Gert (W.) Schade

Warehouse Automation Project

Gernsheim, Germany
Experience
Feb 2022 - Dec 2024
2 years 11 months

Warehouse Automation Project

Global LSP (Customer: Industrial)

Client: Logistics service provider. Customers: Hager Group, Boeing, Levis, Kellogg's.

Project:

  • Implementation of a 30.000 sqm distribution center.
  • Development and installation of a WMS and a robotic-driven warehouse and pick/pack workplaces for small parts (50.000 locations).

Role & responsibilities:

  • Phase 1 (2022): Overall project management. App. 15 project coworkers incl. external resources (IT).
  • Phase 2 (2023/2024): Workstream-Lead Automation & Engineering.
  • Finalising the design for the robotics and the conveyor system.
  • Implementation support (commissioning, tests, acceptance).
  • Cross-departmental coordination: Operations, Engineering, Automation, Facility Management (civil eng.), IT.

Results:

  • Close collaboration with customer (Hager Group) and suppliers (robotics, conveyors, racks, sprinkler etc.).
  • Handover of the fully functional automated warehouse section and achievement of the contractually agreed through-put.
Oct 2021 - Jan 2022
4 months

Process Analysis Project

Mid-size Wholesaler

Client: Retail FMCG (BBQ charcoal, flower soil). Customers: DIY markets, retail shops.

Project:

  • Adapt the organisation to the unexpected fast growth.
  • Optimising transport cost.

Role & responsibilities:

  • Analysis and documentation of all main- and side processes.
  • Conducting interviews in all functional areas and development of holistical recommendations for action.
  • Appr. 10 project coworkers (dept. heads, specialists).

Results:

  • Foundation for following detailed analyses - in particular as part of the upcoming ERP implementation - and the realisation of the recommended measures.
Feb 2021 - Sep 2021
8 months

CKD Site Project

Global LSP (Client: OEM)

Client: Logistics service provider, focus on Automotive and Tech. Customers: BMW, Daimler, Volkswagen, Audi, Mahle, Samsung, NCR.

Project scope:

  • RFQs from BMW, Daimler and Audi.
  • CKD-Packing of complete vehicle component sets, sequenced delivery of production material at the assembly line.

Role & responsibilities:

  • Supporting the engineering and sales teams with the analysis and response of complex tenders.
  • Presentation of solutions and offers to the customers.

Results:

  • Awarded by OEM with the project ,,Production line-side supply of material and packaging"!
Jan 2020 - Present
5 years 7 months

SCM Interim Management & Consulting

Schade-SCM

Jan 2014 - Dec 2020
7 years

Director Bus. Development / KAM / Director Implementation

Neovia Logistics (former Caterpillar Logistics)

Jan 2014 - Dec 2014
1 year

Management Consultant (self-employed)

GWS

Jan 2007 - Dec 2014
8 years

Director Solution Design & Implementation (EMENA Region)

UTi Worldwide (now DSV)

Jan 2002 - Dec 2006
5 years

Sr. Manager Inbound Materials

Vector SCM (JV with General Motors)

Jan 1997 - Dec 2001
5 years

Head of plant logistics / ERP Implementation Manager

Rieter Automotive (now Autoneum)

Jan 1995 - Dec 1997
3 years

Project Manager (corporate logistics)

ITT Automotive (now ContiTeves)

Jan 1990 - Dec 1995
6 years
Darmstadt, Germany

Research Associate (Production & Materials Management)

Technical University of Darmstadt

Production & Materials Management.

Automated Dynamic Block Storage

  • Capacity: 30,000 roll pallet locations
  • Channel depth up to 19 roll pallets
  • Shuttles and elevators for pallet handling
  • Development of complex put-away and retrieval strategies with simulation

Automated Pick & Pack Center

  • Highly automated "Kitting Center" with high-bay (55,000 loc.), bin storage (330,000 loc.) and shuttle sorter (140,000 loc.)
  • 170 pick and pack workstations with automatic handling of totes and pallets
Ostrava, Czech Republic

Complete in-house logistics

Czech Republic

ERP implementation at 6 production sites

Mannheim, Germany

EU-DC

Mannheim, Germany

European export hub including 4PL and Track & Trace system

Győr, Hungary
On-site

On-site inbound logistics for the just-in-time supply of ATM assembly

Žilina, Slovakia

In-house logistics for seat assembly and just-in-sequence delivery to the OEM plant

Numerous WMS implementations including complex EDI integrations

Prototype of a Track & Trace system for long-range sequencing

Cairo, Egypt

Regional DC with complex IT-integration, paperless picking

Robotic Bin Storage

  • 50,000 bin locations on 12 levels
  • 30 tote-to-person robots
  • Conveyor system with automatic weight control, carton strapping, and sorting chutes
Pilsen, Czech Republic

Service parts DCs

Dubai, United Arab Emirates

Service parts DCs

Simulation model for an automated dynamic block storage

Grans, France

Tyre-DC

Tel Aviv-Yafo, Israel

Web-based inventory- and call-off system

Summary

Focus on Logistics/SCM since 1990. Various line and staff positions. Warehousing, production, transport, IT, automation. Independent consultant and project manager since 2021.

Languages
German
Native
English
Advanced
French
Elementary
Education
Dec 1990 - Jun 1995

Technical University of Darmstadt

Doctorate · Darmstadt, Germany · good

Oct 1983 - Jun 1990

Technical University of Darmstadt

Diploma in Industrial Engineering, Production & Materials Management · Darmstadt, Germany · good

Oct 1978 - Jun 1983

Main-Taunus Grammar School

Abitur · Hofheim, Germany · good

...and 2 more
Certifications & licenses

Advanced Management Skills

Sales Training "Winning complex sales"

UTi Regional Leadership Development Program

UTi

UTi Leadership Foundations Program

UTi

Rieter Leadership Program

Rieter

Certification according to VDA 6.1

VDA

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions