Karl-Heinz M.

Managing Director

Oberried, Germany

Experience

Jan 2018 - Present
7 years 10 months
Freiburg im Breisgau, Germany

Managing Director

Mayer Asset Management (MAM)

  • Review of the existing technical organization and processes

  • Optimization and implementation of an efficient engineering organization with defined roles and areas of responsibility

  • Significant reduction of deviations and CAPAs caused by asset failures

  • Plant shutdown planning, scheduling and monitoring of all activities

  • Implementation of asset lifecycle reliability processes

  • Achieving sustainability in asset lifecycle management processes

  • Implementation of early asset management in projects

  • Definition of asset lifecycle documentation

  • Development of basic engineering guidance documents like asset management program and strategy

  • Development of site asset lifecycle management SOPs

  • Implementation of reliability engineering processes

  • Implementation of GxP processes in asset management

  • Development and implementation of spare part management processes

  • Implementation of asset management improvement processes

  • Implementation of condition based maintenance

  • Implementation of CMMS, definition of efficient and compliant usage processes for SAP-PM and Blue Mountain

  • Conduct compliance and efficiency assessments of asset lifecycle management

Jan 2013 - Dec 2018
6 years
Basel, Switzerland

Global Business Owner SAP-PM

Novartis Pharma AG

  • Implementation of SAP-PM business processes (e.g., corrective maintenance, preventive maintenance, planning and scheduling, and calibration) in all pharma manufacturing sites

  • Review and optimization of all maintenance business processes for SAP-PM

  • Development of an SAP-PM best practice guide to harmonize and improve the usage of SAP-PM across Novartis manufacturing sites

  • Leading and guiding the SAP-PM super user community of Novartis Pharma

  • Review all SAP-PM service requests and collaborate with ERP-IT to meet the annual IT budget

  • Standardized usage of SAP-PM across Novartis Pharma production units

  • Standardization of asset lifecycle management KPIs in EAM

  • Maintenance cost transparency in Novartis Pharma production units

  • Reduction of maintenance cost and compliance observations

Jan 2010 - Dec 2018
9 years
Basel, Switzerland

TPM Champion / Principal Asset Maintenance Engineer

Novartis Pharma AG

  • Implementation of TPM and asset lifecycle management (ALCM) in Novartis Pharma across 20 manufacturing sites in Asia, Europe and the USA

  • Definition and execution of 17 work streams to achieve TPM and ALCM requirements

  • Development of basic maintenance processes

  • Development of an ALCM assessment tool according to ISO 55000

  • Execution of ALCM assessments

  • Increase of asset availability and reliability over 20 production sites

  • Significant reduction of breakdowns

  • Significant reduction of maintenance overdue work orders

  • Significant maintenance cost reduction

Jan 2009 - Dec 2010
2 years
Marburg, Germany

Lead Maintenance Engineer

Novartis Vaccines and Diagnostic

  • Development of a maintenance program for the new manufacturing site
  • Defining an equipment (Floc) structure for production and utility equipment
  • Development of a SOP for the asset lifecycle documentation
Jan 2007 - Dec 2008
2 years
Shanghai, China

Project Lead Engineer

Novartis Pharma AG

  • Execution of process equipment design reviews for three new chemical production buildings
  • Leading the project engineers of the CN design engineering contractor (SSEC) to achieve the project URS requirements
  • Release and control of all asset material specifications
  • Auditing OEMs and advising the project purchasing organization to select the right equipment manufacturer
Jan 1996 - Dec 2007
12 years
Stein, Switzerland

Plant Engineer and Senior Plant Engineer, Milling & Blending Center

Novartis Pharma AG

  • Management of site engineering for a production unit (five engineers, two direct reports and three external reports)
  • Responsible for a repair and maintenance budget of approximately 3 MCHF
  • Creation of annual and three-year investment plans and project execution
  • Responsible for project schedules and costs in compliance with internal and external cGMP guidelines
  • Execution of process optimization and changes of production and infrastructure equipment
  • Explanation of site maintenance organization, processes and results in audits by pharmaceutical authorities (e.g., FDA, EMA, Swissmedic) and internal quality organizations
Jan 1992 - Dec 1996
5 years
Basel, Switzerland
On-site

Project Manager

Ciba-Geigy AG

  • Planning and realization of environmental engineering projects within Ciba-Geigy production sites
  • Design and execution of a new wastewater treatment plant for a chemical production site in France (investment cost €10 M)
  • Consultancy for external companies on environmental engineering processes and definition of user requirements
Jan 1988 - Dec 1992
5 years
Basel, Switzerland

Cost Engineer

Ciba-Geigy AG

  • Development and standardization of a cost code structure for all investment projects of central and site engineering in SAP-PS
  • Roll-out of the standardized cost code in central and site engineering
  • Achievement of a standardized cost structure for large investment projects in collaboration with central project engineers
  • Calculation, creation and publishing of engineering key indicators for investment projects within the engineering community
Jan 1987 - Dec 1988
2 years
Lörrach, Germany

Engineer for Production Improvements

Jacobs-Suchard Manufacturing GmbH & Co. KG

  • Support of the startup process of new packaging equipment to achieve expected asset performance (OEE) before handover to production

  • Carrying out weak point analysis on process and packaging assets to improve OEE

  • Reduction of corrective maintenance by improving preventive maintenance

  • Increase of production output (€1 M per year)

  • Reduction of maintenance costs (15%)

Languages

German
Native
English
Advanced
French
Intermediate

Education

Oct 1992 - Jun 1993

University of Applied Sciences St. Gallen

Bachelor in Business Administration, Dipl. Industrial Engineer STV · Applied Economics · Switzerland · 5.0 (good)

Oct 1984 - Jun 1987

University of Applied Sciences Offenburg

Bachelor in Mechanical Engineering · Mechanical Engineering · Germany · 2.2 (good)

Oct 1982 - Jun 1984

Engineering School Freiburg

Certified Engineer · Industrial Engineering · Germany

...and 1 more

Certifications & licenses

Lean Manufacturing: Silver, Innovation, Quality, Productivity (IQP)