Recommended expert
Bernhard (Kuno) Schleich
Freelancer, Consultant
Experience
Feb 2025 - Present
1 yearFreelancer, Consultant
Freelancer, Consultant
- Managing Director KIBAG Airfield Construction AG: handling damage cases, warranty claims, insurance claims for installed EMAS systems in Switzerland, Germany and Brazil
- Handling tax refund claims in Brazil
- Company GEBANA, Zurich: member of the steering committee for a new factory build in Burkina Faso
- Various consulting related to contracts and construction
Jan 2020 - Jan 2025
5 years 1 monthZürich, Switzerland
Managing Director
KIBAG Airfield Construction AG
- Set up KIBAG Brazil in Brazil for the construction of EMAS runway arrestor systems
- Acquired and supervised the construction of two EMAS systems at Congonhas Airport, São Paulo
- Oversaw the development of a new surface coating for EMAS systems approved by the FAA
- Managed warranty claims in Germany, Switzerland and Brazil; handled an arbitration case in Sweden (dispute amount several million dollars)
- Handled legal cases in Brazil (tax cases, labour cases)
- From 2024: started the liquidation of KIBAG Airfield Construction AG
Jan 2018 - Dec 2020
3 yearsFreelancer, Consultant
Freelancer, Consultant
- Risk analysis for setting up foreign business for KIBAG, Zurich (report for the board)
- Consulting and construction supervision for legal hemp production in Embrach for Herbaretium, Zurich
Jan 2017 - Dec 2018
2 yearsBaar, Switzerland
CEO, Board Member ILF Consulting Engineers International and ILF Nigeria
ILF Consulting Engineers AG, Swiss Holding GmbH
- Regional Director for ILF Group in Africa, Central Asia and Southeast Asia and member of the ILF Group Management Board
- Set up new companies and offices in India, Thailand, Laos, Kyrgyzstan and Ghana
- Realigned the acquisition strategy
- Secured major projects like the Silk Road initiative, Russia-India pipeline and Iran-India pipeline
Jan 2013 - Dec 2016
4 yearsBaar, Switzerland
Managing Director
ILF Consulting Engineers AG
- Led the ILF Baar Group subsidiaries with around CHF 95 million in revenue and 450 employees in Russia, Kazakhstan, Pakistan, the United Arab Emirates, Nigeria and Iraq
- Restructured the Baar Group into a holding company
- Founded and set up new companies and offices in Iraq and Italy
- Led and coached local management teams, cleaned up balance sheets and contracts, and developed strategies
- Negotiated old additional claims (USD 5 million) in Uzbekistan
Jan 2013 - Dec 2013
1 yearSabbatical
Sabbatical
- Three-month break for career reorientation and handling personal matters.
Jan 2003 - Dec 2013
11 yearsBern, Switzerland
Technical Director International
Marti Holding AG
- Structuring and managing the overseas subsidiaries in Iceland, Norway, Slovakia, Ukraine, Spain and India
- Taking over purchase negotiations with banks and sellers for the acquisitions of the IAV construction company in Iceland, the Vahostav construction company and the BRAVUR gravel plant in Slovakia
- Defining the business and acquisition strategy in coordination with the local management
- Optimizing business processes, including leading balance sheet and budget meetings with CEOs and CFOs
- Securing major projects and negotiating contracts such as the road tunnel in Iceland (CHF 50 million), the railway tunnel in Norway (CHF 60 million), and the dismantling of the Kölliken (CHF 120 million) and Bonfol (CHF 50 million) hazardous waste landfills in Switzerland
- Launching and implementing new business areas like a BOT bid for a parking garage in Olten and developing a hotel project and a flight simulator as investor and general contractor in Reykjavik
Jan 1999 - Dec 2003
5 yearsBern, Switzerland
Site Manager, Lötschberg Base Tunnel
MARTI Tunnelbau AG
- Overall manager for building 24 km of rail tunnel on the south side of the Lötschberg with two hard-rock tunnel boring machines (d = 9.80 m), total cost CHF 550 million.
Jan 1989 - Dec 1995
7 yearsZürich, Switzerland
Independent Contractor and Staff Member
ETH Zürich
- Freelance associate at the Institute of Construction Planning and Construction Management (Prof. R. Fechtig)
- Staff member at the Institute of Geotechnics and Soil Mechanics (Prof. Lang), running monthly seminars for 7th and 8th semester students
Jan 1988 - Dec 1999
12 yearsZürich, Switzerland
Lorem ipsum dolor sit amet
Ingenieurunternehmung Emch+Berger AG
- 1993 – 1999: Overall project manager for the underground regional station at Potsdamer Platz and the Lenné-Dreieck tunnel (CHF 660 million); from 1995, client representative for Deutsche Bahn AG, overseeing more than 25 design and survey offices, experts, consultants and contractors
- 1991 – 1994: Head of the special foundation engineering department
- 1988 – 1991: Project manager for various specialist foundation engineering projects
- Diaphragm and piled walls, as well as anchored sheet pile walls
- Pile foundations, underpinning (jet grouting), and dewatering
- Anchored underwater concrete slab and cut-and-cover construction
- Soft ground tunnelling (pipe umbrella and jet grouting)
Jan 1985 - Dec 1988
4 yearsZürich, Switzerland
Assistant at the Institute of Geotechnical Engineering and Soil Mechanics
ETH Zürich
- Numerical simulations of groundwater flow under dams and around excavation sites
- One-year research assignment in Niger with field surveys and experiments to recharge groundwater in wadis
Languages
German
NativeEnglish
AdvancedFrench
ElementaryEducation
Oct 1981 - Jun 1985
Swiss Federal Institute of Technology (ETH), Zurich
Diploma in Civil Engineering · Civil Engineering · Zürich, Switzerland
Need a freelancer? Find your match in seconds.
Try FRATCH GPT More actions
Similar Freelancers
Discover other experts with similar qualifications and experience