and executed routine maintenance and repairs for HVAC systems to sustain optimal functionality and extend system life.
- HVAC Installation and Compliance: Managed the installation of central heating systems, ductwork, and ventilation systems, ensuring compliance with design and safety specifications.
Architect, Site Manager (LPH 1-5)
Christian Stamm Architekten und Ingenieure GmbH
Field of architecture specializing in house construction, apartment renovation, house renovation, and school renovation.
- Technical Planning and Construction: Utilized Auto-CAD applications for planning and construction tasks.
- Building Applications and Implementation: Compiled building applications (LPH 4) and contributed to implementation planning (LPH 5).
- Project Participation and Measurement: Participated in construction processes and determined essential measurements for projects.
Interior Designer, Architect
The Arab contractors Osman Ahmed Osman & Co
Field of architecture and interior design specializing in house construction, apartment renovation, house renovation, and office design.
- Project Management: Managed projects from planning to execution, ensuring smooth workflow and coordination.
- Technical Planning and Construction: Planned and executed projects using common Auto-CAD systems.
- Data Management: Maintained storage and master data for project accuracy and organization.
- Service Descriptions and Invoice Verification: Prepared service descriptions and conducted invoice verification to maintain cost accuracy and accountability.
Interior Designer, Architect
Self-employed
Field of architecture and interior design focusing on house construction, apartment renovation, house renovation, and office design.
- Architecture and Project Management: Checked execution on-site and created service descriptions. Drew up and reviewed construction schedules.
- Import/Export Management: Managed import and export of decorative items, monitoring inputs and outputs.
- Planning and Implementation: Handled building applications and implementation planning. Participated in construction and determination of measurements.
- Technical and Design Coordination: Planned and constructed using common Auto-CAD systems, managing filing and master data maintenance.
- Room and Interior Design Concepts: Developed room planning concepts, selected color palettes, and prepared textile presentations. Reviewed contractor templates for surface materials.
- Interior Design Management: Managed interior design phases, including concept, schematic, design development, and construction documents.
- Drafting and Presentation: Drafted floor plans, perspectives, 3D views, and material tables for review and presentations.
Summary
I am very interested in buildings, so I see myself as a civil engineer or architect.
On my last construction site, I was in charge of the technical areas. My responsibilities included estimating construction and maintenance work, coordinating building projects, and directing both in-house and external staff.
With my studies in architectural construction, project management, and civil engineering, along with my 14 years of professional experience, I have hands-on skills and in-depth knowledge in the construction sector.
Moreover, I have long-standing experience in preparing proposals, construction management, site organization, and project execution. I also have expertise in rammed earth construction.
Skills
- Construction Site Management
- Autocad Proficiency
- 2d And 3d Modeling
- Sound Design
- Drainage Design
- Technical Architecture Design
- Structural Analysis
- Team Building
- Microstation Knowledge
- Active Directory
- Hardware
- Windows 10
- Analytical Skills
- Civil & Structural Engineering
- Development Of Structural Concepts
- Overall Csa Discipline Lead
- Project Development
- Preparation Of Project Proposals
- Discipline Coordination With Clients And Sub-contracts
- Contracting Of Sub-contractors
- Auditing Of Sub Contracts And Structural Steel Fabricators
- Site Support
- Site Supervision
- Site Engineering
- Expediting
- (Epc) Engineering, Procurement And Construction
- (Feed) Front End Engineering Design
- (Mto) Material Takeoff
- (Lng) Liquefied Natural Gas
- (Gpp) Gas Processing Plant
- (Hvac) Heating, Ventilation And Air Conditioning
- Surveying
- Photo Gis System
- Photo Documentation
- Geographic Information System
- Ftth
- Fttp
- Fttx
- Fttc
- Construction Defects
- Software Skills In Planning And Gis Tools
- Sap Standard Assessment Procedure
- Building Assessments
- Site Coordination
- Supervision Of Project Managers
- Photovoltaic Rooftop System Installation
- Solar Rooftop System Installation
- E-mobility
- Autocad 2d And 3d (Advanced)
- Archicad 2d And 3d (Good)
- Cad- Nemetschek Allplan (Good)
- Autodesk Revit 2d And 3d (Good)
- 3dmax (Good)
- Civil 3d (Good)
- Orca Ava Tendering Software (Good)
- Microsoft Office Applications (Very Good)
- Adobe Photoshop (Good)
- Bim Construction Management (Good)
- Itwo (Very Good)
- Pvsyst Installation System (Advanced)
- Comprehensive Expertise In Building Construction, Residential Housing, Apartment Renovations, House Renovations, School Renovations, Industrial Construction, Chemical Plants, Factory Production Planning, Hvac And Building Services Design, And The Pharmaceutical Sector
Languages
Education
THM Technische Hochschule Mittelhessen
Bachelor of Engineering · Civil Engineering, Structural Design and Planning · Giessen, Germany · 2.2
THM Technische Hochschule Mittelhessen
Bachelor of Engineering · Architecture, Design Planning and Project Management · Giessen, Germany · 2.2
The Higher Institute of Applied Arts 6th of Octobe
Bachelor of Arts · Interior Architecture, Design and Construction · Cairo, Egypt · 2.2
Certifications & licenses
RSA 21
ZTV-SA 97 Und MVAS 1999
Membership in the Hessian Chamber of Engineers
IELTS Certificate
British Council In Cairo
DSH training (C1) DSH 2 certificate
Philosophisch-Theologische Hochschule SVD
Autodesk certificate AutoCAD course
Russian Culture Centre
Adobe Photoshop course at Autodesk
Russian Culture Centre