Cavit Sarioglu

Renovation of Own Properties

Landshut, Germany
Experience
Jan 2025 - Present
7 months

Renovation of Own Properties

Private construction project (Landshut, Oberhausen, Homberg-Efze)

  • Responsible planning and execution of renovation projects for multiple residential properties
  • Coordination of trades
  • Budget and schedule control
  • Site management and material procurement
  • Quality control
  • Experience in interior finishing, building services, and outdoor facilities
  • Compliance with construction and energy standards
Jan 2024 - Dec 2024
1 year

Sabbatical

Sep 2023 - Dec 2023
4 months
Stutensee, Germany
On-site

Interim Project Manager for System Relocation from Stutensee to Eschbach

Avnet Embedded GmbH

Consulting in project management / interim project manager "System Relocation from Stutensee to Eschbach"

  • Leading and coordinating the project team, planning work packages and schedules
  • Defining project deliverables
  • Monitoring project progress
  • Regular reporting
  • Ensuring adherence to the defined schedule and cost framework of the project
Oct 2022 - Jun 2023
9 months
Aerzen, Germany
On-site

Interim Head of Order Planning / Head of Material Planning (Operational Purchasing)

Aerzener Maschinenfabrik GmbH

  • Temporary vacancy cover
  • Optimization, conversion, and restructuring of processes and IT structure in order planning
  • Synchronization of manufacturing parts with delivery dates
  • Integration and enablement of employees in the change process
  • Improvement of delivery performance
  • Participation in selected projects (e.g. SIOP - Sales & Operations Planning)
  • Tools: SAP, WayRTS
Jan 2022 - Jul 2022
7 months
Lemgo, Germany
Hybrid

Interim Acquisition Lead (Overall AMG-Daimler Rear Seat Project)

ISRINGHAUSEN GMBH & CO. KG

Project: Interim Acquisition Lead for the AMG Rear Seat Project (Daimler) and consulting on "Optimizing Project Management – Overall Project Management" Team composition: Sales, Development, Industrialization, Quality, Production, Controlling, Logistics, Industrial Engineering, IT, Program Management

  • Leading the cross-departmental acquisition project
  • Responsible for cross-departmental project control in terms of schedule, technology, cost, and quality
  • Responsible for delivering the agreed project results at the respective acquisition milestones (ISRI/end customer)
  • Responsible for the holistic coordination of project work across all phases of acquisition
  • Creation of a detailed project plan (aligning ISRI gates with the customer's schedule)
  • Development and coordination of project schedules and budget planning with departments, suppliers, and customers
  • Continuous project monitoring and conducting plan vs. actual analyses
  • Definition, implementation, and monitoring of measures in case of deviations (schedule, technology, cost, quality), coordinating and tracking action plans
  • Regular involvement in revising the project business case
  • Regular project reporting and tracking
  • Regular project meetings with sub-project leaders of the departments
  • Regular project meetings with the client
  • Regular creation of client reports
  • Participation in client meetings as part of the role
  • Conducting, tracking, and implementing change management
May 2021 - Dec 2021
8 months
Pappenheim, Germany
On-site

Interim Head of SAP Material Master

Plastic Omnium Automotive Exteriors GmbH

SAP-technical support: Products AU58x, AU316, AU416, AU513, AU516, BMW i20 Team composition: Material master team, SAP key users from each specialist department, production, CO

  • Rollout of a new process/standard for master data management
  • Consulting: creation of material master data in the logistics and production module
  • Maintenance and creation of master data in SAP
  • Correct creation of bills of materials and routings, developing the systematics
  • Coordination with various departments (injection molding, paint shops, assembly, logistics)
  • Development of training materials and training of employees
  • Work preparation/production planning
Jun 2020 - Nov 2020
6 months
Ochsenhausen, Germany
Hybrid

Interim Project Manager Electronics

Liebherr Hausgeräte GmbH

Projects: Doorlock (automatic door unlocking); automatic door opening, humidity sensor, Biofresh Plus, light module in the door, remote control radio, relay module Team composition per project: systems, hardware, software, integration, components, testing, procurement, quality, mechanical and product management as needed

  • Leadership, control and supervision of the project team: conducting regular project meetings and documenting them in Confluence
  • MS project plans: creation/update of the project plan and coordination within the team
  • Participation in preparation and approval/release of requirements specification/functions specification
  • Participation in component cost calculation
  • Conducting risk management in the project: identifying project risks and defining mitigation measures, deciding on priorities
  • Project budget controlling
  • Creation of project reports for management
  • Internal consulting/support in setting up project management

Results:

  • Creation of MS project plan per project up to SOP
  • Leading the project up to the B-sample phase
Jan 2019 - Dec 2019
1 year
Stutensee, Germany
Hybrid

Interim Project Manager Production Plant Stutensee (Flat Panel Display Solutions)

MSC Technologies GmbH

Selected clients: Nomad, Bosch, Ditest, Actia, Bally Wulff, Bowa, Carl Zeiss, Commend, Deuta, Dialogic, Ski Data, Dräger, Efatec, ELK, Karl Storz, Gorenje, Iskratel, Keba, König und Bauer, Medical Technologies, MS Westfalia, Axio, Rohde und Schwarz, Siemens, Vacuubrand, Trumpf Interim Project Manager FPDS (Flat Panel Display Solutions)

  • Technical and disciplinary management of the Stutensee plant (direct assignment, approx. 20 employees)
  • Task-based, technical management of external plants (all involved employees from program management, quality, production, purchasing, sales, industrial engineering, controlling): approx. 40 employees
  • Project manager for production relocations of flat-panel mechanical products in own plants from Stutensee to Freiburg or to an external partner
  • Coordinating BOM changes and work instructions for the relocation within the team
  • Make-or-buy analysis based on given criteria
  • Handling of last-time production cases
  • Project management and communication tasks within a team
  • Progress reporting and escalation management Results: Relocation of 11 products (10 clients) from Stutensee to Freiburg Relocation of 10 products (5 clients) from Stutensee to Stutensee Relocation of 36 products (12 clients) from Stutensee to external partners Product phase-out: 56 products (35 clients)
Jul 2017 - Dec 2018
1 year 6 months
Würzburg, Germany
Hybrid

Deputy Department Head Data Organization SAP/ Interim Project Manager Work Preparation

Schäfer Oesterle GmbH

Manufacturing of individual components with leather and textile surfaces, up to delivery of complete systems (center console, arm rests, storage compartment, headliner, sun visors, grab handles, interior mirror, door trim, sill trim, rear shelf, luggage compartment cover, seat covers, console, headrests, instrument panel, trim strips, steering wheel rim, steering column, gear lever, handbrake lever, navigation trim) Selected clients: Audi, Bentley, BMW, Daimler, EvoBus, Lamborghini, Porsche, Rolls Royce, Volkswagen, Dräxlmaier, Faurecia, SMP, AIS

Interim: Deputy Department Head Data Organization (3 employees) Coordination of ERP (SAP), IT information systems, standards/consulting for routings/BOMs, standards/consulting for materials management

Interim Project Manager in Work Preparation (approx. 8-15 employees per project and task)

  • Training project managers on creating bills of materials
  • Analyzing processes and creating specialist concepts for SAP
  • Participation in/creation of standards, guidelines and methods; technical input for creating technical BOMs, machine hourly rates, workstations, work instructions, input data for calculating manufacturing costs, creation of training materials
  • Performing calculations via SAP
  • Collaboration with industrial engineering, purchasing, production, sales, controlling, warehouse departments
  • Reviewing and creating BOMs, plan groups/work instructions, production versions in SAP
  • Project-/client-specific analyses: Materials Management MM, Production Planning PP, Sales SD, Controlling CO, Industrial Solutions IS (EDI, Idoc, EMJIT, JITM, EMFOR)

Completed projects Lamborghini LB636 door trim and pillar trim / LB636 seat trims / LB636 backrest cover / CT Porsche grab handle, air outlets, louvers, sill trim / AU536 fascias / Porsche PO992 rollover protection / Bentley BY635 front header and tonneau cover

Special tasks:

  • Inventory support for audits / storage location organization / SAP target concept: optimization of warehouse management
  • Inventory bookings Project management after insolvency/company sale: planning from signing to closing: conversion/restart of Schäfer-Oesterle GmbH to a new legal entity
  • Deputy overall project manager
Apr 2015 - Mar 2017
2 years
Ulm, Germany
Hybrid

Interim Program Manager for BMW project: RAM (Receiver Audio Module)

Harman Becker Automotive Systems GmbH

Project budget: approx. €43 million Project team members directly assigned: approx. 170 Total project participants: approx. 750 Team composition (Team 1): program manager, business unit controller, safety manager, requirements engineer, defect manager, change request manager, resident engineer, project manager for hardware, software and integration, system test, system architect, procurement, industrialization, quality, technical sales manager

  • Leadership, control and supervision of the 'RAM' team: Conducting Team 1 meetings, processing PM Maturity Gate Task Lists (MGTL) and monitoring/controlling the MGTLs and the work products of the I-level project managers/functional owners.
  • Administrator for Procom, Jira/Confluence, project drive: managing user rights internally/externally, identifying/recording/sharing project-related trainings, acting as the central contact point for project participants.
  • MS project plans: creation/update of the RAM master plan, supporting project managers/functional owners in creating/updating individual subproject plans/linkages, high level feature (HLF) planning, acting as central contact point for plan owners.
  • Conducting risk management at Team 1 level: identifying project risks and defining mitigation measures, deciding priorities.
  • RAM project handbook: creation/expansion and ongoing maintenance.
  • RAM budget: creating forecasts for fiscal year (FY16), FY17, supporting FY18: collecting/requesting resources and costs from cost center managers/project leads.
  • RAM budget controlling: in cooperation with controlling: actual vs. target comparisons and clarification of deviations with cost center managers/project leads.
  • Participation/support in the introduction of the 'Safety' process in the RAM project.
  • Participation/creation of top level reports and customer reports.
  • Representing the project to BMW, suppliers and internal interfaces.
  • Onboarding of the new internal Co-PM RAM
May 2008 - Jun 2008
2 months
Offenburg, Germany
Hybrid

Project Manager Production Optimization / Time Studies

Xenterio GmbH

Production optimization

  • \tRecording and analysis of current state: time studies following REFA method, actual standard times, workflows, workstations, work instructions, work plans, comparison of standard times according to work plan / time study
  • \tCreation of target concept and recommendations for the examined products/production processes. Result of optimization: reduction of standard time by about 10%.

Selected products, processes

  • \tSetup: removal, storage, feeder setup, setup at the line (SMD placement machines)
  • \tSingle workstation: setup and teardown of placement table, placing modules, preparing orders, gluing absorbers, pre-tinning, assembly, soldering, SQC inspection, electrical testing, reporting and delivering, printing labels
  • \tMotorola: pre-assembly of antenna, RF board and cover plate, assembly, function tests, ready for shipment
Mar 2008 - Dec 2014
6 years 10 months
Karlsruhe, Germany
Hybrid

Interim Project Manager in Device Development

EIZO GmbH

Projects carried out 8 MP, 56" display including Multi Display Management / graphics card / 10 MP, 30" display / DVI path single link and DVI path dual link / DisplayPort / 47" display kit and 47" display kit variant / 8 MP system for General Electric Healthcare (complete system supplier) / touch PC / 19" variant / cabinet system for Toshiba Medical Systems / Large Monitor Manager LMM56800 and LMM1602 / 8 MP 58"-, 60"-, 46"-, 55" display / 19" high-bright display

Interim Project Manager in Device Development (Technical lead, about 10 people) From development to series launch:

  • \tCreate and maintain feature specifications
  • \tPlan project and manufacturing costs, project milestones and dates, and product quality according to the product lifecycle management process
  • \tLead the interdisciplinary project team to ensure project success from start of development to production release
  • \tConduct design reviews
  • \tCarry out risk management for medical devices (ISO 14971) and create risk management file
  • \tChange management for product modifications during the marketing phase
  • \tSupplier management: create RS, set quality, labeling, dates, initial sample test report, feasibility analysis, production review, series release
  • \tCreate/update standards for documentation and maintenance of project documents: PLM process, procedures, work instructions, type test plan, report, risk management file, basic requirements, templates
  • \tReview and prepare all documents for audits (FDA, TÜV, DEKRA)
  • \tEnsure compliance with legal requirements for medical devices: MPG, FDA 21 CFR 820, MDD 93/42/EEC, ISO 13485, IEC 60601, IEC 62366
Jan 2008 - Feb 2008
2 months
Krems an der Donau, Austria
On-site

Project Manager Production Optimization / Time Studies

Eybl International AG / Eybl Hungary

Upholstery of seat covers, pillars and door panels, armrests, headliner, headrests, bellows, parcel shelves, sun visors, upholstery of leather steering wheels

Production optimization

  • \tRecording and analysis of current state: time studies following REFA method, organization, workflows, line balancing / takt times, workstations, work instructions, work plans, material, product, plant layout, area layout …
  • \tIdentification of optimization potentials in work processes
  • \tCreation of target concept and recommendations for the examined scopes, as well as recommendations for job descriptions, training plans, organization. Introduction/training of central industrial engineering staff in methods for optimization/analysis. Result of optimizations: area reduction of about 35%, standard time reduction of about 15%, and material savings.

Selected products, processes E63 pull handle, E63 door trim, E88 transport bag, Nissan lead console, Comag gluing robot

Aug 2007 - Aug 2007
1 month
Dachau, Germany
Hybrid

Time Studies and Workforce Planning

Autoliv B.V. & Co. KG

  • Conducting time studies following REFA
  • Workforce planning for airbag assembly (Audi TT, Fiat Bravo, Fiat Cinquecento)
Feb 2006 - Sep 2007
1 year 8 months
Landshut, Germany
Hybrid

Interim Manager Technology Control Pre-Development and Interior Evaluations

BMW AG

  • \tManagement of about 25 project managers in training and about 15 project managers Pre-development budget about €5 million.
  • \tPlanning and control of pre-development projects 2007/2008 Support for project managers in project descriptions, capacity, scheduling and budget planning, target field contributions / utility value metric, comparison calculations. Input of projects into the database, summary of all project data for decision-making.
  • \tComparison calculations for in-house vs. external production and evaluations of interior parts (seat, cockpit, door panel, center console, glove box), creation of evaluation matrix
  • \tBenchmarking of interior parts (seat, cockpit, door panel)
  • \tCreation of presentations for committees/project steering group
  • \tSupport services for idea team: idea generation / consolidation / networking / prioritization / evaluation, steering into pre-development
  • \tScenarios / calculation of plant capacity and flexibility
  • \tImplementation of WPS value-driven production system (CIP, Kaizen, 5S) in the office
Feb 2005 - Feb 2005
1 month
Bretten, Germany
Hybrid

Logistics Process Analysis

Beru electronics GmbH

  • Analysis of the logistics processes of two plants
  • Recording the current state and creating target concepts
  • Presenting the results to the board of directors and management
Jan 2003 - Jan 2004
1 year 1 month
Scheuerfeld, Germany
Hybrid

Quality Management Consultant

Faurecia Interior Systems

Project: Consulting and support services in quality management:

  • Creation of an action plan (guide for qualification and validation)
  • Coaching and support of the project from development to series handover
  • Compilation and summary of results after each milestone, as well as presentation to responsible managers
  • Process and test plan for qualification of equipment and processes
  • Test preparation, test coaching, statistical process control (SPC): process capability (cpk) and machine capability studies (cmk)
  • Analysis of results and proposals for actions

Result: Shortened development time, documentation structure based on QM methods, creation of standard template documents (MS Word, PowerPoint, and Excel templates) for current and future projects. Creation of a menu-driven validation manual on CD-ROM

Selected products and processes: Door trim with PU skin casting system, development of product and process.

Sep 2002 - Dec 2005
3 years 4 months
Stuttgart, Germany
Hybrid

Project Manager

Dr. Ing. h.c.F. Porsche AG

Multiple projects in planning, assembly, and engineering

  • Analysis of current workflows of people and machines (incl. control and software analysis) as well as performing time studies and time diagram representations
  • Development of improvement proposals and target concepts (workflow concept for people and machines: changes to machines and reprogramming of machine controls)
  • Support and coaching during the implementation of the target concept
  • Issue logging based on cause principle and statistical evaluations by equipment manufacturer
  • Equipment availability test for final acceptance
  • Creation of requirements specification, scheduling, schedule tracking, and moderation during supplier meetings
  • Development of contingency plans and related process standards, as well as support during implementation
  • Creation / update / modification of work instructions (SAP R3) for assembly: body, chassis, interior assembly, test bench, and finishing
  • Adjustments to plant layouts (AutoCAD)
  • Support in creating maintenance plans for the equipment

Selected products and processes: read station, write station, chassis mating, wheel assembly, blow nozzle, vibrating roller, PCM (Porsche Communication Management), printers and labels for tire pressure signs (RDS) USA, and conversion software

Oct 1996 - Mar 2002
5 years 6 months
Vilsbiburg, Germany
On-site

Head of Organization, Production Methods Planning, and Time Management

Dräxlmaier Systemtechnik GmbH

  • Internal department organization: creating guidelines for data collection and analysis, procedures and work instructions, interface matrix, responsibility matrix, flow and training plans for industrial engineering staff (headquarters / foreign plants), as well as preparing for certifications according to VDA Volume 6.2 and budget planning
  • Project manager for entire process chain and assembly in major projects
  • Planning, introduction, and support of new production technologies
  • Planning, maintenance, and optimization of the machine base at foreign plants
  • Conducting analyses (production, logistics), economic feasibility calculations
  • Packaging guidelines for domestic and international transport
  • Processing and evaluating production-related improvement proposals
  • Creation of work instructions / process standards for production at domestic and foreign plants
  • Estimating times for operations using "comparison and estimation" and MTM methods, conducting time studies according to REFA, creating standard time values, maintaining customer-specific standard time catalog, and training catalog users
Jul 1995 - Sep 1996
1 year 3 months
Vilsbiburg, Germany
On-site

Series Coordinator

Dräxlmaier Systemtechnik GmbH

Series coordinator for domestic and foreign plants (Romania, Poland, Austria, Tunisia, Hungary, Slovakia, Czech Republic)

  • Project manager for introduction of new technologies
  • Conducting time studies and current state assessments
  • Optimizations and workspace design
  • Ensuring required targets for unit numbers, quality, and schedules in new launches
Mar 1995 - Jul 1995
5 months
Recklinghausen, Germany
On-site

Freelance Lecturer

Bildungszentrum des Handels, AWO, BfW des DGB GmbH

Teaching in business administration, economics and social studies, professional math, building physics, metal technology, technical drawing, and electrical engineering

Jan 1994 - Mar 1994
3 months
Bottrop, Germany

Intern

ABR Abfallbeseitigung und Recycling GmbH

  • Market studies in diversification
  • Trading and sales activities in chemical trading
Jan 1992 - Feb 1993
1 year 2 months
Herne, Germany

Part-time Employee

United Parcel Service

Jan 1991 - Feb 1991
2 months
Dortmund, Germany

Intern

Hoesch Stahl AG

  • Work planning, production planning, quality assurance, and sales
Jan 1989 - Jun 1989
6 months
Groß-Gerau, Germany

Temp Job

Fagro GmbH

  • Press and stamping work
Jan 1988 - Feb 1988
2 months
Hamburg, Germany

Intern

Deutsche Lufthansa AG

  • Engine overhaul, toolmaking and support for the operations engineer
Jan 1987 - Jun 1987
6 months
Nauheim, Germany

Intern

Jakob Winter GmbH

  • Machining, maintenance and quality monitoring
Jan 1984 - Jun 1985
1 year 6 months
Groß-Gerau, Germany

Intern

Fagro GmbH

  • Manual and machine material processing
  • Joining technology, heat treatment and model making
  • Measuring and testing in production
Summary

Mr. Sarioglu, a graduate engineer in Mechanical Engineering and Industrial Engineering, has over 15 years of experience in leadership roles, including head of "Organization, Manufacturing Methods Planning, Time Management" and project manager for new technologies. Since 2002, Mr. Sarioglu has been self-employed and has proven his skills with leading automotive manufacturers, suppliers, electronics and medical technology companies, as well as mechanical engineering firms. His portfolio includes the successful completion of numerous projects in both operational and strategic areas, including C-level and top management projects. With his solid technical background, extensive experience, and proven track record, Mr. Sarioglu is the ideal partner for innovative and demanding projects in the automotive, electronics, medical technology, and mechanical engineering sectors.

Core Competencies:

  • PLM
  • Project Management
  • Operations Management
  • Industrial Engineering
  • Logistics
  • Development
  • Production and Quality Management
  • SAP

Project Examples (Interim):

  • Project Management Lead
  • Project Manager
  • Program Manager
  • Project Support/Consulting
  • Operations Management
  • Plant Management
  • Production Management
  • Industrial Engineering
  • Planning
  • Work Study
  • Time Management
  • Production Relocation
  • Series Support
  • Process Optimization
  • Supplier Management
  • Risk Manager
  • Validation
  • Quality Assurance
Languages
German
Native
Turkish
Native
English
Intermediate
Education
Oct 1990 - Jun 1992

Bochum University of Applied Sciences

Diploma in Industrial Engineering · Industrial Engineering · Bochum, Germany

Thesis in Organization: Approaches to Project Planning

Oct 1986 - Jan 1990

Darmstadt University of Applied Sciences

Diploma in Mechanical Engineering · Mechanical Engineering · Darmstadt, Germany

Specialization in Energy and Thermal Engineering Thesis in Fluid Machinery: Calculation and Design of a Two-Stage Compressor

Certifications & licenses

FMEA, WPS (KVP, Kaizen, 5S)

Internal Company Training

MPG, FDA21, CFR820, MDD 93/42/EEC, IEC60601, IEC62366, ISO13485

Internal Company Training

DIN EN ISO 13485

Internal Company Training

ASPICE

AdA Certificate (Trainer Qualification)

DIN EN ISO 13485

DIN EN ISO 9001

ISO26262 Road Vehicles – Functional Safety

MTM-1 (Basic System)

MTM-UAS (Universal Analysis System)

REFA Basic Certificate

REFA Industrial Engineering Training

Risk Management for Medical Devices (DIN EN ISO 14971:2007)

SEP

TS16949

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions