Consulting, Seminars, Workshops, and various Projects for the LEAN-INSTITUTE
Kaizen-Workshops (Print company, Chemical Industry, Metal company)
5-S-Workshops and Implementation
JIT-Workshops
LEAN-Assessments and Support (Fitting industry – Metal company)
Valuestream analysis ( Metal industry )
Logistic –Materialflow analysis and Workshop (Food-Industry)
TPM-Analysis and TPM-Workshop ( Chem. Industry)
Consulting for small cap companies (organization and processes )
Advisory service for start-up-companies
Projects
Hired by an English recruiting company to improve the productivity and triple the output of the key-supplier to an English client. In fact it turned out, that the entire organization had to be changed, process improvements and installation of workspace and a reorganization of the logistic system had to happen aside from basic implementation of 5-S, CIP, KPI and Kanban systems. Implementation of standards. Continuous coaching of the General manager. The output was increased by 200% within 8 months
Introduction of Lean-techniques in a SME medical equipment company. Reorganisation of the warehouse to set up an assembly line and to create a one-piece-flow line for individual wheel chairs. Implementation of CIP and 5-S.
Process-analysis and implementing Lean techniques in a laser cutting company. Creation of a CE-9001-2015 environment and received certificate within 9 months.
Coaching and reorganization of a materials management department to change from a day-to-day handling to a more strategic role in a medical device company. Implementation of CIP. Parallel analysis of the parameters and installed processes.
“Re”-setup of a medical device company in Italy in order to get the DIN ISO 9001/ EN13485-certification – the company was certified October 2019.
Interim-Management assignment in the pharmaceutical company to run the Logistic department-reduction of space by 30%-Introduction of 5S and CIP as a day-to-day-business, setup of a visual Kanban-system
Process analysis at a pharmaceutical company of the Intra logistic (Incoming, Warehouse, Shipping, external warehouses) Restructuring workload of the department, set up as a Lean department
SME Project for material flow and layout analysis for improvement and set up of a new building at a medical apparatus manufacturer
SME Project for process flow improvement and installation of One-Piece-Flow, change of planning mode, Installation of KPI) Implementation of CIP in a company for hydraulic hoses
SME Project in Beijing, China at a medical device manufacturer (process flow analysis and improvement – 5S-CIP, installation of KPIs, change of planning mode)
Externalization of sterilization and processanalysis of packaging department at a medical device manufacturer
Discover other experts with similar qualifications and experience