Wolfgang B.

Project Manager

Baesweiler, Germany

Experience

Apr 2025 - Sep 2025
6 months

Project Manager

Inovyn

  • Project management: schedule; forecast; organization chart; kick-off meeting
  • Creating a needs-based structure in SAP
  • Site management and coordination of work
  • Supporting suppliers and operations regarding the project
  • Adjusting process flow diagrams
  • Organizing electrical work and its scope
  • Setting up framework conditions for plant control
  • Optimizing layout planning for implementation
  • Assembly organization and management for dismantling a subsystem
  • Risk assessments
  • Independent and self-responsible handling of contracts, execution, approval up to payment release
  • Organizing safety posts
  • Implementing safety measures with short training sessions
  • Ensuring proper disposal
  • Discussing spare parts proposals
  • Organizing change orders
Sep 2023 - Sep 2025
2 years 1 month

Project Manager

Freelancer

  • Project manager for a project installing a reactor and setting up infrastructure independent of ongoing operations
  • Project management: schedule, forecast, organization chart, kick-off meeting
  • All project-related correspondence in all matters
  • Budget responsibility and changes to a needs-based structure in SAP
  • Creating purchase requisitions, orders, and payment approvals in SAP
  • Preparing request documents and specifications, and checking order confirmations
  • Organizing purchasing with the department and adjusting order texts
  • Site visits with suppliers before tendering and creating reports
  • Collaboration with assembly supervision and reviewing concepts
  • Evaluating offers for the relevant trades
  • Implementing the subproject for unloading the large, heavy reactor
  • Preparing the path for the heavy-duty transporter
  • Tendering and conducting interviews for the site safety coordinator (SiGeKo)
  • Assembly management for steel structure erection, rough assembly, and insulation of the reactor
  • Upgrading the steel structure according to the new ASR directive
  • Creating crane plans
  • Adjustment work due to individual collisions
  • Also organizing and coordinating the work
  • Accompanying civil works for the foundation with the structural engineer
  • Leading the bi-weekly project meetings
  • Reviewing the 3D model and presenting the planning
  • Updating PIDs in the 3D model
  • Participating in HAZOP meetings and adding safety-relevant interlocks
  • Optimizing piping planning with detailed specifications in the project
  • Creating valve and piping lists and adjusting them
  • Creating instrumentation and control data sheets, specifying material-specific data for future process parameters (lower process pressure)
  • Sizing control valves and specifying instrument measurement ranges
  • Checking pump design
  • Technical support for the fire protection concept
  • Planning and implementing weather protection for insulation work
  • Supporting suppliers and operations regarding the project
  • Planning completion of the containment tray for the external pump
  • Organizing approval by the structural engineer
Jan 2023 - Jun 2023
6 months

Project Manager

Hamburg-based chemical company

  • Project manager for 5 projects from development to partial commissioning
  • Replacing oval gear meters with magnetic-inductive flow meters with batch controllers
  • Requirements specification and technical description for linking a continuous plant with a batch melting plant for paraffin blends
  • Tendering and costing of a small-quantity dosing system
  • Loading of separating agents from the production kettle into tank trucks
  • Upgrading a production kettle to a production plant with a special agitator and transfer pump into a buffer tank
Aug 2022 - Dec 2022
5 months

Lead Engineer

plantIng GmbH

  • Lead Engineer for planning projects and technical expertise from plant engineering to aerospace technology
  • Optimizing the production of CFRP tanks for the Ariane 6
  • Feasibility study for vapor recovery during loading and unloading in a refinery
  • Cost estimate for an internal H2 pipeline
  • Reviewing and revising projects towards "Best Practice"
Apr 2010 - Jul 2022
12 years 4 months

Project Manager

Buss-SMS-Canzler GmbH

  • Project manager for plant projects and standalone equipment projects from acquisition to handover to the customer
  • Calculation, specification, inquiry, ordering, and supervision of assembly and commissioning
  • Supervising piping planning
  • Evaporation and rectification for material separation of wastewater for reuse as a skid
  • Concentration of ethanol using membrane technology and rectification in pharmaceutical manufacturing as a skid
  • Multi-stage short-path evaporation for processing wax and similar substances as a skid
  • Evaporation of solvents from catalysts with weighing of residues as a skid
  • Multi-stage short-path evaporation for production of monoglycerides and specific sterols with on-site assembly
Jul 2009 - Mar 2010
9 months

Key Account Manager

WIP Engineering GmbH

  • Acquisition and contract conclusion of engineering projects and employee leasing
Jul 1992 - Jun 2009
17 years

Project Manager

Kirchfeld GmbH transferred to MAN Ferrostaal

  • Project manager in plant engineering for edible oil refining and construction of turnkey biodiesel plants
  • Later head of the Biofuels and fatty acid processing department
  • Calculation, specification, inquiry, ordering and supervision of installation and commissioning
  • Supervision of piping design
  • Creation of a turnkey plant for biodiesel production with complete process building and operating resources assumptions.
  • Creation of a turnkey carrier steam distillation plant with column and deodorization by designing a new so-called triplex cylinder.
Oct 1987 - Jun 1992
4 years 9 months

Project Manager

Walter Rau Verfahrenstechnik

  • Consulting activities in edible oil refining and margarine production, as well as executing plant projects
  • Project management for the delivery of a plant for degumming vegetable crude oil

Summary

I can quickly get up to speed with new programs.

37 years of work experience in plant engineering with client acquisition, proposal preparation, contract negotiation, design and calculation, planning, procurement, assembly supervision, and commissioning.

Successful sales activities in projects and services.

Safety, health, environmental protection (SGU) for managers of contractors

Languages

German
Native

Education

Oct 1982 - Jun 1988

Hamburg University of Applied Sciences, Bergedorf

Process Engineering · Hamburg, Germany

Oct 1977 - Jun 1982

Lohmühlenstraße Grammar School

Berlin, Germany

Oct 1972 - Jun 1977

Belgtens Garten Secondary School

Hamburg, Germany

...and 1 more

Certifications & licenses

Safety, Health, Environmental Protection (SGU) for Managers

Certified Project Specialist

PM-Zert.

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions