Experience
Nov 2022 - Dec 2023
1 year 2 months
- Create specifications
- Obtain quotes
- Evaluate offers
- Conduct on-site inspections for projects
- Instrumentation selection
- Documentation
- Cable lists
- Migrate folder system to database system
Nov 2021 - Feb 2022
4 months
- Loop check
- Filling out GMP-compliant pharma protocols (cold check) for Lonza in Switzerland
- Verify inverter function
- Field simulation
- Check frequency converter wiring
Aug 2021 - Sep 2021
2 months
- Troubleshoot in marshalling cabinet
- Simulate measuring points on site
Oct 2020 - Nov 2020
2 months
- Small projects like pit level monitoring
- Control system cabling with Excel files
- Expanded cable lists
- E&H instrumentation selection
- Cost estimation for project inquiries
Apr 2020 - Aug 2020
5 monthsBitterfeld-Wolfen, Germany
- Loop check
- Field and switch cabinet troubleshooting in paper mill
- Simulation with mA source
- Verify valve function
Apr 2019 - Dec 2019
9 months
- Creation of cable lists, terminal block plans, and loops using Excel
- Configuring the control system using Excel
- Full mapping of the loop path in Excel from the field to the card
- Terminal strip plans, terminal plans, loops
Aug 2018 - Feb 2019
7 months
- Data capture with Excel and preparation of the new data
- The data had to be compiled from individual software applications
Sep 2017 - Feb 2018
6 months
- EA test
- Documentation
- Frequency converter parameterization
- Profibus
- Device parameterization
- Electrical troubleshooting
- Verification of measuring points on site with the InTouch control system
- 2000 measuring points
Apr 2016 - Apr 2016
1 month
- Assembly planning
- Determining quantities for field cabling based on P&ID and a 3D model of the plant
- Quantity determination for air distributors
Oct 2015 - Mar 2016
6 months
- Design of measurement and control systems in the pharmaceutical sector
- Goods receipt inspection
- Ordering and procurement of instrumentation and control technology for large projects
- Documentation according to pharmaceutical standards
Jun 2015 - Aug 2015
3 months
- The plant treats generated ozone.
- Existing program parts were manually rewritten from S5 to S7.
- FUP standards provided externally were used as a template.
Feb 2015 - Mar 2015
2 months
- Visualization with InTouch system for manufacturing plastic fibers
May 2014 - Nov 2014
7 months
- Documentation
- Project planning
- Simulation
- Provision of project data
- Language adaptations
Jun 2013 - Feb 2014
9 months
- Creation of process lists
- Specifications for the P&ID
- Ordering measurement instruments
- EMSR calculation
- Construction supervision
- Commissioning/loop check/troubleshooting
Dec 2011 - Dec 2012
1 year 1 month
- Conversion of low-pressure steam turbine from field panels to the control system
- Creation of process data list
- Specifications for the P&ID
- Safety devices for quick-closing valves
- Setup of screens and operator functions for the control system
- Development of control system
- EMSR calculation
- Construction of new dust removal system
- Basic engineering
- Creation of process data lists
- Specifications for the P&ID
- Selection and definition of measurement instruments
- EMSR calculation
- Construction of new intermediate absorber 1
- EMSR calculation
Feb 2011 - Oct 2011
9 months
- E&I / plant construction / chemical
- On-site control cabinet acceptance
- Supervision of field assembly
- Field instrumentation survey
- Loop check with HART communicator
- Commissioning / troubleshooting
- Specifications, documentation
Sep 2009 - Jan 2010
5 months
- E&I / plant construction / chemical
- Development of subprogram for O2 compressor (1 MW)
- Development of WinCC visualization / programming with S7
- Commissioning and I/O check
May 2009 - Dec 2010
1 year 8 months
- E&I / plant construction / chemical
- Design of gas detection system
- Design of tanker truck loading station for gasoline/diesel
- Commissioning, loop check and troubleshooting of absorber unit for ship loading
- Instrumentation and control engineering / creating circuit diagrams
- Specification, documentation
- Explosion protection
Jan 2008 - Dec 2008
1 year
- Development of PLC programs for dryers (particleboard production)
- Project support during commissioning
- Dry run test at InTouch <-> S7
- Technologies used: S7, InTouch
Jan 2008 - Dec 2008
1 year
- Creation of visualizations
- Commissioning
- PCS: S7 / WinCC flexible
Jan 2007 - Dec 2008
2 years
- Created process visualizations with the Intouch system
- Project support on construction sites
- Dry test between Intouch and S7
- Technologies used: S7, Intouch
- Duration: 3 months
Jan 2007 - Dec 2007
1 year
- Hardware simulation
- Loop test
- HART communication
- Configuration of field devices
- Technologies used: Honeywell
- Duration: 8 weeks
Jan 2007 - Dec 2007
1 year
- Field wiring / electrical installation of instrumentation
- Troubleshooting field wiring / junction boxes
- Commissioning support in shift work
- Duration: 2.5 months
Jan 2006 - Dec 2006
1 year
- Juice pasteurization
- Water sterilization
- Cleaning system for Krones filling line and for own systems
- Sterile tank for intermediate juice buffer
- Programming S7, process visualization Fix, configuration of field devices
- Use of Profibus DP for ET 200 and Ethernet coupling to the filling line
- Customer training
- Duration: 1.5 months
- Technologies used: S7, WinCC
Jan 2006 - Dec 2006
1 year
- Production of beverages and fruit juices
- Juice pasteurization
- Water sterilization
- Cleaning system for Krones filling line and for own systems
- Sterile tank for intermediate juice buffer
- Programming S7, process visualization Fix, configuration of field devices
- Use of Profibus DP for ET 200 and Ethernet coupling to the filling line
- Customer training
- Duration: 3.5 months
- Technologies used: S7, WinCC
Jan 2004 - Dec 2005
2 years
- Commissioning of cleaning system
- Complete field wiring
- Pneumatic wiring for solenoid valves and control valves
- Installation and testing of Profibus coupling
- Configuration of frequency converters Danfoss, load cells, conductivity meters, flow meters
- Sterility test and operational monitoring of the systems
- Average assignment duration: 1.5 months
- Technologies used: PLC S7-400, FIX, Intouch
Jan 1999 - Dec 2002
4 years
- Programming and visualization of plants for monofilament production (plastics)
- The finished product was used for example in fishing lines.
- Configuration of the inverters for the tensioning units of the monofilaments
- Recipes for speed ratio control between the tensioning units
- Current control for Siemens frequency converters
- Temperature control with hardware controllers
- Average assignment duration: 1.5 months
- Technologies used: PLC S7-300/400, Intouch
Jan 1998 - Dec 1999
2 years
- Programming and visualization of plants for remediation of contaminated air/water
- Water and air cleaning with carbon filters, sand filters and thermodynamic processes
- Monitoring of standalone plants using PC Anywhere
- Programming using remote data transmission
- Technologies used: PLC S7-400, Invisu