Overhaul of train heads (follow-up project, serial damage)
Stabilizing the coating supply chain for train heads
Launch and series support for TIER 1 ladder frame Grenadier I
Client interface for trades for exhaust air purification systems including “BioWäscher”
Setting up and stabilizing a second contract manufacturer in Poland for VITS Technology
Responsibility: €4M budget
Second source for a new plant builder (initial order: dryer line for MDF board production)
Interface between trades and direct contact for the customer
Responsible for a €9M budget
Conceptual design and industrialization of an automated polyurea coating plant
Responsible for a €2.7M budget
Planning and industrialization of an automated polyurea system for coating, among others, multiplex boards (anti-slip coatings)
Brought in 90% of plant documentation for the paint shop after insolvency
Conceptual design and "New Paint Shop"
Responsible for a €4.9M budget
Handover to the plant after commissioning
Conceptual design of an automated cavity preservation system
Responsible for a €8.5M budget
Successfully designed and delivered the system by a Brazilian equipment manufacturer
Current State Assessment
Created an action catalog including supplier recommendations for implementing technical changes to the system
Introduction of EN 1090 factory production control
Bumper production relocation from CZ to DE including tool relocation for injection molding
Support in the ramp-up of NLS and DLL 2
Achieved a 5% increase without changes to the equipment. Suggestions for plant configuration were adopted to reach the target output of 1000 units/day
Set up organizational structure & process workflows
Launch management of Porsche Cayenne bumpers at Tier 1 plant in Slovakia
Supplier management of sealing profiles for German OEM (BMW), supporting and analyzing the manufacturing process: "Hotforming"
KTL grinding failure analysis (Daimler Berlin and Düsseldorf)
Identification of defect occurrence, anomalies and suspected causes | KTL process for Sprinter at the Düsseldorf plant
Project "New painting plant": planning, implementation and full management of the entire project
Budget responsibility of €4.9 million
Support for assembly and commissioning of the N50 dryer line and decor workstations, including light and heavy rework.
Feasibility analysis of liquid coatings in Germany
Successful derivation of liquid coating technology, alignment with the existing product portfolio and identification of the low-hanging fruits in liquid coatings
Feasibility study for coating system change in the topcoat line: water- vs. solvent-based coatings (Daimler Düsseldorf and Berlin)
Planning of a new plant in a former logistics hall with takt and coating lines | Managing AWZ production | Coating operations and leading IE/Application | Involved in product development and management
Equipment planning and procurement | Planning and implementation of production expansion, Pfungstadt plant
Planning support for the 'Google Glass' project in production planning, equipment procurement and series ramp-up for a technical optics plastic injection molding manufacturer
The project was canceled by Google. The sprue removal benchmark system was converted to other parts
Certification in the DIN EN 1090 area
Calculations to determine supplier development costs (LEK) in exterior/interior and engine parts.
Process optimization of printing and molding interior aluminum
Research on alternative paint systems
Re-launch of a product line for enhanced corrosion protection of stainless steels with subsequent silicon dioxide coating, as well as execution of series production ramps
Supported the Managing Director in plant management and re-certification according to TS 16949
Productivity improvements in the Polish plants
Standardization, conceptualization and industrialization (requirement specifications, acceptance protocols, shipping releases for production systems and equipment)