The migration of the ADSL lines decommissioned by Vodafone/Telekom at DB Systel must be carried out successfully and on time or replacement solutions initiated in good time so that the asset types affected by DB S&S do not fail and operations are ensured
Refinement of the “project documentation”, in particular objectives and tasks of the work packages, stakeholders & communication channels
Creation and maintenance of the central activity plan of the central project, especially TP3
“Free” resource currently → operations manual IoT and LoRaWAN
Familiarization as parental leave substitute for the project manager
Create and maintain project documentation, develop improvements in project structure and setup
Drafting an activity list
Jul 2021 - Present
4 years 1 month
Software/Hardware Administrator
BBH GmbH (Witbau Group)
Administrative support for the maintenance and servicing of the server and telecom infrastructure of the Witbau Group
Jun 2021 - Present
4 years 2 months
Project Management and Quality Assurance (PM & QA)
Deutsche Bahn
Technical project management in construction execution for various transit station projects, including the ADSL migration project and the BSS ReInvest project (DB-owned GSM-R sites)
Content review of existing plans per base station (professionally sound evaluation of the plans, determination of compliance with the site conditions and current state on location)
Conducting, monitoring, and reporting/monitoring of plan research
Technical and substantive analysis of defects and definition of corrective measures required per issue
Commissioning and monitoring of corrective measures
Tracking and documentation of corrective measures including escalation actions, proposal and commissioning of possible alternative solutions, determination of impact on rollout planning (e.g., postponement of sequence, alternative swap date) in coordination with regional project management
Preparation and execution of site inspections and meetings
Structured documentation and reporting of the status of existing plans with their current status
Oct 2018 - Jan 2021
2 years 4 months
VIVO Subproject Lead
BVG
As part of the project “Improved Video Equipment and Quality at Berlin U-Bahn Stations,” 128 stations are to be equipped with video technology by end of 2021
Recording established and still required work packages for the project
Determining resource requirements and balancing with available resources
Identifying risks and developing countermeasures
Developing proposals to optimize the project
Planning and monitoring room modifications for VIVO IT&C
Review, process, and control of planning documents for HOAI service phases 1-8, and checking the filing of work packages in phase 8
Apr 2018 - Oct 2018
7 months
Project Manager/Controller
Deutsche Bahn
Provision of planning, coordination, reporting, and verification services for Deutsche Bahn within the TOPKO project as project manager/controller
Management of the new fire alarm system construction in Kiel
New build and renovation of announcement centers and public address systems in Kiel/Lübeck & Braunschweig/Göttingen as part of the BASA and Telekom connection changes to IP-based lines
Aug 2017 - May 2018
10 months
Germany
Senior Rollout Solution Manager
Brunel GmbH
Providing planning, coordination, reporting, and verification services for the maintenance of radio sites for BDBOS (Federal Agency for Digital Radio of Authorities and Organizations with Security Tasks) in the “User Support” project activity. This includes planning the contractually obligated maintenance calendar for the sites, data management of maintenance personnel, scheduling maintenance appointments with the prescribed access authorization process, and required telephonic and electronic communication with both maintainers and the customer
Customer support, troubleshooting, and assistance for 50Hertz on Microsens, Ericsson, ECI, Nokia, and Keymile systems in the pilot and live networks
Support for CISCO IT network planning
Support and review of network planning for DWDM/SDH/PDH networks
Commissioning of devices from the above manufacturers
Inspection and measurement of fiber optic links
Jan 2015 - Jul 2016
7 months
Belgium
Project Support & Management Toll Enforcement
STRABAG-BeNeLux/EFKON AG
Planning for deployment of mobile FRSEs for the Toll Enforcement project
Training all operators in Brussels, Wallonia, and Flanders regions on building up and dismantling mobile FRSEs for 24/7 heavy truck tolling (from 3.5 tons) since 01.04.2016
Quality and SLA reporting, hotline support, quality management
Assignment and monitoring of operators including follow-up training
Personnel leadership and support
May 2015 - Dec 2015
8 months
Project Support & Management BDBOS BOS.net
STRABAG-PFS
In addition to tasks similar to AIRBUS for this project, supporting process development for STRABAG workflows, contributions in security and key management, assistance in clarifying unclear contract situations, support and training of STRABAG staff in BDBOS processes and procedures, and more.
Oct 2011 - Apr 2015
3 years 7 months
Project Support & Management BDBOS BOS.net
Cassidian/AIRBUS
Providing planning, coordination, reporting, and verification services for the maintenance of radio sites of BDBOS in the “User Support” project activity. This includes planning the contractually owed maintenance calendar for sites, data management of maintainers, scheduling maintenance appointments with the prescribed access authorization process, and necessary telephonic and electronic communication with both maintainers and the customer.
Mar 2011 - Aug 2011
6 months
IT and Telecom Administrator
Family Life Balance GmbH
Planning and design of the new IT and telecom infrastructure
Preparation of bid documents and detailed concepts
Procurement, setup, and commissioning of all new equipment
Integration of legacy technology into the new infrastructure
Development and implementation of test and backup concepts
Restructuring and expansion of the POS system
Integration of VoIP telephony into the telecom system
Analysis of business processes and their integration into IT infrastructure
Creation, backup, and restoration of databases
Comprehensive documentation and handover documentation
Sep 2010 - Apr 2011
8 months
IT Administrator (Maintenance, Emergency Support)
DM GmbH
Administration of user rights
Measuring, adjusting, and configuring server systems
Analysis of business processes and their integration into IT infrastructure
Capturing, planning, coordinating, and integrating customer requirements
Comprehensive documentation and handover documentation
Oct 2009 - Sep 2010
1 year
IT Administrator
Weinladen Schmidt GmbH
Setup and maintenance of IT network technology
Connecting all branches to headquarters via VoIP
Development and implementation of test and backup concepts
Network planning and implementation
Analysis of business processes and their integration into IT infrastructure
Capturing, planning, coordinating, and integrating customer requirements
Maintenance and expansion of branch POS systems
Comprehensive documentation and handover documentation
Sep 2009 - Apr 2010
8 months
Planning, Procurement and Setup IT and Telecom
DM GmbH
Planning and design of the new IT and telecom infrastructure
Preparation of bid documents and detailed concepts
Procurement, assembly, and commissioning of all new equipment
Setup of value-added services (Telekom)
Connecting sites via VoIP and integrating VoIP phones
Integration of legacy technology into the new infrastructure
Development and implementation of test and backup concepts
Analysis of business processes and their integration into IT infrastructure
Creation, backup, and restoration of databases
Comprehensive documentation and handover documentation
Jul 2009 - Sep 2009
3 months
Media Consultant
Kabel Deutschland Vertrieb und Service GmbH
Consulting and planning for end customers on KDG products
Comprehensive documentation
Aug 2008 - Jun 2009
11 months
IT Administrator
Karl Behrens GmbH
Planning and design of the new IT and telecom infrastructure
Preparation of bid documents and detailed concepts
Procurement, setup, and commissioning of all new equipment
Setup and maintenance of telecommunications
Quality assurance / quality management
Integration of legacy technology into the new infrastructure
Development and implementation of test and backup concepts
Analysis of business processes and their integration into IT infrastructure
Creation, backup, and restoration of databases
Hardware maintenance, software maintenance and distribution
Comprehensive documentation and handover documentation
Dec 2007 - Jul 2008
8 months
Communication Technician
RSR Datacom GmbH
Setup, support, and troubleshooting of customer systems before delivery
Head of test and laboratory for new hardware and software
Coordination of hardware and software releases for deployment at DB
Participation in the creation of technical bid documents
Contribution to the creation of technical and customer-specific materials
Preparation of test specifications and execution of system and load tests
Execution and documentation of acceptance tests
Participation/management of time- and budget-critical customer projects
Planning and implementation of reference systems for error analysis at customer sites
Comprehensive documentation
Jun 2007 - Oct 2007
5 months
Product Manager
Telebau Elektro- Fernmeldetechnik GmbH
Field sales for major clients (Media Markt, Saturn, etc.)
Support of major and end customers with technical issues
Apr 2007 - Apr 2007
1 month
Doha, Qatar
IT Consultant
The Planning Council
Advising the IT department under ITIL and CMM perspectives
Analysis of business processes
Leading team meetings for process analysis
Creation of customer-specific materials for implementing ITIL and CMM
Comprehensive documentation
Nov 2005 - Dec 2005
2 months
Düsseldorf, Germany
IT Consultant
TKT Teleconsult GmbH
Team leadership/project management for the entire WiMAX project
Setup and commissioning of WiMAX (Airspan AS.MAX)
Comprehensive documentation
Preparation of extensive planning and concept materials
Preparation of extensive test specifications and functional test materials
Monitoring and conducting load and functional tests
Protocol analysis in Layer 2 and Layer 3 to stabilize performance
Trial setup in Düsseldorf for pilot operation in Germany
Extensive measurements of transmission quality in the WiMAX network
Training of ARCOR staff in the use of WiMAX technology
Regular team meetings for optimal project execution
Oct 2004 - May 2005
8 months
Berlin, Germany
Franchisee
Vobis Branch
Owner-operated VOBIS branch with four employees
Extensive workshop operations
Preparation of customer-specific offers and materials
On-site support and installation upon customer request
Support of customers with service and/or maintenance contracts
Oct 2003 - Dec 2004
3 months
IT Consultant
TKT Teleconsult GmbH
SRA-L assembly (UMTS)
Leadership of an installation team
Material procurement per customer requirements and site documentation
Preparation of extensive planning and concept materials for installation
Performing commissioning after installation
Performance optimization through adjustments in installation and parameters
Execution and documentation of acceptance and functional tests
Regular team meetings to optimize workflows
Sep 2000 - Mar 2003
2 years 7 months
Project Manager
TKT Teleconsult GmbH
Interim technical head at TeleLev
Construction planning te-com/Telekom
Project support for METEOSAT II satellite station (EUMETSAT)
Setup and support of IT and telecom at TKT
Team leadership or project management, usually reporting to the managing director
Independent management of time- and budget-critical projects
Leadership of teams or departments of up to 30 employees
Regular communication with all internal and external project stakeholders
Contracting and overseeing external service providers
Monitoring and involvement in preparation of all project-specific documentation
Personnel management and motivation
Analysis and optimization of business processes
Apr 1999 - Sep 1999
6 months
Operations Technician
Mannesmann Mobilfunk
Setup, troubleshooting, configuration, and support of OMC/MSC
Preparation of test specifications and execution of functional tests
Aug 1987 - Mar 1999
11 years 8 months
Telecommunications Technician (Employee)
DeTeWe AG
Test manager for the EWSD test and training system
Introduction of ISO9000 in the test and training system
Support of the reference system for DTAG
Execution and documentation of tests for new software releases before commissioning
Technical support of system lab EMD technology (12.1993–03.1997)
Mar 1987 - Jul 1987
5 months
Telecommunications Technician
DeTeWe AG
Test manager in the EWSD test and training system
Languages
German
Native
Education
Oct 1992 - Jun 1995
State Technical School Berlin
Communications Engineering · Berlin, Germany
Oct 1978 - Jun 1983
Grammar School
Oct 1972 - Jun 1978
Primary School
Certifications & licenses
PMI Project Management Professional
PRINCE2® 7th Edition Foundation in Project Management
PRINCE2® 7th Edition Practitioner in Project Management
PRINCE2 Agile® Foundation in Agile Project Management
PRINCE2® 6th Edition Foundation in Project Management
Certified SAFe 5 Product Owner / Product Manager
Certified SAFe 5 Scrum Master
Driving License Class A
Driving License Class A1
Driving License Class AM
Driving License Class B
Driving License Class BE
Driving License Class C1
Driving License Class C1E
Driving License Class L
Similar Freelancers
Discover other experts with similar qualifications and experience