Wilhelm H.

Project Manager / Senior Consultant

Ostenfeld, Germany

Experience

Jan 2022 - Dec 2024
3 years
Germany

Project Manager / Senior Consultant

Bundesverwaltungsamt

VS NfD.

Tasks:

  • VS NfD

Results:

  • VS NfD

Additional services:

  • Representing the client in workshops and meetings with other federal authorities
  • Representing the client to the BSI – aligning security requirements

Methods: BSI basic protection, NdB user obligations Tools: MS-Project, Sharepoint

Jan 2022 - Dec 2024
3 years
Germany

Project Manager / Senior Consultant

Generalzolldirektion

Modernization of the connection of customs control centers to the BDBOS digital radio network.

Tasks:

  • Providing a coordinated, feasible solution
  • Coordinating the solution with the involved authorities
  • Technical and organizational integration into a larger federal police project
  • Preparing implementation

Results:

  • Developed technical solution
  • Concept for an alternative connection

Additional services:

  • Representing the client in workshops and meetings with other federal authorities
  • Representing the client to the BSI – aligning security requirements

Methods: BSI basic protection, V-Model Tools: MS-Project, Sharepoint

Jan 2021 - Dec 2024
4 years
Germany

Senior Consultant

BDBOS

The German authority radio network is being modernized.

Results:

  • Defined process for the transition to operations
  • Responsibility matrix and adjusted processes for test operations
  • Optimized work preparation for installation/migration of radio sites
  • Error processes as part of the restructuring measures
  • Optimization of risk management in the project
  • Adjusted procurement and provisioning processes
  • Definition of new processes for operational changes

Additional services:

  • Interface between product development, testing, and rollout project

Methods: BDBOS project system Tools: MS-Project, Sharepoint, Confluence, Jira

Jan 2021 - Dec 2022
2 years
Germany

Senior Consultant / Project Manager

Sen GPG Berlin

The existing application for collecting data on women's protection facilities in the state of Berlin is to be replaced, and the processes adapted to the new digital solution.

Tasks:

  • Designing the application
  • Capturing/adapting processes for digitization
  • Gathering requirements (operational and technical)
  • Preparing and conducting the tender process

Results:

  • Adapted business processes
  • High-level application concept
  • Complete tender documents
  • Documentation for a possible future continuation of the project The project was not continued due to budget cuts.

Methods: PMP, BSI basic protection Tools: MS-Project, Sharepoint

Jan 2021 - Dec 2021
1 year
Germany

Project Manager

Dataport AöR

Development of person search and free search for authorities in the states of Hamburg, Saxony-Anhalt, and Schleswig-Holstein. Adapting the data model to the new legal situation.

Tasks:

  • Extensive adjustments to the data model of registration data for free person search

Results:

  • Data model adapted to legal requirements

Additional services:

  • Coordination with representatives of the federal states

Methods: Scrum, Kanban Tools: MS-Project, Sharepoint

Jan 2021 - Dec 2021
1 year
Germany

Squad Lead / Scrum Master

Techmahindra / Telefonica

The existing disparate systems of Telefonica Germany's subsidiaries and partner companies are to be migrated to a unified platform.

Task:

  • Defining functions based on requirements from business processes together with the product owners
  • Process analysis
  • Setting up the project team
  • Providing the implementing functions

Results:

  • Trained agile project team
  • Various features delivered according to plan

Methods: Scrum, Kanban Tools: MS-Project, Sharepoint, Confluence, Jira

Jan 2020 - Dec 2021
2 years
Germany

Project Manager / C-Level Reporting

Mio42 GmbH

Development of 'Medical Information Objects' for the electronic patient record.

Task:

  • Gathering the requirements for the MIO
  • Delivering the MIO 'handover form in nursing care'

Results:

  • Data model containing information relevant to the different institutions

Further services:

  • Establishing an advisory board
  • Coordination with the relevant associations
  • Aligning processes and data models with the relevant associations

Methods: PMP Tools: MS-Project, Sharepoint, Confluence

Jan 2020 - Dec 2020
1 year
Germany

Consultant

KPMG / Techniker Krankenkasse

Development of possible use scenarios.

Task:

  • Developing possible scenarios for the electronic patient record

Results:

  • Opportunities and limitations of use based on the current conditions of the telematics infrastructure
  • Potential gains through process optimizations
Jan 2014 - Dec 2020
7 years
Netherlands

Interim Program Manager / Risk Manager / C-Level Reporting

Justizministerium der Niederlande

The police radio network of the Netherlands was modernized.

Task:

  • Supporting the management during the tender process and the project

Results:

  • Concepts for project implementation, customer training, operations, and security within the proposal
  • Descriptions of subprojects as part of project setup
  • Formation of project teams for IT security, data migration, service, rollout, and onboarding of subproject managers
  • Program-wide risk management
  • License management system
  • Requirements traceability system

Further services:

  • Preparing the proposal / Handling the functional parts of the tender
  • Presenting the proposal and contract negotiation
  • Contract reviews / support for the contract manager
  • Creating and maintaining the requirements fulfillment matrix
  • Staff selection
  • Interim management of the IT security project
  • Interim management of the data takeover/data migration project
  • Interim management of the service organization in the project
  • Interim management of the rollout and management of contractors
  • Interim leadership of the program management
  • Leading integration tests with the control centers
  • Leading alignment of development results with user organizations
  • Leading the migration project of the business support process tools

Methods: Prince2, ISO207001, ITIL Tools: MS-Project, Sharepoint, Jira

Jan 2014 - Dec 2015
2 years
Germany

Consultant

T-Systems

Concept design for an end-to-end encrypted mail system including qualified electronic signature (QES).

Task:

  • Implementing a secure mail system for service providers within the telematics infrastructure

Results:

  • Gathering requirements
  • Detailed concept
  • Completed contracts for software development
  • Test concept for electronic signature
  • Project documentation. The implementation was handed over to the line organization.

Methods: PMP Tools: MS-Project, Sharepoint

Jan 2014 - Dec 2014
1 year
Germany

Consultant

Senvion

Transition of the telecommunication system to an IP-based system.

Tasks:

  • Capturing the business and legal requirements
  • Preparing the tender documents
  • Awarding the contract

Results:

  • Complete tender documents
  • Finalized contracts

Tools: MS-Project

Oct 2011 - Present
14 years
Ostenfeld, Germany

Owner / Managing Director

Anseres GmbH

Management consultant in project and risk management, specialist in interdisciplinary projects, reorganizations, and migration projects in the healthcare, IT and telecommunications environment.

Jan 2010 - Dec 2013
4 years
Germany

Project Manager / Board Reporting

gematik

The project involves building a nationwide infrastructure to connect all medical facilities that bill services with the statutory health insurance funds. The focus of this project is on developing a software platform with the highest security requirements on which the various applications will be based.

Tasks:

  • Tendering the setup of the telematics infrastructure
  • Coordinating the five projects
  • Providing the second generation of the electronic health card

Results:

  • Complete specification of the telematics infrastructure
  • Specification of the electronic health card 2
  • Operational processes for running the telematics infrastructure
  • Processes for the transition to live operations
  • Complete tender documents
  • Contracts with consortia for development and build of the telematics infrastructure
  • Contracts with manufacturers for the health card 2

Additional services:

  • Representing the National Association of Statutory Health Insurance Physicians
  • Political committee work as the project's representative
  • Coordinating legal proceedings with the Ministry of Health
  • Coordinating collaboration with BSI, BfDI and state data protection officers
  • Technical coaching of the subproject managers

Methods: BSI basic protection, V-Model X, PMP Tools: MS-Project, Sharepoint, Confluence, Jira

Jan 2008 - Dec 2009
2 years
Germany

Project Manager C-Level

Kassenärztliche Bundesvereinigung

The Associations of Statutory Health Insurance Physicians (KVen) and the National Association of Statutory Health Insurance Physicians (KBV) set up a nationwide secure network through which contracted physicians can access the online services of the Associations of Statutory Health Insurance Physicians.

Tasks:

  • Designing a secure communication infrastructure
  • Setting up the network

Results:

  • Contractual framework for the connections
  • Certification procedure for access providers
  • Infrastructure concept
  • Infrastructure handed over for operation

Additional services:

  • Reporting at the board level
  • Conducting the tendering process
  • Certification of access providers

Methods: BSI basic protection Tools: MS-Project

Jan 2008 - Dec 2008
1 year
Germany

Interim Manager C-Level

Rohde & Schwarz PMR

The company's international service department needed to be realigned. Due to partly unclear contracts, the service area was often forced to provide services without invoicing them.

Tasks:

  • Optimizing the manufacturer service

Results:

  • Job descriptions for the service roles
  • Optimized service processes
  • Service catalog
  • Standard service contracts
  • Marketing concept
  • Business plan

Additional services:

  • Interim management / head of service department
  • Reporting to management
  • Conducting an inventory / due diligence and preparing a decision document regarding the future setup (department / profit center / outsourcing)
  • Contract negotiations with existing and new customers
  • Technical and disciplinary management of staff
  • Onboarding of the newly hired service manager

Methods: ITIL

Jul 2003 - Present
22 years 3 months

Self-employed

Taking on interim leadership roles in IT and service management or as a program and project manager for IT transformations with clients. Acting as a management consultant in project and risk management, specializing in interdisciplinary projects, reorganizations, and migration projects in healthcare, IT, and telecommunications settings.

May 2001 - Jun 2003
2 years 2 months

Manager "Network Systems Architecture"

Mobilcom Multimedia GmbH

  • Department management / project management
  • Setting up the department
Nov 2000 - May 2001
7 months

Head of "Service"

Acorus IT Experts GmbH

  • Managing technical staff (approx. 70 employees)
  • Restructuring operations
Mar 1999 - Oct 2000
1 year 8 months
Argentina

Project Manager

Siemens Itron Business Services SA

Project management

Apr 1998 - Feb 1999
11 months

Project Manager / Spokesperson for Project Managers

Siemens AG

  • Project leadership
  • Group leadership
Sep 1997 - Mar 1998
7 months

Consultant

Integrata Unternehmensberatung GmbH

  • Consultant
  • Trainer / Seminar leader
Jul 1995 - Sep 1997
2 years 3 months

Project Manager / Head of User Support Vebacom

LION Gesellschaft für Systementwicklung (later Vebacom Service GmbH, then o.tel.o)

  • Project management
  • Management of user support
May 1992 - Jun 1995
3 years 2 months

Planning Engineer, System Administrator

Keynes Planungsgesellschaft mbH

  • Programming, system and network administration
  • Plant engineering
Feb 1991 - Apr 1992
1 year 3 months
Leverkusen, Germany

Planning Engineer

Bayer AG

  • Plant engineering
  • Programming, database administration
Germany

Consultant

116117 Medical On-Call Service

Provision of a nationwide doctor hotline. Project focus: software development.

Argentina

Project Manager

Argentinian Government (National Identity Documents)

Implementation of electronically readable ID cards / monitoring software / digitization. Project focus: software development.

Germany

Consultant

BDBOS

Product development / operations. Project focus: telecommunications security.

Germany

Consultant

Central Schleswig-Holstein Broadband Association

Supply of broadband fiber optics to the region. Project focus: strategy.

Germany

Consultant

German Armed Forces (Project Hercules)

Modernization of the German Armed Forces' IT. Project focus: operations.

Iran, Islamic Republic of

Consultant

EURO Esfahan

Communication infrastructure for the subway / control center software. Project focus: telecommunications.

Belarus

Project Manager

Eastern Siberian Gas

Communication infrastructure for production areas. Project focus: Telecommunications.

Venezuela

Project Manager

Edelca

Communication infrastructure for hydroelectric power plants. Project focus: Telecommunications.

Argentina

Project Manager (Ministerial Level)

Government of Mendoza Province

Set up government radio communications in Mendoza Province. Project focus: Telecommunications.

Germany

C-Level Project Manager

Klinikum der RWTH Aachen

Infrastructure modernization. Project focus: Infrastructure / Construction.

Russian Federation

Project Manager

Metro Moscow

Modernization and expansion of SCADA system/control center software. Project focus: Service.

Colombia

Project Manager

Metrolinea Bucaramanga

Public transit communication infrastructure. Project focus: Telecommunications.

Spain

Project Manager

Murcia Local Police

Government radio / dispatch center software. Project focus: Telecommunications.

Venezuela

C-Level Project Manager

PDVSA

Communication infrastructure for production sites / dispatch center software. Project focus: Telecommunications.

Oman

Consultant

Petroleum Development Oman (PDO)

System expansion / service implementation. Project focus: Service.

Germany

Project Manager

Poliklinikum Bonn

Infrastructure modernization. Project focus: Infrastructure / Construction.

Romania

Project Manager

SEEBRIG

Set up a mobile communication system. Project focus: Telecommunications.

Russian Federation

Consultant / Project Manager

Stadtwerke Bamberg

Operating and expanding SCADA system / control center software. Project focus: Service.

Summary

With over 30 years in IT, often involving security-relevant communication networks, my experience ranges from leading large IT infrastructure projects to introducing sensitive technologies such as the electronic health card. For over 21 years, I have taken interim responsibility in IT management and service roles at my clients or worked as a program and project manager for their IT transformations.

Languages

German
Native
English
Advanced
Spanish
Advanced
Dutch
Advanced

Education

Lorem ipsum dolor sit amet

Industrial Mechanic · Industrial Engineering

RWTH Aachen

General Mechanical Engineering · Aachen, Germany

University of Applied Sciences Cologne, Gummersbach

Production Engineering · Gummersbach, Germany

Certifications & licenses

BSI basic protection

BSI

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions