Frank Joraschkewitz

Lead Project Manager

Avatar placeholder
Lindlar, Germany

Experience

Jul 2025 - Present
7 months

Lead Project Manager

Energy Supply Industry

  • Managed a large-scale transformation project to replace a complex multi-provider, multi-technology infrastructure with a unified single-provider platform
  • Had overall responsibility for planning, managing, and executing the migration of all LAN, WAN, and WiFi components at national and international locations under high availability and security requirements (critical infrastructure)
  • Developed and implemented the migration strategy, including a detailed rollout roadmap and risk management plan
  • Directed interdisciplinary project teams and coordinated with service providers and internal stakeholders
  • Ensured compliance with schedule, budget, and quality requirements
  • Introduced standardized operational processes and handed over to routine operations
  • Provided regular, detailed reporting to the steering committee and C-level executives
Jan 2025 - Jun 2025
6 months

Enterprise IT Data Center Architect

Compusafe

  • Developed IT functional concepts for building a data center, considering high security requirements
  • Planned the infrastructure of a data center, including site selection, building design, power supply, UPS systems, network architecture, and rack layouts
  • Created hardening concepts to secure IT infrastructure, including staging processes and security logging mechanisms
  • Coordinated with vendors and service providers to select and implement hardware and software solutions for the data center
  • Conducted risk analyses and security assessments to ensure end-to-end protection of the data center infrastructure
  • Reviewed concepts with a focus on IT infrastructure and IT security
  • Advised on concept development and supported implementation, setup, and operation of the data center
  • Gathered requirements, conducted analysis, and interviewed stakeholders
  • Defined scope and boundaries, considering compliance and security requirements (especially BSI)
  • Captured performance requirements such as throughput, latency, uptime, and resource usage
  • Evaluated future growth requirements regarding scalability, elasticity, and sustainability
  • Designed network architecture considering data volume, redundancy, and security
  • Selected hardware (servers, storage, network devices) and software (operating systems, management tools)
  • Designed server and storage infrastructure (SAN, NAS, cloud) and backups
  • Developed virtualization strategy using VMware, Kubernetes, or cloud virtualization and containerization
  • Planned data backup and disaster recovery (backup frequency, offsite storage strategies)
  • Defined security architecture including network segmentation, firewalls, intrusion detection/prevention, encryption, and access controls
  • Planned load balancing and high availability (failover mechanisms and clustering)
  • Advised on technology selection and potential risks
Aug 2023 - Oct 2024
1 year 3 months

Cloudification of an SAP ESM Environment

E.ON

  • Advised IT architecture management on identifying and documenting involved interfaces and IT systems
  • Identified and coordinated requirements and change requests
  • Created reporting documents for the project work
  • Participated in meetings in a consulting role, including preparing content, solutions, and results afterward
  • Ensured teams understood the backlog content
  • Coordinated on specific topics with other departments
  • Checked the implementation of architectural prerequisites for the cloud move
  • Reviewed corporate guidelines and Azure readiness, as well as prerequisites for the target architecture
  • Independently resolved open questions with contacts
  • Further developed frameworks, methods, and processes
Jul 2023 - Oct 2023
4 months

Technical Project Lead - Network for Data Center/Application Migration

FIS Finanzinformatik System

  • Provided network support for an application migration from a legacy environment (CISCO FabricPath) to a new distributed environment based on CISCO ACI
  • Technically assessed the current and target states and developed and enforced a valid, secure migration path
  • Managed the project with stakeholders and technical staff
  • Led a nearshore team of subject matter experts
  • Assessed and managed project priorities regarding time, quality, and cost
  • Handled change and contract management for additional services and extra orders with customers, suppliers, and third parties
  • Managed incidents, change, and Bambi tickets using Remedy and ServiceNow
  • Centralized documentation of all IT and telecommunication resources in FNT Command to increase operational process efficiency
May 2023 - Sep 2023
5 months
Munich, Germany

Subproject Lead Client Standardization

Landeshauptstadt München

  • Took over subproject lead TP 2.10 Client Standardization in the neoIT program
  • Took on technical work packages in the neoIT TP 2.10 project workstreams
  • Planned and structured the topic complexes
  • Drove and tracked activities
  • Provided support in developing an optimized organizational structure
  • Organized and documented the hardware lifecycle topic
  • Analyzed and documented prerequisites for future target processes
  • Analyzed fundamental optimizations in IT workplace operations
  • Led a workstream
Apr 2023 - Dec 2024
1 year 9 months

Emergency Control Center System Architect

DB Netze

  • Providing technical and specialist consulting for the DiNo-ECC project (digitization in emergency management – Emergency Control Center) at DB Netze AG to optimize the technical architecture
  • Advising and developing a comparison between cloud-based and self-hosted infrastructure operations
  • Designing the technical architecture for the selected option while meeting information security requirements
  • Advising on the selection of suitable cloud providers and hardware
  • Setting up and configuring the selected environment
  • Developing backup & recovery concepts
  • Creating and coordinating a concept for connecting mobile devices
  • Creating test cases
  • Aligning details with project management
Apr 2022 - Sep 2022
6 months

Project Manager for Virtual Emergency Data Center

FürSie Genossenschaft

  • Developing a detailed concept for providing an emergency data center in a co-location (on-premise) and in a private cloud (VMware)
  • Assessing the use of own firewalls and internet connections
  • Collecting requirements and determining solutions
  • Consolidating and gathering information
  • Preparing data at management level and documenting meetings
  • Including GRC aspects in the new emergency concept
  • Reviewing current regulatory and legal requirements and guidelines
  • Planning and coordinating with operational service providers
Sep 2021 - Jun 2022
10 months

Enterprise Architecture Manager for Multi-Cloud Management

DB AG Konzernvorstand

  • Conducting technical and domain review of the existing overall cloud architecture (AWS, Azure) for inherent weaknesses and failure risks
  • Clear presentation, description, and quantitative assessment of failure scenarios and risks
  • Developing optimization approaches and alternative architectures regarding technical design, redundancies, and network connectivity
  • Analyzing ways to improve fault tolerance, availability, redundancy, backup & recovery, IT emergency management, and multi-cloud management
  • Estimating indicative costs for implementing and operating the optimization approaches
  • Considering legal implications and framework conditions
  • Bringing in current insights from the cloud market on technologies and products for data backup
  • Designing and aligning result documents with stakeholders
  • Preparing a recommendation letter for Azure and AWS
  • Collaborating with corporate emergency management and BCM, incorporating new GRC requirements
Aug 2019 - Sep 2021
2 years 2 months
Leverkusen, Germany

IT Application Manager / Carve-Out

Arlanxeo

  • Supporting a carve-out in the non-ERP area to separate the systems
  • Migrating the on-premise environment to Office 365 and cloud solution providers
  • Managing application migrations and being responsible for OT applications (LIMS) and IT applications (XPAT, Documentum)
  • Planning and controlling changes to the complex IT landscape
  • Communicating with project stakeholders and supporting the separation
  • Consolidating internal demand planning and monitoring project progress
  • Managing orders and change orders for additional services and overseeing vendors
  • Supporting the conversion of Active Directory and migrating all Windows-based apps
  • Supporting the migration to Microsoft Azure
  • Advising on creating and cleaning up application-specific permission concepts
  • Redesigning organization-specific permission models structurally and documenting cleanup actions
  • Coordinating project tasks with IT product management and business units
  • Coordinating and tracking changes using Topdesk
  • Putting sub-processes for starters, changers, and leavers into production
Apr 2019 - Jul 2019
4 months
Wuppertal, Germany

IT Manager Consumer Goods Industry

Veritas

  • Building relationships with key stakeholders to ensure IT strategy aligns with business needs
  • Handling new IT requests as part of demand management
  • Ensuring all IT service requirements are captured in the demand portfolio
  • Managing projects according to company methods from initiation to completion
  • Implementing and continuously improving service management processes, including SLA management and reporting
  • Responsible for local IT performance management (financial, SLA, and customer satisfaction management)
Jan 2019 - Feb 2019
2 months

Overall Project Manager / Transition Manager

Dell EMC

  • Consulting on the takeover of IT hardware, services, and processes, as well as shifting operations to a new service provider for an automotive manufacturer
  • Independently planning and managing the transition of a service expansion and its handover to operations
  • Implementing new SLAs
  • Project qualification, initiation, and planning (scope, objectives, milestones, resources, costs) in cooperation with account management
  • Project control using standard PM methods and tools
  • Designing and conducting on-site meetings for project initiation and status handover with clients at the management level
  • Managing projects according to BSI basic protection
  • Designing, planning, and executing data center operations
May 2017 - Oct 2018
1 year 6 months

Program Management Project Steering Network Deployment

Unitymedia NRW GmbH

  • Managing new build, expansion, and retrofit of data centers as part of NO & T network deployments
  • Considering site selection, architectural design, security measures, cooling, and power supply according to DIN 50600
  • Managing planning areas for building and mechanical systems (NE1), civil engineering (NE4), hub design (NE2/NE3), transport/IP technology, TV/video technology, and monitoring
  • Coordinating procurement and proposal evaluation using SAP (actuals, commitments, budget planning)
  • Coordinating data center build activities up to acceptance and handover to network operations
  • Decommissioning old technical sites in Bielefeld and Bad Homburg
  • Preparing network switches to new technical sites and connecting 20 HFC networks
  • Designing according to BSI basic protection and documenting build services
  • Project reporting and change management using Remedy
  • Cost controlling in SAP
Jan 2017 - Apr 2017
4 months
Boston, United States

Project Manager Office 365 Migration North America

Fresenius Netcare GmbH

  • Managing the O365 migration for end users of Fresenius Medical Care in North America
  • Creating the migration plan and designing migration contents and tools
  • Establishing a comprehensive feedback system to monitor and continuously improve the migration
  • Supporting analysis and preparation of migration steps from Lotus Notes to O365
  • Briefing and managing external agencies
  • Operational support of the migration (newsletters, intranet articles, QA site)
  • Managing the Change Agent Community network for local communication
  • Supporting stream leads in change, processes, rollout, infrastructure, as well as legal and compliance
  • Setting up the local team on site in Boston
Aug 2016 - Dec 2016
5 months

Senior Project Manager

Kelvion Holding AG

  • Migrating the existing IT infrastructure from the former parent company to a new environment
  • Identifying applications to be transferred (500-800 applications) from the old AD domain to the new one
  • Adapting corporate standard clients and assessing legacy systems (Lotus Notes) for replacement by Exchange or O365
  • Analyzing service-oriented architectures to find weaknesses and minimize production outages
  • Evaluating server and file server environments and assessing security status (Bitlocker, antivirus)
  • Communicating with around 150 sites worldwide and creating an application catalog
  • Creating and executing the migration plan including risk analysis
  • Providing technical support to the program manager and global IT infrastructure leads
  • Assessing functional applications for criticality, business impact, and dependencies
  • Coordinating with business and application owners for Active Directory authentication
  • Managing escalations and coordinating external partners
Feb 2016 - Aug 2016
7 months

Contractor - Senior Project Manager

GEA

  • Identifying applications to be transferred with local stakeholders
  • Providing technical support in creating milestones and the transition timeline
  • Analyzing and evaluating applications by criticality and planning handover dates
  • Facilitating knowledge transfer meetings (mostly online)
  • Escalation management of follow-up work in neighboring countries
  • Serving as the single point of contact for tower leads from Accenture in Manila and Romania
  • Supporting program management for Accenture and GEA
  • Working with service providers to introduce agile methodologies in application development
  • Quality assurance according to DIN ISO 9001 and knowledge management
  • Communicating with vendors and suppliers and analyzing tickets from SMC
Sep 2015 - Nov 2015
3 months
Brussels, Belgium

Senior Move Group Manager / Service Manager / Architect / Project Manager

IBM / Allianz

  • Analyze and assess the current state of technologies used (data center topologies, LAN/WAN/VoIP, firewall, proxy, storage, backup, LDAP/AD, MS Exchange, Lotus Notes)
  • Develop a strategic roadmap for IT infrastructure areas and prepare technology decisions
  • Draft infrastructure guidelines and concepts for future projects
  • Evaluate product architectures and service portfolios against the target architecture
  • Define technical requirements for projects to modernize technologies
  • Coordinate system design, development, and service management
  • Review project deliverables (architecture concept, technical design, operations manuals, security concepts)
  • Manage technical requirements and evaluate non-functional requirements
  • Create effort estimates and business cases including feasibility analyses
  • Serve as the main point of contact for executive management in Benelux as well as for planned data centers in Paris and Frankfurt
  • Responsible for all reporting and adherence to quality gates
Feb 2015 - Aug 2015
7 months

Process and Demand Manager / Senior Project Manager

Dorma Time and Access

  • Manage demand for data center, network infrastructure, workplace, and service desk
  • Ensure the operation of IT infrastructure according to defined SLAs
  • Implement a global ticketing system
  • Lead and work in Area and Group IT
  • Qualify, escalate, and support problem, change, and incident management
  • Continuously improve service management and define KPIs
  • Implement and optimize service management processes and create reports
Sep 2014 - Dec 2014
4 months

Interim Service Manager

Qiagen Sample and Assay Technologies

  • Manage service for data center, network infrastructure, workplace, and service desk
  • Ensure the operation of IT infrastructure and workplace environment
  • Manage external vendors according to defined SLAs
  • Manage internal and external stakeholders and lead projects
  • Validate processes to provide documented evidence of requirements fulfillment
  • Participate in problem, change, and incident management
  • Implement service management processes using ServiceNow
  • Automate IT workflows and ticketing systems
  • Configuration, asset, and problem management
  • Analyze IT performance and report weekly to management
Mar 2014 - Aug 2014
6 months
Munich, Germany

Senior Country Project Manager / Senior Project Manager

Telefonica O2 / IBM

  • Responsible for the data center transition/transformation move from Munich to Alcala, Spain
  • Transfer a group of applications (as-is to-be) involving external service providers
  • Analyze and evaluate existing CMDBs
  • Coordinate the migration of analog conference and video systems to IP telephony (Central CBX as PaaS)
  • Manage the phases of validation, design, build, cutover, and warranty
  • Review virtualization or modernization of server systems
  • Act as Change Manager for the Remedy system (creation, approval, and management of tickets)
Sep 2013 - Feb 2014
6 months
Germany

Senior Project Manager

ThOLG Thüringen (Thüringer Oberlandesgericht)

  • Responsible for IT infrastructure restructuring measures
  • Work on centralization vs decentralization approaches
  • Focus areas: server consolidation, hardware replacement procurement, operating system updates
  • Migrate Lotus Notes to Exchange and consolidate Exchange
  • Backup and archiving concepts
  • Prepare a merger with ITOS and the IT control center of the Thuringian judiciary
  • Ensure the long-term availability of specialized applications, considering cost-effectiveness and service levels
Jul 2011 - Apr 2013
1 year 10 months

Senior Overall Project Manager / Program Manager

DB Systel

  • Management of the DB WAN Backbone Lot 2 project to upgrade ICT technical rooms at 54 sites in Germany
  • Development and monitoring of the project plan including milestones, resources and costs
  • Reviewing dependencies with other infrastructure projects
  • Support for proof of concept and quality gate reviews
  • Identification and documentation of issues and project blockers (Issue + Risk Log)
  • Management of projects according to BSI basic protection
  • Preparation of a bill of materials with the solution design architect
  • Initiation of procurement processes for provisioning the required infrastructure (rollout management)
  • Implementation of communication structures and regular reporting
  • Execution of project tasks using the S-O-S method (13 success factors for large projects)
  • Development and integration of work instructions into the Remedy ticketing system
  • Creation of operations documentation and process descriptions
Nov 2010 - Apr 2011
6 months

Senior Project Manager

AWO Rhein-Oberberg

  • Consultation on requirements for the system landscape, server farm, application environment and backup strategies
  • Focus on virtualization, user management and security aspects
  • Management of the Virtual Desktop Infrastructure (XenDesktop) and SSL VPN solutions (Access Gateway)
  • Solutions for WAN optimization (Branch Repeater) and monitoring (EdgeSight)
  • Implementation of single sign-on (Password Manager)
  • Single point of contact for internal and external matters
Aug 2009 - Jun 2010
11 months

Senior Project Manager / EMC

Deutsche Telekom

  • Project on compliance and its impact on the office environment
  • Creation of a positioning paper to outline potential benefits when implementing compliance rules
  • Document management and communication of project progress in regular on-site updates
  • Conducting workshops for involved departments to align knowledge
  • Creation of proposal documents for next steps
  • Acted as the single point of contact
Apr 2008 - Mar 2009
1 year

Senior Project Manager - Advisor to the EDC Head

Daimler - Europäisches Rechenzentrum EDC

  • Program/Data Center Management as the central point of contact for the senior management of the EDC
  • Managing interfaces between senior management and lower-level management
  • Ensuring requirements are met in a multi-project management environment
  • SLA management and audits in first level support (on-site and offshore in India)
  • Creation and revision of process documentation and work instructions
  • Managing infrastructure within the data center and coordinating technical contacts
  • Preparation and execution of migrations and installations
  • Analysis of the ticketing system and implementation of action instructions
  • Capacity planning, hardware sizing and facility management (power, climate, security)
  • Emergency management and outage planning for backup power scenarios
  • Introduction of a quality management process according to DIN ISO 9001
  • Creation of relevant metrics for weekly reporting
Oct 2006 - Dec 2010
4 years 3 months

Practice Manager

EMC Consulting

  • Defining scope and boundaries for consulting projects
  • Feasibility analysis and creation of project plans
  • Project cost calculation and definition of milestones
  • Definition of roles and responsibilities
  • Proposal creation and SLA definition
  • Pricing calculations and resource planning
  • Conducting workshops for proposal presentations
May 2006 - Dec 2007
1 year 8 months

Senior Transition / Transformation Manager

EMC / HP

  • Planning the data center transition and coordinating with the team in the USA
  • Reviewing customer data and confirming locations, applications, and storage systems
  • Collecting data, analyzing it, and supporting application mapping
  • Documenting and validating the current inventory
  • Developing data center operating policies, processes, and procedures
  • Estimating level of effort (LOE) for transformation activities and services
  • Defining change requests and maintaining the project plan
  • Managing project issues and problems, including escalations to the PMO
  • Managing costs and determining actuals to date (ATD) as well as estimate at completion (EAC)
Dec 2005 - Mar 2006
4 months

Project Manager

EMC / Otto Versand

  • Implementing a storage class concept to resolve performance bottlenecks
  • Analyzing existing issues and providing appropriate solutions
  • Conducting analysis for data migration to newer storage systems
  • Performing business impact analysis for NOA applications
  • Reviewing implemented fast-restore procedures
  • Creating a disaster recovery plan considering logical database failures
Jun 2005 - Jun 2005
1 month

Project Lead for Preliminary Study

EMC / ING-DiBa

  • Developing a high-level concept for an operations manual in collaboration with the client
  • Elaborating detailed IT infrastructure operations beyond disaster scenarios
  • Focusing on storage topics and related areas
  • Determining timeframes and efforts required for implementation
  • Presenting the results in a workshop setting
Apr 2005 - Sep 2006
1 year 6 months

Manager / Delivery Director

Accenture / EMC Consulting

  • Specialist in information lifecycle management (ILM) and project delivery
  • Responsible for multiple teams across the EMEA region
  • Conducting sizing and cost estimation for large projects and coordinating project activities
  • Providing strategic management in heterogeneous industrial environments
  • Advising on storage consolidation, data protection (backup/DR), and process design according to ITIL and CMM
Jan 2005 - Dec 2005
1 year

Senior Consultant

Capgemini / Vodafone

  • Executing a plan-build-run project for new workstations
  • Setting up the first Global Service Operations Center (SOC) for Vodafone
  • Transitioning to live operation for MMS service and mobile streaming in Italy, Germany, Portugal, and Spain
  • Customizing personalized workstations in a listed building
  • Addressing technical challenges such as limited load capacity and cooling (chilled water systems)
  • Planning building services and implementing high-availability concepts
Jan 2004 - Nov 2004
11 months

Product Manager

Capgemini / Hewlett-Packard Germany GmbH

  • Development of new strategies and concepts for customer relationship management
  • Focus on Information Lifecycle Management (ILM) for different data sources and types
  • Creation of archiving concepts for growing amounts of data
  • Consideration of legal regulations and retention periods (up to 30 years)
  • Definition of access rights, security, and data protection for system failures (RAID, replication)
  • Establishment of QoS policies for data retrieval
Mar 2003 - Jan 2004
11 months

Staffing / Knowledge Manager

Capgemini Telecom Media Networks

  • Planning personnel and project assignments for national and international requests
  • Development of a knowledge architecture to optimize business processes
  • Setting goals, strategies, and milestones
  • Collecting best practices and lessons learned
  • Consolidation of budgets and costs for projects
  • Coordinating knowledge management and providing project teams
Dec 2002 - Feb 2003
3 months

Consultant

Capgemini / Arcor AG

  • Implementation of an inventory system
Dec 2002 - Dec 2002
1 month

Security Auditor

Capgemini / Allianz Slovakia

  • Conducting a security audit for Allianz in Slovakia
Aug 2002 - Nov 2002
4 months

Consultant

Capgemini / Vodafone

  • Support in developing an operational concept
Mar 2002 - Aug 2002
6 months

Architect

Capgemini / Deutsche Telekom AG

  • Support in creating a common language for IT architecture
Mar 2002 - Aug 2002
6 months

Architect

Capgemini / T-Mobil

  • Support in creating an architecture framework
Dec 2001 - Feb 2002
3 months

Security Consultant

Capgemini / T-Online International AG

  • Security concept for standardizing the dial-in password
Oct 2000 - Jun 2001
9 months

BCM Consultant

Capgemini / T-Online International AG

  • Development of a disaster recovery concept, emergency management, and business continuity management (BCM)
Apr 2000 - Oct 2000
7 months

Consultant

Allianz Versicherung AG

  • Concept for developing international standards
Sep 1999 - Mar 2000
7 months

Application Group Manager

Compuware / Ford Werke AG

  • Management of application groups for Ford Werke
Oct 1998 - Sep 1999
1 year

System Engineer

debis / Westdeutsche Landesbank

  • Setup and maintenance of data warehouse infrastructure
Oct 1986 - Oct 1998
12 years 1 month
Cologne, Germany

System Programmer and Administrator (Group Leader)

Deutsche Krankenversicherung AG Köln (ITERGO)

  • Design, development, testing and optimization of back-office applications for health and life insurance
  • Planning and designing the IT architecture for client/server applications
  • Designing and implementing internal network architecture, including an intranet
  • Maintenance and tuning of network components and software
  • Management of operational software in host and client/server environments (OS390 mainframe)
  • Introduction of new system software components and management of external networks
  • Migration planning for network components and application-oriented software
  • Fault management and security analysis of LAN, WAN, and MVS systems
  • Development of single sign-on and reliability concepts
  • Project management according to BSI basic protection
  • Design, planning and execution of data center operations
  • Establishment of user help desks and capacity planning
  • Implementation of backup procedures for host and client/server
  • SNI coupling of MVS systems and migration planning of CICS application data

Summary

Frank Joraschkewitz is an experienced IT and project manager with over 39 years of professional experience in IT architecture, cloud management, governance risk compliance (GRC), and business continuity management (BCM). He has successfully participated in projects in industries such as telecommunications, automotive, healthcare, and financial services. His specialties include planning, optimizing, and leading data centers and network architectures. Frank is certified in ITIL, DIN EN ISO 9001 and has extensive knowledge in architecture management, service delivery, carve-out, and emergency management. He was involved in projects for companies such as E.ON, Deutsche Bahn, Unitymedia, and Deutsche Telekom, where he developed cloud migration strategies, led complex IT transformation projects, and optimized IT infrastructure. Frank stands out for his strategic thinking, leadership skills, and the ability to work in various international and interdisciplinary teams. His strong communication skills and experience in risk management make him a valuable consultant and project manager for demanding IT projects and transformations.

Skills

  • Architecture Management (Adm)

  • Service Model Design

  • Infrastructure Operations Management

  • Grc (Governance, Risk, Compliance)

  • Security

  • Security Risk Assessment

  • Big Data Systems

  • Soa

  • Office365

  • Lotus Notes

  • Sap Erp

  • Workplace Design

  • Cloud Architect

  • Vtsp Accreditation Emc/vmware

  • Auditor For Qm Systems Din En Iso9001:2008ff

  • Storage Technology Foundation

  • Itil Foundation

  • Bsi Basic Protection

Languages

German
Native
English
Advanced

Education

Lorem ipsum dolor sit amet

High School Diploma

University of Applied Sciences Bochum

Communications Engineering · Bochum, Germany

University of Dortmund

Civil Engineering · Dortmund, Germany

...and 1 more

Certifications & licenses

Security Clearance SÜ2

Federal Office for the Protection of the Constitution

Working with Virtual Machines

Auditor for QM Systems according to DIN EN ISO9001:2008ff

BSI Basic Protection

Creating Virtual Machines

ITIL Foundation

ITIL Foundation V3

MVS System Programmer

Storage Technology Foundation

VMware Infrastructure Architecture

VMware

VMware Infrastructure Networking

VMware

VMware Infrastructure Storage

VMware

VTSP Accreditation

VMware

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions

Similar Freelancers

Discover other experts with similar qualifications and experience

Andreas Antoni
Andreas Antoni

Project Manager for Network and Infrastructure Project Migration EU/US/MEX

View Profile
Christian Fritsch
Christian Fritsch

Architecture management

View Profile
Alagi Mansaray
Alagi Mansaray

Senior Project Manager S4HANA in the energy sector

View Profile
Luca Pacor
Luca Pacor

ERP Program Manager

View Profile
Andreas Fischer
Andreas Fischer

Project Manager & Portfolio Owner for Infrastructure (Automotive)

View Profile
Thomas Hartung
Thomas Hartung

Project Manager & Tender Manager

View Profile
André Görst
André Görst

IT Consulting Project Management / Engineering Subproject Management

View Profile
Peter Fleischer
Peter Fleischer

Subproject Manager and Solution Architect - Microsoft 365 Transformation

View Profile
Pierre Gronau
Pierre Gronau

Ansible Automation, Windows Third Level Support

View Profile
Miguel Skirl
Miguel Skirl

Senior System and Cloud Engineer

View Profile
Jens Rehsack
Jens Rehsack

Technical Product Owner

View Profile
Stephan Krausenegger
Stephan Krausenegger

Migration Coordination

View Profile
Ralf Barthel
Ralf Barthel

Test manager and subproject leader

View Profile
Christian Decker
Christian Decker

Managing Director and Senior Consultant

View Profile
Lothar Hinsche
Lothar Hinsche

Solution Manager for PoC investigation and replacement and refinement of an existing cloud and IoT power plant control system

View Profile
Samir Soliman
Samir Soliman

Project Manager in the Cybersecurity Department

View Profile
Georg Danebrock
Georg Danebrock

Senior Project Manager

View Profile
Sami Bejaoui
Sami Bejaoui

Director IT Architecture & Infrastructure Management

View Profile
Dirk Behringer
Dirk Behringer

Senior Consultant Database Administration and SQL

View Profile
Joshua Brück
Joshua Brück

Client Management Support / Onsite Support

View Profile
Oliver Frömel
Oliver Frömel

Senior IT Enterprise Security Architect | Project Bank Migration

View Profile
Kenan Šabić
Kenan Šabić

Enterprise Architecture

View Profile
Jürgen Kasch
Jürgen Kasch

Cloud & IT Service Management with Azure & ServiceNow (freelance)

View Profile
Thomas Richter
Thomas Richter

Tender for Workplace Services and M365

View Profile
Stephan Le anh
Stephan Le anh

IT all-rounder

View Profile
Jin-ho Yun
Jin-ho Yun

Server Migration Consultant

View Profile
Tom Heinrich
Tom Heinrich

Infrastructure Design and Implementation

View Profile
Mustafa Kederoglu
Mustafa Kederoglu

Senior Network Design and Engineer

View Profile
David Bleyer
David Bleyer

Acting Partner

View Profile
Mahmoud Tadjallimehr
Mahmoud Tadjallimehr

Strategy Consultant, Organizational Developer

View Profile