Recommended expert
Jo Nebe
Sterbfritz Plant Technical Manager
Experience
Oct 2024 - Mar 2025
6 monthsSterbfritz Plant Technical Manager
OPmobility
- Interims Technical Manager during a sick leave replacement.
- Led the development team and took over technical development topics in the plant.
- Conducted successful de-escalation activities for two customers across two sites (mother plant and SILS).
- Trained new team members and performed assessment and development reviews at management and team level.
- Performed capacity and strategy reviews, including production relocation activities.
- Managed internal projects and supported struggling suppliers.
Oct 2023 - Aug 2024
11 monthsManufacturing Project Manager - K1 Porsche, Tayron VW, Tiguan VW
PlasticOmnium Intelligent Exterieur Systems
- Managed manufacturing aspects for K1 Porsche, Tayron VW and Tiguan VW projects.
- For K1, handled a highly complex product and process development with high workload per station, strong flexibility requirements, plant load aspects and a high variety of variants, developing the scope up to customer offer.
- Acted as mentor for a new team member on the Tayron project to ensure manufacturing scope was fully covered according to PO standards.
- Served as lead MPL for the Tiguan project, replacing the former MPL around six months prior SOP to ensure a smooth SOP.
Feb 2023 - Oct 2023
9 monthsManufacturing Project Manager - Audi Q4 in Brusseles
PlasticOmnium Intelligent Exterieur Systems
- Managed a short-run project to double production capacity by transferring an existing line from Zwickau to the Brussels plant.
- Oversaw suppliers under very tight timelines after approval for physical machines was only given in February, with machine transfer completion planned by August.
- Ensured full validation of the complete production line within a very short project duration.
- Managed a distributed project team of about 35 people across six locations.
Aug 2021 - May 2023
1 year 10 monthsManufacturing Project Manager - Audi Q8 in Brusseles
PlasticOmnium Intelligent Exterieur Systems
- Took over the project in a critical phase prior to machine transfer.
- Implemented the complete production system including all equipment for a SILS with long-range delivery up to SOP and serial support.
Jul 2020 - Nov 2020
5 monthsIndustrial Engineer
PlasticOmnium Intelligent Exterieur Systems
- Provided operational support for relocating the entire production into a parallel layout to run two production lines and then into the final production layout for a new product.
- Supported start-up and validation of the new production.
- Implemented RFID solutions on customer request.
Jan 2018 - Jun 2020
2 years 6 monthsManufacturing Project Manager
PlasticOmnium Intelligent Exterieur Systems
- Managed manufacturing project for VW Tiguan 326PA bumpers.
- Planned and built production lines in Germany from sourcing to SOP.
- Developed products for manufacturing (Design for Manufacturing and Assembly) together with the OEM and internal PO team.
- Led international teams for assembly, paint development, packaging, SCM and plant engineering.
- Held responsibility for budget, resources and quality, including PFMEA.
- Coordinated machine development with international suppliers, on-site machine acceptance, transfer, qualification and validation of all shopfloor processes for flawless production.
- Led pre-serial production start-up and MP&L for all deliveries.
- Managed a project volume of about 20,000 hours and 4 million Euro investment.
- Delivered turn-key handover of the production line to the plant at SOP.
Jan 2016 - Dec 2017
2 yearsManufacturing Project Manager
PlasticOmnium Auto Exterieur
- Managed manufacturing project for VW Touareg 516 PA bumpers.
- Planned and built production lines in Bratislava from sourcing to SOP.
- Developed products for manufacturing (Design for Manufacturing and Assembly) with the OEM and PO team.
- Led international teams for assembly, paint development, packaging, SCM and plant engineering.
- Took responsibility for budget, resources and quality, including PFMEA.
- Managed development of machines with international suppliers, including on-site machine acceptance, transfer, qualification and validation of all shopfloor processes.
- Directed pre-serial production start-up and MP&L for all deliveries.
- Managed a project scope of about 18,000 hours and 3.5 million Euro investment.
- Completed turn-key handover of the production line to the plant at SOP.
Oct 2015 - Dec 2015
3 monthsLehre, Germany
Internal Auditor ISO/TS 16949
Delphi
- Developed and implemented the local QM system in the fuel injection systems development center in Flechtorf.
- Prepared and executed PDCA cycles for internal audits.
- Prepared and executed PDCA cycles for external audits.
May 2015 - Sep 2015
5 monthsGifhorn, Germany
Project Manager Development
SMP – Samvardhana Motherson Peguform
- Managed development of VW Aerton 483 CC bumper with focus on feasibility, regulations, quality, tooling and assembly.
- Conducted weekly design reviews with the OEM and SMP project team.
- Held responsibility for Design FMEA.
- Transferred best practices from the plant into the project.
- Led an internal project team of about 20 people (CAD, quality, validation and testing, tooling etc.).
Mar 2014 - May 2015
1 year 3 monthsEssen, Germany
Interims MP&L responsible
Faurecia Auto Exterieur
- Worked as interim MP&L responsible in the JIS plant Bad Friedrichshall and as taskforce member in the Essen plant for bumper production.
- Performed firefighting actions to ensure customer satisfaction (Audi, Mercedes-Benz).
- Reduced escalation levels with customers.
- Implemented and followed up various SCM/MP&L/LEAN tasks to secure material availability.
- Prepared internal and external logistics audits.
Dec 2013 - Feb 2014
3 monthsQuality planning and PDCA project
Metalsa Automotive GmbH
- Managed quality planning and PDCA activities for metal chassis parts.
- Worked with technologies including metal stamping and welding.
- Supported OEM BMW in VDA 6.3 audit preparation and PDCA.
- Developed internal 8D process.
- Performed PDCA-based yield improvement and other preventive actions in production.
Aug 2013 - Oct 2013
3 monthsQuality planning for metal products
Gebr. Kemmerich GmbH
- Performed quality planning for metal stamping products.
- Supported plants in Germany, Spain and Czech Republic.
- Worked on FMEA, CAQ, test plans, gauges and sampling.
- Maintained and served OEM quality systems such as LiOn and BeOn etc.
Jun 2011 - Apr 2013
1 year 11 monthsManufacturing Project Manager
PlasticOmnium Auto Exterieur
- Managed manufacturing projects for multiple products: Porsche Macan bumper, Opel Cascada bumper, Scirocco spoiler and Opel Corsa fender.
- Planned and built production lines in Poland, Germany and Spain from sourcing to SOP.
- Developed products for manufacturing (Design for Manufacturing and Assembly) with the OEM and PO team.
- Led international teams for assembly, paint development, packaging, SCM and plant engineering.
- Held responsibility for budget, resources and quality including PFMEA.
- Coordinated machine development with international suppliers, including machine acceptance on site, transfer, qualification and validation of all shopfloor processes to ensure flawless production.
- Conducted process analyses and containment actions for production stabilisation and optimisation.
- Managed project volumes up to 18,000 hours and about 3.2 million Euro investment per project.
Jan 2010 - Apr 2011
1 year 4 monthsPDCA Leader, Resistors (SMD)
Isabellenhütte Heusler GmbH & Co KG
- Led PDCA activities for SMD resistor production.
- Worked with technologies including galvanic processes, sawing, lamination and cleaning.
- Improved yield and stabilised processes in the mechanical department.
- Developed and improved production technologies.
- Built up additional capacity in the galvanic department.
- Reduced tooling costs by 50%.
- Optimised and audited the clean room.
Jan 2009 - Present
17 years 1 monthWuppertal, Germany
Lorem ipsum dolor sit amet
Industrieberatung Nebe
Oct 2007 - Dec 2008
1 year 3 monthsPC&L Manager
GIRA Giersiepen GmbH
- Led a PC&L team of 13 employees.
- Developed processes for certification of production according to DIN ISO 13485.
- Developed warehouse structures and workflows compliant with GMP for medical production.
- Reduced MOD costs through improved workplace organisation.
- Reduced lead time in the tool shop by 30%.
- Held responsibility for capacity planning and stock levels.
Apr 2002 - Sep 2007
5 years 6 monthsDigital Factory and Lean Manufacturing Europe
Visteon Deutschland GmbH
- Provided LEAN support for plants in Europe, South America and South Africa.
- Managed supply chain management projects for warehouses including reorganisation and closures.
- Conducted LEAN, CCF and DFM/DFA workshops and trainings.
- Implemented value stream mapping in production.
- Defined and optimised production logistics and synchronous material flow, including external logistics chain optimisation.
- Developed optimal production control solutions using simulation tools.
May 2001 - Mar 2002
11 monthsProject Leader Logistics
Ewikon Heißkanalsysteme GmbH & CO KG
- Worked in a tool company with about 200 employees.
- Managed strategic purchasing and supplier development.
- Reorganised internal workflows.
- Led the product launch of the hot runner HPS 3 nozzle.
Apr 2000 - Apr 2001
1 year 1 monthStuttgart, Germany
Project engineer
Fraunhofer TEG
- Performed ratiopotential analysis and implementation for a ship motor manufacturer.
- Planned and implemented a bicycle frame plant.
- Developed clean room equipment for the medical industry.
- Managed a handling project in the flat glass industry for plating.
Jan 1998 - Mar 2000
2 years 3 monthsKassel, Germany
Project lead Software development
Universität Kassel
- Analysed workflows for PPS/ERP systems (similar to SAP).
- Developed and implemented PPS/ERP software in C/C++.
Apr 1997 - Nov 1997
8 monthsProject planning and execution
SUN-TRIEB Planning Office
- Led planning, installation and commissioning of a combined heat and power plant and related contracting in Northern Germany.
- Planned heating, cooling and sanitary systems.
Languages
German
NativeEnglish
AdvancedFrench
ElementaryEducation
Oct 1988 - Jun 1991
Lorem ipsum dolor sit amet
Apprenticeship as Toolmaker, Punching and Forming Technology · Toolmaker, Punching and Forming Technology
University of Kassel
Diploma II in Mechanical Engineering · Mechanical Engineering · Kassel, Germany
University of Kassel
Diploma I in Mechanical Engineering · Mechanical Engineering · Kassel, Germany
Certifications & licenses
Basic Knowledge EN ISO 13485
Design For Manufacturing & Assembly (Dfm/Dfa)
Design For Paint & Packaging
FMEA Training
GMP Basic Course
Internal Auditor EN ISO 13485 (1st, 2nd Party Auditor)
Internal Auditor ISO/TS 16949 (1st, 2nd Party Auditor)
Quality Specialist (TAW-Cert)
Quality Manager (TAW-Cert)
Visteon Lean Academy – Ccf – Creating Continuous Flow
Need a freelancer? Find your match in seconds.
Try FRATCH GPT More actions
Similar Freelancers