DTMT Immersion Cooling

  • I planned and set up the complete production line and supply chain and implemented a full traceability system (data collection) including electronic operator guidance and tool and machine management
Jan 2022 - Dec 2022
1 year
Austria

Consultant

AL-KO Austria

  • I stabilized the entire production planning and reduced lead times by 30%.
  • I restructured the production logistics.
  • Planning and training of the staff
Jan 2022 - Dec 2022
1 year
Austria

Consultant

ESTET Stahlbau

  • Hands-on training and implementation of workshop production vs. serial production.
Jan 2021 - Dec 2021
1 year

Consultant Stanz & Schweißen

Linde & Wiemann

  • I developed practical MES concepts for effective production control.
Jan 2021 - Dec 2021
1 year
Zwickau, Germany

Interim Site Manager Bumper

SILS-Zwickau

  • PV - 150 FTE
  • Phase 1 brownfield, successful restructuring of the site.
  • Set up all departments, optimized processes.
  • Gained the trust of the Audi customer.
  • Achieved product launch on target.
  • Phase 2 remodel of assembly and logistics.
  • Planned new, improved assembly after series launch – throughput 50% more stable and logistics space reduced by 50%.
  • Savings of €2M per annum.
  • The customer thanked us for the successful, on-time implementation – despite holidays.
Jan 2020 - Dec 2020
1 year

Interim Qualitätsmanager Zugangsysteme

U-Shine (Minebea)

  • PV 5 FTE
  • Q-Help 2
  • I reduced the Q-Help status from 3 to 1.
  • I improved customer confidence.
  • I brought 12 IM tools back on track.
  • I successfully reintroduced the PPAP process.
  • I designed and successfully introduced a completely new IM tool.
Jan 2019 - Dec 2019
1 year

Consultant

HAW Lining

  • I increased process efficiency with targeted improvement workshops.
Jan 2019 - Dec 2019
1 year
Schönebeck, Germany

Interim Plant Manager Instrumententafel

Recticel Schönebeck

  • PV 180 FTE
  • Restored customer satisfaction.
  • Successfully negotiated wage classifications with the union.
Jan 2019 - Dec 2019
1 year
Poland

Consultant

SCS Polen

  • I uncovered critical weaknesses and supported the COO/investors in the site decision.
Jan 2018 - Dec 2018
1 year
Hungary

Interim Taskforce-Leiter

SMP Ungarn

  • PV 400 FTE
  • I was responsible for the successful series launch of the Audi Q8 & Q3 in a greenfield plant.
Jan 2018 - Dec 2018
1 year

Interim Taskforce / Logistik

VERITAS / BMW

  • I de-escalated the supply chain and ensured supply to all BMW plants.
  • Built an internal logistics team and implemented sustainable processes.
Jan 2017 - Dec 2017
1 year
Slovakia

Interim General Manager Interior

Grupo Antolin

  • PV 1200 FTE
  • I set up new lines for Porsche and BMW and guided the local workforce safely through the successful ramp-up phase.
Jan 2017 - Dec 2017
1 year
Schierling, Germany

Interim Taskforce Bumper

SMP-Schierling

  • I eliminated major quality issues, reducing Q-Help status from 3 to 0 in the Porsche 9x project with clear action implementation.
  • Regained customer trust and successfully restructured the SILS center.
  • The customer personally thanked me for my outstanding commitment and operational excellence.
Jan 2015 - Dec 2016
2 years
Gothenburg, Sweden

Interim Site Manager

IAC Sweden

  • Ramp-Up Door Panels and IPs
Jan 2015 - Dec 2015
1 year
Eisenach, Germany

Interim Site Manager Bumpers

IAC SILS Eisenach

  • PV 180 FTE
  • Remodeled assemblies, built a quality department.
  • Achieved GM customer satisfaction.
  • De-escalation.
  • Optimized supply chain Spain/Eisenach.
Jan 2014 - Dec 2025
12 years
Biedenkopf, Germany

Interim Head of Operation

Johnson Control Lahnwerke

  • PV 1200 FTE
  • Optimized all operations areas, followed by staff reduction from 1200 to 800, later to 600 FTE.
  • Introduced MES Hydra.
  • I increased OTIF to 99%.
  • Prepared the plant closure plan.
Jan 2012 - Dec 2014
3 years
Mechernich, Germany

Interim Head of Operation

DTMT Mechernich

  • PV 400 FTE
  • Reorganized phase 1 operations and increased OTIF from 50% to over 90%.
  • Optimized ERP and PPS systems.
  • Phase 2 support during ‘plan insolvency’.
  • Played a key role in technical realignment, restructuring concept, implementation including a 25% staff reduction in operations and new department structures.

Business Planning Manager

IAC Group Europe

CI Manager Europe

IAC Group Europe

Head of IE Europe

Lear Corp. Europe

  • Responsible for up to 18 plants in Europe (Lear Corp.)

Senior Buyer CAPEX

Lear Corp. Europe

  • Responsible for up to 18 plants in Europe (Lear Corp.)
Summary

I take responsibility when production lines stand still, supply chains stall, or reorganizations get out of hand. I analyze, structure, and implement – fast, direct, and with measurable results.

As an interim executive, I combine technical know-how with intercultural leadership experience. I bridge cultural and operational differences between Europe and the US – as a doer, translator, and implementer.

I have sharpened my view of integrated system solutions and cross-border management in Europe-wide leadership roles on many successful projects.

Languages
German
Native
English
Advanced
Education
Lorem ipsum dolor sit amet

Bachelor in Process Engineering · Environmental Protection

FH München

Dipl.-Ing. · Mechanical Engineering · Germany

Certifications & licenses

Certified Master Black Belt Six Sigma

Catalyst UK / LEAR Corp.

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions