Marco H.

Senior IT Manager

Reutlingen, Germany

Experience

Sep 2025 - Present
4 months

Senior IT Project Manager – Technical Stream Lead

BEW Berliner Energie und Wärme GmbH

Mar 2025 - Aug 2025
6 months

Senior Program Manager

Wörner Medical & Logistics GmbH

  • Project lead of different Projects / Programs.
  • Carve out – mother company to be sold.
  • Merging subs into our company.
  • Planning new Warehouse: Discussing the structure of the new warehouse and office building with architects and construction companies. Mapping the necessary IT infrastructure.
  • Process optimization: Identify, examine and adapt processes in all departments.
  • IT Security: NIS2 / ISO 27001 dependencies reviewed, and implementation options discussed.
  • Independent Planning, Management, and Completion of Programs: Aligning with corporate goals and stakeholder requirements.
  • Defining Goals, Schedules, and Budgets: Collaborating with relevant stakeholders.
  • Creating and Maintaining Detailed Program Plans: Including risk analyses and communication strategies.
  • Identifying and Proactively Managing Risks, Dependencies, and Challenges: Developing countermeasures.
  • Promoting Cross-Departmental Collaboration and Coordination: Between internal teams, stakeholders, and external partners.
  • Monitoring Program Progress: Regularly reporting status and results to management.
  • Ensuring Adherence to Best Program Management Practices: Continuously optimizing internal processes.
  • Supporting and Mentoring Junior Team Members: Fostering their development and improving knowledge sharing.
Feb 2024 - May 2024
4 months

Senior IT Project Manager (regulated environment KRITS)

TEAG Thüringer Energie AG

  • Overall Project Management “Professional IT Security 2.0”: Responsible for leading and coordinating three sub-projects to improve IT security.
  • Introduction of a Password Manager: Implementing a secure and user-friendly password management system.
  • Restructuring the Login Process: Optimizing and securing login procedures to enhance security and user-friendliness. NIS 2 related implementation of Multi-Factor-Authentication.
  • Introduction of USB Port Management: Implementing a system to manage and secure USB ports to prevent unauthorized access.
  • Planning, Organizing, Controlling, and Monitoring the Overall Project and Sub-projects: Comprehensive planning, organizing, and monitoring of the overall project and individual sub-projects.
  • Conceptualizing the Overall Project Plan Considering Milestones and Specific Goals: Developing a detailed project plan considering milestones and specific goals for successful project implementation.
  • Proactive Measures: Proactively developing and independently implementing measures to meet project goals.
  • Information Security Requirements: Implementing information security requirements according to applicable standards and guidelines.
  • Stakeholder Management: Conducting active stakeholder management to achieve project goals and ensure the satisfaction of all involved parties.
  • Change Management: Moderating changes in terms of effectives change management to support project goals.
  • Reporting: Regularly reporting to management on the progress and results of the project.
Oct 2022 - Mar 2023
6 months

Interim IT Management (Interim CIO / VP IT)

SAF Holland SE

  • Taking Over the Global SAFH IT Team: Leading a global IT team of 58 employees and integrating the Haldex IT team with 32 employees. Planning and implementing the full IT integration of Haldex AB.
  • M365: Implementing and integrating Outlook, Teams, and Active Directory.
  • SharePoint: Customizing SharePoint for collaboration.
  • Data Center: Consolidating and optimizing data centers.
  • Network: Integrating and optimizing network infrastructure.
  • Cyber Security: Implementing Multi-Factor Authentication (MFA) to enhance cybersecurity.
  • ERP Strategy Planning: Developing an ERP strategy considering MS Dynamics and SAP ECC.
  • ITSM Tool Selection and Planning: Selecting and implementing a new IT service management tool.
  • Supplier Selection for Office Hardware: Selecting new suppliers for office hardware and leasing providers.
Sep 2021 - Apr 2022
8 months

IT Interim Manager

Schott AG

  • Ensuring IT operations for over 10,000 Microsoft clients and a Cisco network environment.
  • Managing, planning resources, and operational control of the IT operations team, including escalation management.
  • Organizing, participating in, and conducting regular status meetings to monitor project progress.
  • Developing concepts for optimizing and further developing the IT infrastructure and managing corresponding projects.
  • Taking over and finalizing the IT infrastructure part of a new pharmaceutical production site.
Oct 2020 - Aug 2021
11 months

Senior IT Project Manager (regulated environment, FDA, GMP, ISO27001)

Corden Pharma GmbH

  • Planning and Coordination of 4 Work Packages:
  • Renewal of the Entire Network Infrastructure: Modernizing and optimizing the entire network environment.
  • Renewal of the Data Center Environment: Handing over data center services (DCaaS) to an outsourcing partner.
  • Renewal of Office Hardware: Introducing Windows 10 and Office 365 on new laptops and desktops.
  • Replacement of the Telephone System: Implementing a VoIP solution to improve communication.
  • Structuring All IT Topics: Systematically organizing and managing all IT-related tasks and projects.
  • Prioritizing Projects: Closely coordinating with management to set project priorities.
  • Transformation of the Microsoft IT Landscape: Restructuring and optimizing the IT infrastructure considering cloud and on-premises solutions.
  • Analysis and Migration: Critically reviewing the entire Microsoft IT landscape, inventorying, clarifying dependencies and challenges, migrating critical applications, and implementing security solutions.
  • Investment and Resource Planning: Planning necessary investments as well as scheduling and resource planning for successful project execution.
  • Project Implementation: Executing projects according to the priority list, including monitoring, tracking, and conducting regular and daily SCRUM meetings.
  • Documentation and Quality Assurance: Ensuring documentation and quality assurance of all requirements.
  • Questioning IT Organization: Analyzing and optimizing the IT organizational structure.
  • Creating Acceptance: Involving the ICIG Shared Service Center in all processes to create acceptance and support.
Apr 2019 - Jul 2020
1 year 4 months

Interim Manager IT Carve-out

Trumpf Photonic Components GmbH

  • Managing the IT team, consisting of IT operations and programmers.
  • Preparing and executing IT integration.
  • Leading Sub-projects including Network Expansion (expanding the LAN/WAN infrastructure, including routers and switches), Office Hardware Rollout (procuring, installing, and rolling out new hardware), Data Center Expansion (expanding and optimizing the data center), and Security Aspects (implementing multi-factor authentication, antivirus protection, password manager, and firewall).
  • Dismantling the old environment and separating from the former parent company (network equipment and office hardware).
May 2018 - Mar 2019
11 months

Interim Manager IT Carve-out

Philips Photonics

  • Taking Over the Local IT Team: Leading the local IT team and managing external providers (15 employees).
  • Building a Global IT Team: Establishing a globally operating IT team at four locations (Germany, Netherlands, China).
  • Preparing for Company Spin-off: Preparing for the spin-off on a technical level, IT infrastructure, and services.
  • Maintaining Daily Operations: Ensuring ongoing operations and production processes.
  • Infrastructure Analysis: Analyzing the existing infrastructure (servers, networks, hardware, services).
  • Planning a Global Standalone Operation: Planning a potential global standalone operation.
  • Managing Tenders: Managing tenders for SAP and IT services.
  • Executing the IT Carve-out: Implementing the actual IT carve-out process.
Oct 2016 - Jun 2018
1 year 9 months
United States

Program Manager / Portfolio Management Pharma Production (regulated environment, FDA, GMP)

Eli Lilly / Elanco

  • Advanced planning, execution, evaluation, and leadership of workstreams and projects within a dynamic business portfolio in collaboration with engineering and IT.
  • Conducting CCPM training and applying the Critical Chain Project Management methodology for effective project and program execution.
  • Integrating into the customer environment for dedicated program leadership and building positive professional relationships with customers and employees.
  • Defining project goals, requirements, and assumptions to create project plans and key milestones for multiple parallel workflows and projects.
  • Planning, scheduling, and managing project activities and outcomes to meet goals and project requirements.
  • Developing and implementing integrated program plans, aligning program tactics with business strategies and outcomes.
  • Supporting and leading high-performing project teams that serve as project advocates within the customer organization.
  • Leading, coordinating, supporting, and motivating all project resources to convey a unified understanding of project goals and outcomes.
  • Conducting effective project and program meetings.
  • Planning resources to manage program workload and productivity, as well as effective change and conflict management.
  • Supporting teams to ensure project success with a focus on customer service.
Aug 2016 - Sep 2016
2 months

T&T Senior Project Manager Business Continuity Management

Finanz Informatik – Nord LB

  • Responsible for the work packages Business Continuity Management (BCM), IT & Data Security, and Revision for the Sub-Project Service Infrastructure.
  • Defined services and processes for the client and in cooperation with subcontractors.
  • Established interfaces between the client and subcontractors.
  • Conducted workshops to ensure alignment and understanding.
  • Monitored actions and escalated issues when necessary.
Jan 2016 - Apr 2016
4 months

Multi-Project & Program Management

Bechtle IT-Services / arvato / Bertelsmann

  • Managed international projects for arvato systems / Bertelsmann, including the implementation of a global support service structure in North America & APAC.
  • Led the implementation of F5 & Cisco Firewalls for arvato eCommerce.
  • Directed the WIN 8.1 upgrade for 400 clients across multiple locations in Europe, coordinating dispatchers and onsite technicians during the rollout.
Apr 2015 - Dec 2015
9 months

Senior Project Manager Global Infrastructure (regulated environment, FDA, GMP)

Merck KGaA

  • Supported the overall program management of the global harmonization infrastructure project.
  • Managed the entire project lifecycle for the global infrastructure harmonization.
  • Coordinated regional rollouts to support large ongoing infrastructure projects.
  • Assisted with the coordination of IT aspects for the integration and harmonization of Merck sites.
  • Gathered requirements from stakeholders and coordinated planning with multiple technical and non-technical teams across Europe and UAE.
  • Developed and continuously updated project plans, including milestones and regular calls with IT teams.
  • Prepared and presented status updates to steering committees at various management levels.
  • Monitored project status and risks, identified and prioritized risks early, and escalated issues as needed.
  • Planned disaster recovery for each location with the global DR team.
  • Managed project and budget using the HP-PPMC tool.
Feb 2015 - Mar 2015
2 months

Senior T&T Project Manager – International Outsourcing Project

ThyssenKrupp Materials International

  • Acted as deputy for the Global Network Lead, Global Data Center Lead, and Future Workplace Lead.
  • Managed multiple worldwide rollouts in parallel.
  • Tracked rollout targets in terms of time, budget, and quality.
Sep 2014 - Dec 2014
4 months

Senior Project Manager IT Service Hub Integration APAC

Volkswagen Financial Services

  • Led a frame project consisting of four sub-projects.
  • Built up infrastructure and data center in Singapore.
  • Established a service hub in China.
  • Developed a service catalog covering Singapore and China, including invoicing, payment flow, and pricing of services.
  • Migrated applications from India to the new data center in Singapore.
  • Established a meeting and reporting structure for the projects.
May 2014 - Sep 2014
5 months

T&T Senior Project Manager – ZF Friedrichshafen

Fujitsu Technology Solutions GmbH

  • Managed the international software rollout after a carve-out in 7 countries (1800 clients) within the automotive environment.
  • Coordinated and planned the rollout in the USA, Brazil, Australia, China, Germany (3 locations), France, and Slovakia.
  • Planned software packaging and initiated distribution via SCCM.
  • Planned Day 1 activities and software rollout/installation per location/user in cooperation with local IT.
  • Planned special tasks such as wiping and encryption of clients.
  • Managed user communication together with the customer.
  • Held weekly meetings with local IT.
  • Coordinated local IT during the rollout phase.
  • Prepared status reports for the customer.
Feb 2014 - Apr 2014
3 months

T&T Multi Project Management – Sharp

Fujitsu Technology Solutions GmbH

  • Managed different rollout projects in 11 EMEA countries.
  • EuroServer Rollout: Led the project team, prepared locations, planned the rollout with the customer and rollout team, controlled the budget, and handed over to delivery.
  • DMS (Desktop Managed Service) Rollout: Led the project team, planned the rollout with the customer and delivery team, prepared training sessions for technicians and customer employees, and coordinated with logistics, onsite teams, delivery, and customer.
Jul 2013 - Nov 2013
5 months

T&T Senior Project Manager – NetApp

Fujitsu Technology Solutions GmbH

  • Implemented a new TPM (Third Party Maintenance) contract in 19 EMEA countries.
  • Implemented the new contract in each country in cooperation with local partners.
  • Selected tools and implemented interfaces in the countries.
  • Organized training for technicians.
  • Implemented a meeting and reporting structure.
  • Provided go-live support, monitored call statistics, and SLAs.
Mar 2013 - May 2013
3 months
Japan

Senior Management Consultant

Ginkgo Management Consulting / FUSO Truck & Bus Corporation (Daimler Group)

  • Established and managed the Project Management Office using Houston Project Management Methodology for the Spare Parts System Renewal Project.
  • Supported project management with leadership tasks.
  • Continuously monitored and communicated project status, identified and managed issues and risks.
  • Planned and moderated workshops.
  • Created presentations for management.
  • Documented work results.
Jun 2012 - Feb 2013
9 months
Germany

T&T Senior Project Manager Datacenter and Applications

ComputaCenter, Germany

  • Managed a full outsourcing project in a banking environment – Shared Services.
  • Designed the datacenter environment in cooperation with the Technical Architect.
  • Virtualized applications as far as technically possible.
  • Ordered hardware, licenses, and datacenter space.
  • Arranged work packages with the Operation Centers (OC).
  • Directed the customer application team during the installation and testing phase of banking applications (SFirm32, ATAQ Risk, Gillardon, FinanzAss, Reuters, optical Archive).
  • Managed the cut over to the OC’s.
Sep 2011 - Jun 2012
10 months
Germany

Integration Manager (Coordination of 8 - 10 Projects)

ComputaCenter, Germany

  • Coordinated the project and operation team during the transformation (server and application).
  • Examined and adjusted the handover/cutover process and documents.
  • Established work packages.
  • Set up a reporting structure.
  • Worked closely with the integration manager of the other Operation Centers (OC’s).
Jun 2011 - Jun 2011
1 month
South Africa

IT QA Manager for MAXIMO, N2M (Novell to Microsoft) & CC&B (Customer Care & Billing)

Lodestone / Eskom Project

  • Aligned closely with the IT QA Manager and overall QA manager to enable communication and reporting to executive boards.
  • Established an ongoing quality management function through a permanent risk and issue management process.
  • Contributed to quality reviews for Maximo, N2M, and CC&B.
  • Supported the issue and risk management function.
  • Coached and guided IT project managers.
  • Contributed to weekly status reports for Maximo, N2M, and CC&B.
  • Enhanced the Lodestone QA framework to fit IT QA purposes.
  • Contributed to monthly QA reports following the Lodestone framework for Maximo, N2M, and CC&B.
  • Conducted formal monthly reviews to assess progress and ability to achieve milestone targets, including progress against plan, issue and risk management, and intermediate deliverables.
  • Delivered PowerPoint presentations with major findings and detailed QA review reports (Word) including dashboards, general impressions, challenges, and recommendations.
Feb 2011 - Mar 2011
2 months
Munich, Germany

T&T Project Lead for an International Outsourcing Project

Siemens SIS Munich / Schott AG for EXMACO AG

  • Led an international T&T project team with 60 members.
  • Managed the NW rollout, SAP migration, non-SAP applications, service desk, client rollout, and cutover planning.
  • Managed a budget of 12 million euros.
Nov 2010 - Feb 2011
4 months

T&T Cutover Manager Full Outsourcing (Banking Environment)

Fujitsu Technology Solutions

  • Coordinated and documented the handover/cutover process during the transformation migration phase between current delivery (CMO), transformation streams, and future delivery (FMO) for: Physical Servers, Virtual Servers, Storage, and Applications.
  • Ensured all required documentation was available in SharePoint, including: Assessment by Ready to Service, High-Level Design for Service Operation, and Low-Level Design for Service Operation (Monitoring, SLA, Backup).
  • Worked closely with the Change Manager.
Apr 2010 - Aug 2010
5 months
Singapore

T&T Project Manager Service Desk Rollout APAC for BASF

Siemens SIS Singapore

  • Acted as the direct conduit between the customer and SIS GWSS AP OSS transition & GOSS (Global Operation Support Services).
  • Assisted with enabling GOSS and their Local Country Providers (LCP).
  • Ensured appropriate ramp-up of GOSS selected vendors in all relevant countries, including: tracking agreements with LCPs and escalating as needed, tracking the ramp-up of technical resources utilized by GOSS/LCP in each country, and ensuring LCPs had all access requirements to customer sites and systems as well as Siemens tools and systems.
  • Worked with the Customer GWSS AP OSS Trainer to ensure all required Train-the-Trainer sessions were conducted for LCPs.
  • Tracked Dell certification for GOSS selected LCPs, ensuring all required parties were certified per agreed timelines.
  • Assisted GOSS or their LCPs to ensure they were set up as Authorized Warranty Providers for BASF APAC.
  • Ensured proper knowledge transfer was completed with the incumbent.
  • Managed GOSS/LCPs from a service “cutover” perspective and ensured proper ramp-up/PE exercises were completed prior to go-live.
  • Acted as the single point of contact (SPOC) for GOSS/LCPs post go-live.
Jan 2010 - Mar 2010
3 months
Switzerland

T&T Project Manager SAP Outsourcing, Transition Project, IT Full Outsourcing

Siemens SIS Switzerland

  • Managed the worldwide SAP transfer to a datacenter in Switzerland.
  • Provided project contracts and planned both project and operational aspects.
  • Planned the datacenter equipment for SAP data transfer.
  • Upgraded the system to ECC 6.0.
  • Led the SAP transition team consisting of 10 technicians.
Sep 2009 - Sep 2009
1 month

Consultant for a Separation Project

Matrium GmbH (EADS Group)

  • Assisted management during the planning period.
  • Reviewed proposals and selected providers.
  • Developed concepts for full outsourcing, virtualization, and file and print services.
Jul 2008 - May 2009
11 months
Munich, Germany

T&T Regional Project Manager, Latin America, USA & Canada

Siemens SIS Munich – NSN Project

  • Personally led 3 local project managers.
  • Managed the Siemens-Nokia client transition in Latin America, USA, and Canada.
  • Oversaw CMO, FMO, and proxy rollouts.
Jun 2007 - Oct 2008
1 year 5 months

IT Director / CIO (Permanent Position)

Grundig Intermedia GmbH

  • Defining and continuously adjusting the international IT strategy and standards regarding applications, system landscape, and information architecture.
  • Leading internationally staffed project teams to implement IT strategies.
  • Setting and monitoring the IT budget (€5 million).
  • Creating tenders and selecting and managing service providers using SLAs.
  • Monitoring international IT trends, identifying relevant technologies and processes, and preparing and supporting implementation in collaboration with service providers.
  • Selecting, managing, and coordinating suppliers and service providers.
  • Defining and evaluating KPIs, presenting results to management.

Projects:

  • SAP Implementation ERP 6.0: Resizing the old SAP R/3 system. Cleaning up material and customer master data. Involved departments: Finance, Controlling, R&D, Logistics, Repair, Warehouse.
  • BlackBerry Introduction: Implementing and integrating BlackBerry devices.
  • BI Tool Comparison Analysis: Conducting a comparison analysis for business intelligence tools.
Jun 2006 - Jul 2007
1 year 2 months
Hungary

Manager IT Infrastructure and Operations, Germany, Hungary

CTDI Nethouse Services GmbH (T-COM Group, fixed-term for 1 year)

  • Personnel and technical leadership of the infrastructure and operations team (21 employees).
  • Coordinating all ICT infrastructure projects within the group.
  • Ensuring a goal-oriented, cost-effective, and highly available operation of ICT infrastructure and applications.
  • Monitoring and optimizing the existing ICT infrastructure.
  • Coordinating projects in collaboration with the specialist departments.

Projects:

  • Logistics Solution in Hungary: Establishing and integrating a logistics solution into an existing production environment.
  • Network Expansion: Expanding an existing network environment by 150 workstations.
  • Planning the expansion in coordination with the logistics project team.
  • Coordinating local service providers and contract negotiations.
  • Timely provision of infrastructure.
  • Procuring the necessary IT equipment.
  • Rolling out hardware and software.
Jun 2004 - Present
21 years 7 months

Managing Director

Hoberg IT Services (HITS) Corp. Ltd.

Global Consulting for Project & Program Management

  • Merger & Acquisition (M&A) IT-related: Leading and executing IT-related M&A projects, including due diligence and post-merger integration.
  • Separation, Integration, Carve-out Projects: Planning and implementing separation, integration, and carve-out projects to optimize IT structures.
  • Transition & Transformation Management (T&T): Managing transition and transformation projects to adapt to new business requirements and technologies.
  • Program & Portfolio Management: Managing and overseeing programs and portfolios to ensure the achievement of strategic goals.
  • Business Process Outsourcing: Developing and implementing outsourcing strategies to increase efficiency and reduce costs.
  • International Interim & Project Management: Developing and implementing outsourcing strategies to increase efficiency and reduce costs.
Jan 2002 - Jun 2004
2 years 6 months
Usa, Japan

CIO – USA / EU / Japan

SKW Metallurgie AG

  • Leading an international IT team with 50 direct and indirect employees at 20 locations worldwide.
  • Developing and implementing the global IT strategy, including disaster recovery.
  • Defining standards and guidelines for IT infrastructure and IT operations.
  • IT budget planning for the group (€3 million), IT cost and contract management.
  • Conducting the IT separation of SKW into three modules.
  • Responsible for handling IT outsourcing.
  • Responsible for implementing emerging synergies within the group.

Projects:

  • IT Carve-Out Project (€1.5 million): Separating SKW Metallurgie AG from Degussa AG. Establishing a data center with a backup solution (Compaq & Cisco). Contract negotiations (SLA for LAN, WAN, Exchange, SAP, and UHD services). Outsourcing functions.
  • German-French Integration Project: Infrastructure project with international rollout. Establishing a data center and networking with the main data center in Germany. SLA negotiations with external partners in the telephone, network, and support areas. Implementing SAP R/3 FI/CO, leading 10 external consultants.
  • IT Planning and Execution of an Office New Build: Workplace design (connections for telephone, printer, PC, fax). Floor cabling (sockets, routers, switches, distribution cabinets). Planning the IT move (PC workstations). Connecting to the data center.

Summary

With over 30 years of experience in IT management and consulting, I have honed my skills in leading complex projects and driving strategic initiatives. My expertise spans across various industries, including IT services, steel, consumer electronics, mass production, consultancy, automotive, and pharmaceutical sectors. Here’s a detailed look at my profile:

With extensive experience as a Management Consultant and Project Manager, I specialize in IT Strategy & Outsourcing, including carve-outs, mergers, and Transition & Transformation projects. I have successfully managed global projects for major corporations, holding significant budget and personnel responsibilities.

Key Characteristics: International IT Management: Extensive experience managing IT at the corporate level. Program & Project Management: Expertise in managing international programs and projects. Specializations: Interim Management Cave-out & Mergers Transition & Transformation Outsourcing International Rollouts of Standards, Services, Hardware & Software Management Consulting: Providing strategic advice on IT Strategy & Outsourcing. Business Relationship Management: Serving as the interface between IT and business. Project Management Methods: Proficient in PMBoK, Critical Chain (CCPM), and ITIL. Skills: Strong analytical thinking and communication skills.

Industries: IT Services, Steel Industry, Consumer Electronics, Mass Production, Consultancy, Automotive, Pharmaceutical, Energy supplier

Languages

German
Native
English
Advanced

Education

Oct 1992 - Feb 1995

Berufsförderungswerk Friedehorst Bremen

Retraining as a Communication Electronics Technician, specializing in Information Technology · Communication Electronics Technician · Bremen, Germany

Oct 1982 - Sep 1986

German Armed Forces

Training as a Medic and Nurse · Medic and Nurse · Germany

Aug 1979 - Jun 1982

Bosch Service Bruno Schmidt Bremen

Training as an Automotive Electrician · Automotive Electrician · Bremen, Germany

Certifications & licenses

Certified Novell Engineer

GFN Gesellschaft für Netzwerktechnologie

Microsoft Certified Professional

GFN Gesellschaft für Netzwerktechnologie

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions