Norbert Kolschen

Baseline & Performance Manager

Germany

Experience

Feb 2018 - Present
7 years 6 months

Baseline & Performance Manager

Apleona HSG International

  • International rollout of new project assignments
  • Process optimization and standardization
  • Building an end-to-end reporting and control system
  • Identifying and implementing improvements

Key Projects:

  • Major pharmaceutical company, Netherlands
  • Automotive group, Poland
  • Large bank, Germany

Staff responsibility:

  • Direct: 0
  • Indirect: 25

Budget:

  • 1,000 k€
Sep 2011 - Dec 2017
6 years 4 months
Berlin, Germany

Strategic Facilities Manager

Bombardier Transportation

  • A) Corporate headquarters (Berlin): Head of Site Facility Management – about 21,000 m² gross for around 1,100 workplaces at two locations (partly heritage listed)
  • B) Group (around 200 sites worldwide): In-house Facility Consultant – set up and manage regional best-practice teams; introduce electronic auctions/tenders; save costs through optimized purchasing; streamline processes via synergies
  • C) Hennigsdorf site: Head of Plant Engineering from 10/16 to 12/17 – small-town setup (power plant, energy/water supply and disposal) with about 660,000 m² site (85,000 m² gross) for 2,500 technical and administrative workplaces across 63 buildings

Key Projects:

  • A) Outsourcing IT department for approx. 320 workplaces / lean canteen / flexible workspace planning
  • B) Building an EMEA shared service center; 15% average material cost savings via regular Newtron tenders for sites and countries; 10% logistics cost savings through consolidated volumes of neighboring sites; planning a modern paint shop in Poland; expanding a final assembly hall in England
  • C) Organizational restructuring after 50% budget cut; decommissioning multiple production buildings; workplace optimization (consolidation of departments and support functions); integrating about 150 workplaces from headquarters

Staff responsibility:

  • A) HQ direct/indirect: 3/35
  • B) Direct/indirect: 0 to 85
  • C) Direct/indirect: 17/125

Budget:

  • A) HQ: 5,900 k€/year
  • B) Project-specific: 30 k€ to 22,000 k€
  • C) Hennigsdorf: 19,000 k€/year
Nov 2009 - Aug 2011
1 year 10 months
Karlsruhe, Germany

Power Plant Construction Manager (Freelance)

Alstom Power Service

  • Introduce and coordinate (procurement & sourcing) an efficient logistics process chain
  • Adapt engineering bill of materials for assembly- and maintenance-ready part supply
  • Standardize and oversee quality logistics material handling (50 kg to 80 t)
  • Develop assembly-friendly site logistics

Project: Rheinhafen steam power plant Karlsruhe Block 8 (RDK8):

  • Optimize material flow to site (Thailand – Rotterdam – intermediate storage – site)
  • Implement end-to-end barcode tracking (from manufacturer to assembly)
  • Optimize use of standard transport systems (lifting gear, self-loaders, etc.)
  • Cut logistics-related waiting times by 15% (automated assembly feedback via QR code)
  • Significantly reduce shrinkage (exact storage location via QR code GPS)

Staff responsibility:

  • Direct: 0
  • Indirect: 32

Budget:

  • 3,500 k€
Aug 2008 - Mar 2009
8 months

Head of Logistics and Facilities

DMG Spare Parts (Gildemeister)

  • Spin-off of a logistics center from five production plants
  • Build a flexible functional org and market-oriented process org
  • Daily technical and financial inventory and logistics controlling
  • Integrate foreign warehouses in China and the USA

Key Projects:

  • Convert existing building from production to logistics use
  • Plan new semi-automatic high-bay warehouse
  • Introduce continuous inventory with part consolidation across eras
  • Implement automated transport systems and KANBAN
  • Achieve performance targets six months early

Staff responsibility:

  • Direct: 135
  • Indirect: 25

Budget:

  • 1,200 k€
Jul 2007 - Jul 2008
1 year 1 month

Energy Manager

Cinestar Gruppe

  • Energy purchasing for cinemas, hotels, commercial and shopping centers; technical and financial energy controlling; prepare and audit operating cost statements

Key Projects:

  • Reduce average electricity price by about 7% through renegotiations with suppliers
  • Cut individual consumption by up to 35%, total by 2% via staff training
  • Lower fresh heat supply with CO₂ control and POS integration
  • Switch lighting systems to LED technology

Staff responsibility:

  • Direct: 0
  • Indirect: 85

Budget:

  • 4,900 k€
May 1996 - Oct 1998
2 years 6 months
Germany

Managing Director

Wirtschaftsförderkreis Harlingerland e.V.

  • Municipal economic development: partnership of public institutions with local businesses (PPP model)

Key Projects:

  • Support members; start-up and business stabilization consulting; grant acquisition; event and representation management

Staff responsibility:

  • Direct: 4
  • Indirect: 0

Budget:

  • 280 TDM/year
Feb 1993 - Jun 2007
14 years 5 months

Consultant & Interim Manager

Self-employed

  • Engineering consulting for SMEs in controlling, maintenance, logistics, and energy

Key Projects:

  • Start-up “Heat Pump Installation” (2004–2007)
  • Energy cost and process optimization for a furniture factory (2004)
  • Process analysis for spin-off “Spare Parts” for mechanical engineering firm (2003)
  • Specs development and software rollout for a mechanical engineering firm (2001–2003)
  • Start-up and operations management “Electronics and Appliance Recycling” (1998–2001)
  • Strategy for strategic special disposal and event marketing in military conversion (1998)
  • Commercial manager at a craft business (1993–1996)
  • Spin-off of a transport dept into a logistics service provider for a craft company (1994)
  • Strategy consulting including IGeL concept for GPs and internists (1995)

Staff responsibility:

  • Direct: 2
  • Indirect: 0

Budget:

  • 350 TDM/year
Jan 1992 - Jan 1993
1 year 1 month

Junior Consultant

Hartmann & Partner

  • Management consulting for industrial companies; takeover and turnaround of distressed and former state-owned firms from Treuhand

Key Projects:

  • Mahindra (India): manufacturing concept for 7 sites across India
  • Kirloskar (India): transfer motor production from IFA Nordhausen to Pune (tech transfer)
  • Lotze Maschinenbau, Kurzer Ventilators: turnaround concept

Staff responsibility:

  • Direct: 0
  • Indirect: 0

Budget:

  • 1,000 TDM
Dec 1990 - Dec 1992
1 year 1 month

Sales Engineer

Materialinformationszentrum (MIZ GmbH)

  • Acquire orders from industrial clients for technical documentation and maintenance software

Key Projects:

  • Hüffermann commercial vehicles
  • Flender mechanical engineering
  • Voith Ventilators

Staff responsibility:

  • Direct: 0
  • Indirect: 0

Budget:

  • 40 k€
Jul 1990 - Nov 1990
5 months

Planning Engineer

Industrieplanung Fischer

  • Junior planner for industrial factory planning projects, focus on assembly/final assembly

Key Projects:

  • General Motors Europe: build first assembly plant in former Eastern Bloc (Hungary)

Staff responsibility:

  • Direct: 0
  • Indirect: 0

Budget:

  • 0 €

Summary

  • Hands-on / visionary
  • Result-oriented
  • Authentic / resilient
  • Role model mindset
  • Decisive
  • Cooperative / helpful

Languages

German
Native
English
Advanced

Education

Wilhelmshaven University of Applied Sciences

Diploma in Industrial Engineering, focus on Production Management / Ergonomics · Wilhelmshaven, Germany · 2.0