Helgo G.

Migration to HANA BP, MDM-Team, Master-Data-Management

Bergkirchen, Germany

Experience

Jan 2023 - Apr 2025
2 years 4 months

Migration to HANA BP, MDM-Team, Master-Data-Management

  • Market-Segment: packaging industry
  • System-Landscape: SAP ECC to S4-HANA
  • Master-data-management
Aug 2022 - Dec 2022
5 months

Team lead AP Migration

  • Market-Segment: Grocery industry
  • System-Landscape: SAP-Systems/Hexagon etc to S4-HANA
Jun 2021 - Jul 2022
1 year 2 months

Migration to HANA, MDM-Team, Master-Data-Management

  • Market-Segment: Foot industry
  • System-Landscape: Non SAP-Systems DB2/Notes/Specpage etc. (Divers) to S4-HANA
  • Master-data-management
Mar 2020 - Apr 2021
1 year 2 months

Value Flow Team, Process-Designer, Structure management-Migration

  • Market-Segment: Wafer
  • System-Landscape: SAP Systems (Divers)
Jul 2019 - Mar 2020
9 months

Consultant FI/CO; Developer, Interface-Designer /Developer

  • Market-Segment: Retailer
  • System-Landscape: SAP Systems (Divers)
  • System - documentation
Mar 2019 - Jun 2019
4 months

Developer EWM

  • Market-Segment: Steel -Automotive
  • System-Landscape: SAP -HANA (IM->EWM) migration team lead
Jun 2018 - Feb 2019
9 months

Development & Design as Developer

  • Market-Segment: Banking
  • System-Landscape: SAP systems
Feb 2017 - Jun 2018
1 year 5 months

Development & Marketing / Upgrade / Migration

  • Helena new version translation
  • Market-Segment: Security-Basis / Performance / Error locator
  • System-Landscape: SAP systems
Oct 2016 - Feb 2017
5 months

User administration; Mass generation, GRC development, Security audit: Team lead migration preparation

  • Market-Segment: Security-Basis
  • System-Landscape: SAP systems
  • New security roles, change of business areas
Apr 2016 - Oct 2016
7 months

SAP Interface Manager, Manager/Developer for Interface Creation and Change

  • Market-Segment: Telecommunication
  • System-Landscape: SAP systems
  • Upgrade, team lead migration, conversion, system split and change
  • Process optimization, process development and interfacing analyst,
  • IDoc/ALE, enhancements, user exits, BAdI, interfacing
  • Message control flow, workflow, support
  • System migration
Oct 2011 - Feb 2016
4 years 5 months

SAP Manager, IT Manager SAP / Development

  • Market-Segment: Pharmacy
  • System-Landscape: SAP 4.6/ECC 6.0
  • Upgrade, migration, conversion, system split and change
  • Process optimization and development
  • FI, CO, SD, MM, QM and interfacing analyst
  • IDoc/ALE, enhancements, user exits, BAdI, interfacing
  • Message control flow, workflow support
  • 4x SOX (authorization concept and release)
  • New area authorization implementation and controls
Mar 2011 - Aug 2011
6 months

Central Project Leader Logistics and Migration

  • Market-Segment: Rollout project "EPOS.NRW"
  • System-Landscape: SAP ECC 6.0
  • FI, CO, SD, MM and interfacing analyst
  • Authorization concept, support
  • Model creation / test scenarios / documentation
  • Training sessions
Oct 2010 - Feb 2011
5 months

Upgrade to ECC 6.0, Migration, Unicode, Combined Upgrade

  • Market-Segment: Media/Retail
  • System-Landscape: SAP ECC 6.0, Windows XP, Oracle, MS Office
  • Transaction analysis, SQL performance analyses
  • Development with different toolsets
  • System split during upgrade
  • Support
Jul 2010 - Sep 2010
3 months

Upgrade to ECC 6.0, Migration, Unicode, Combined Upgrade, Development, Performance and DB Optimization

  • Market-Segment: Media/Retail
  • System-Landscape: SAP 701, Windows XP, Oracle, MS Office
  • Transaction analysis, SQL performance analyses, ABAP runtime, ABAP debugger, DB access optimization
  • Training / UAT
  • System split during upgrade
  • Support
Apr 2010 - Jun 2010
3 months

Upgrade to ECC 6.0, Team Lead Migration, Unicode, Combined Upgrade, Development, Performance and DB Optimization

  • Market-Segment: Heavy metallurgical industry
  • System-Landscape: SAP 701, Windows 7, MAXDB, MS Office
  • Transaction analysis, SQL performance analyses, ABAP runtime, ABAP debugger, DB access optimization
  • System split during upgrade
Aug 2009 - Mar 2010
8 months

Development of “Helena” a Performance & Migration Optimizer

HGD-Evolution

  • “Helena”-development
  • Market-Segment: IT-consulting
  • System-Landscape: SAP 4.7, Windows XP, MacOS X, Oracle 10.2.0.2.0, MS Office
  • Authority controls
Mar 2009 - Aug 2009
6 months

Upgrade to ECC 6.0, Migration-Team member, Unicode, Combined Upgrade, Development, Performance and DB-Optimization

  • Market-Segment: security technology manufacturer
  • System-Landscape: SAP 4.6b, Windows XP, Oracle 10.2, MS Office
  • Transaction analysis, SQL performance analyses, ABAP runtime, ABAP debugger, optimizing DB access
Nov 2008 - Feb 2009
4 months

Support and Development for complex Batch input

Pharma

  • Market-Segment: pharmaceutical manufacturer
  • System-Landscape: SAP 4.6c, Windows XP, Oracle 10.2.0.2.0, MS Office
  • Performance and validation CO-PA/PSP and orders
Oct 2008 - Nov 2008
2 months

Support Consultant Performance Optimizing

  • Market-Segment: industrial manufacturer
  • System-Landscape: SAP ECC 6.0, Windows XP, Oracle 10.2.0.2.0, MS Office
  • Upgrade, unicode release, performance
  • Optimal inserts of internal tables, reorganization and definition of SAP system analyses – overview
  • Transaction analysis, SQL performance analyses, ABAP runtime, ABAP debugger, optimizing DB access, BlueJ
Jul 2008 - Jul 2008
1 month

Support Consultant Performance Optimizing

  • Market-Segment: Bank
  • System-Landscape: SAP R/3 rel. ECC-changes, Windows XP, Oracle, MS Office, Lotus Notes, JAVA
  • Upgrade, unicode release, performance, partner change, combined upgrade
Jun 2008 - Oct 2008
5 months

Support Consultant Development

  • Market segment: Banking
  • System landscape: SAP R/3 rel. 4.6-6.0 ECC upgrade, Windows XP, Oracle, MS Office, Lotus Notes
  • Upgrade, Unicode release, performance, partner change
  • Technical combined upgrade
Jun 2008 - Jun 2008
1 month

Support Consultant Performance Optimizing

  • Market segment: Manufacturing industry
  • System landscape: SAP R/3 rel. 4.6-6.0 ECC changes, Windows XP, Oracle, MS Office, Lotus Notes
  • Optimal inserts of internal tables, reorganization and definition of SAP system analyses - overview
  • Transaction analysis, SQL performance analyses, ABAP runtime, ABAP debugger, optimization of DB access, BlueJ
  • Upgrade, Unicode release, performance
Mar 2008 - Jan 2009
11 months
Berlin, Germany

Consulting/Development SAP-Manager, Support Consultant Fi /Fi-AA

Sony

  • Market segment: Trading
  • System landscape: SAP R/3 rel. 4.7, Windows XP, Oracle, MS Office, Lotus Notes
  • User authorization handling and development
Mar 2008 - Apr 2008
2 months

Business Team Lead FI/CO

  • Troubleshooting
  • Market segment: Trading
  • System landscape: SAP R/3 rel. 4.7, Windows XP, DB2, DB6, MS Office, Lotus Notes
  • Go-live check
Oct 2007 - Oct 2007
1 month

Business Team Lead Performance Optimizing

  • System optimization
  • Market segment: Cross over / IS-H
  • System landscape: SAP R/3 rel. 4.7, ECC 6.0, Windows XP, DB2, DB6, MS Office, Lotus Notes
  • Database performance
  • Individual object analysis: transaction step analysis, SQL performance analysis, ABAP runtime analysis, ABAP debugger, optimizing database accesses
  • Unsuitable access paths: introduction to database indexes; creating, changing and deleting database indexes; DB views or ABAP joins and database indexes; open SQL statements and database indexes
  • Suitable access paths: accessing individual tables, accessing multiple tables, accessing pool and cluster tables, SAP table buffering
  • Optimized use of internal tables: design and definition of internal tables, efficient structure, efficient access, applications
  • SAP system analysis - overview
  • SAP workload analysis (transaction profiles), Java
Sep 2007 - Oct 2007
2 months

Business Team Lead ABAP / DB Optimizing

  • System optimization
  • Market-Segment: Crossover / Pharma
  • System-Landscape: SAP R/3 rel. 4.6c, ECC 6.0, Windows XP, DB2, DB6, MS Office, Lotus Notes
  • Individual object analysis: transaction step analysis, SQL performance analysis, ABAP runtime analysis, ABAP Debugger, optimizing database accesses, LO-SRS (retail)
  • Unsuitable access path: introduction to database indexes; create, change and delete database indexes; DB views or ABAP joins and database indexes; open SQL statements and database indexes
  • Suitable access paths: accessing individual tables, accessing multiple tables, accessing pool and cluster tables, SAP table buffering
  • Optimized use of internal tables: design and definition of internal tables, efficient structure, efficient access, applications
  • SAP system analysis - overview
  • SAP workload analysis (transaction profiles), Java
Oct 2006 - Mar 2008
1 year 6 months

Consultant/Developer First & Second Level Support ASC, Manager/Developer for Interface Creation and Change

  • Migration sub-team
  • Market-Segment: FI/CO ExARa
  • System-Landscape: SAP R/3 rel. 6.2, Windows 2003 and XP, Oracle 10i, MS Office, Footprints, Citrix, VPN
  • Combined upgrade
  • Individual object analysis: transaction step analysis, SQL performance analysis, ABAP runtime analysis, ABAP Debugger, optimizing database accesses, LO-SRS (retail)
  • Unsuitable access path: introduction to database indexes; create, change and delete database indexes; DB views or ABAP joins and database indexes; open SQL statements and database indexes
  • Suitable access paths: accessing individual tables, accessing multiple tables, accessing pool and cluster tables, SAP table buffering
  • Optimized use of internal tables: design and definition of internal tables, efficient structure, efficient access, applications
  • SAP system analysis - overview
  • SAP workload analysis (transaction profiles)
  • Java
  • System migration
Sep 2006 - Oct 2006
2 months

Interim manager (Consultant/Developer)

  • Sarbanes-Oxley-Act Audit (SOX)
  • All stages of authority checks (audit)
  • Market-Segment: BC-Security; Business Audit
  • System-Landscape: SAP R/3 rel. 4.7, Windows 2000 and XP, Oracle 10i, MS Office, audit tools, BlueJ
  • Check focus: audit reorganization of business flow
Jun 2006 - Aug 2006
3 months

Interim manager (Consultant/Developer)

  • Sarbanes-Oxley-Act Audit (SOX)
  • Market-Segment: BC-Security; Business Audit
  • System-Landscape: SAP R/3 rel. 3.1i, Windows 2000 and XP, Oracle 9i, MS Office
  • Check focus: audit reorganization of business flow
May 2006 - Jul 2006
3 months

Supporter (Consultant/Developer), Manager/Developer for Interface Creation and Change

  • First & second level support for IS-U
  • Regulatory authority change / regulatory authority implementation
  • Market-Segment: CO,SD,FI,MM, IS-U
  • System-Landscape: SAP R/3 rel. 4.7 – 6.2, Windows 2000 and XP, Oracle 9i, MS Office
  • Combined upgrade
  • Troubleshooting, customizing, reorganization of processes, rollout FI, FI-AA, CO complete replacement, ABAP/4
  • Architecture of new flows and systems
  • System migration
Feb 2006 - Apr 2006
3 months
Munich, Germany

Optimizing and Rollout ITS, LO-SRS (Retail)

Munich Reinsurance

  • ITS introduction, architecture of a new web interface
  • WebDynpro
  • Market segment: WAS 6.2, MM
  • System landscape: SAP R/3 rel. 4.7 – 6.2, Windows 2000 and XP, Oracle 9i, MS Office, internal DB
  • Milestone organization, runtime environment, publishing
Jun 2005 - Jun 2008
3 years 1 month

Optimizing System landscape

  • Migration sub-team
  • Market segment: WAS 6.2, BW, BEx
  • System landscape: SAP R/3 rel. 4.7 – 6.2 and CRM, Windows 2000 and XP, Oracle 9i, MS Office, internal DB
  • Milestones organization, runtime environment, process controlling; knowledge transfer
  • Team-size: 10 members
  • Individual object analysis: transaction step analysis, SQL performance analysis, ABAP runtime analysis, ABAP Debugger, optimizing database accesses
  • Unsuitable access paths: introduction to database indexes; creating, modifying and deleting database indexes; DB views or ABAP joins and database indexes; open SQL statements and database indexes
  • Suitable access paths: accessing individual tables, accessing multiple tables, accessing pool and cluster tables, SAP table buffering
  • Optimized use of internal tables: design and definition of internal tables, efficient structure, efficient access, applications
  • SAP system analysis - overview
  • SAP workload analysis (transaction profiles)
Mar 2005 - Jun 2005
4 months
Frankfurt, Germany

Project Manager ABAP & Security, Project Manager Conversion

Deutsche Bank

  • Market segment: WAS 6.2, BW, BEx, web inbound, WebDynpro
  • System landscape: SAP R/3 rel. 4.7 – 6.2 and CRM, ITS, workflow, Windows 2000 and XP, Oracle 9i, MS Office, internal DB
  • Milestones organization, runtime environment, process controlling;
  • Knowledge transfer, classroom sessions
  • Team-size: 30 members
Mar 2005 - Mar 2005
1 month
Frankfurt, Germany

Project Manager

Avaya

  • Telephone provider
  • Migration
  • Market segment: FI; CO; BC; migration
  • System landscape: SAP R/3 rel. 4.7 and CRM, Windows 2000 and XP, Oracle 9i, MS Office, internal DB
  • Milestones organization, runtime environment, process controlling, stopping an unsuccessful project (milestones out of scope)
  • Team-size: 20 members
Nov 2004 - Feb 2005
4 months

(Parttimejob) Developer for IBM

Ford/Landrover

  • Developing interfaces and reports
  • Market segment: FI; CO; SD; MM; BC
  • System landscape: SAP R/3 rel. 4.7 and CRM, Windows 2000 and XP, Oracle 9i, MS Office, internal DB
  • Developing interfaces and data changes, customizing
  • First- and second level support
  • ABAP/4
Jun 2004 - Nov 2004
6 months

WW SAP-Analyst, Project leader/ Developer, Manager/Developer for Interface Creation and Change

SCM Microsystems

  • Market segment: FI; CO; SD; MM; BC
  • System landscape: SAP R/3 rel. 4.0b, Windows 2000 and XP, Oracle 7-9i, MS Office, internal DB
  • Development of interfaces and data changes, customizing
  • SAP environment architecture
  • Preparation for SOX audit
  • First and second level support
  • ABAP/4, LO-SRS (retail)
  • System migration
  • Team size: 10 members
Mar 2004 - May 2004
3 months
Germany

Project leader

Steel industry

  • Migration of 3 plants in one organization
  • Market segment: FI; CO; MM; BC
  • System landscape: SAP R/3 rel. 4.6 and 4./, Windows 2000, Oracle 9i, MS Office
  • Development of interfaces and data changes
  • ABAP/4
  • Team size: 5 members
Nov 2003 - Feb 2004
4 months

Developer/Part management

Siemens

  • ALE interface between 3 different systems
  • Market segment: MM; BC
  • System landscape: SAP R/3 rel. 4.6 and 4.6, Windows 2000, Oracle 8i, MS Office
  • Development of interfaces and data changes
  • Blueprint and solution architecture
  • ABAP/4
  • Team size: 20 members
Sep 2003 - Nov 2003
3 months

Development Interfaces and Data Change

Thyssen-Krupp

  • Data movement between 2 different SAP systems
  • Migration and conversion
  • Market segment: FI-AA-AM-CO-MM
  • System landscape: SAP R/3 rel. 4.0 B and 4.70, Windows 2000, Oracle 8i, MS Office
  • Problem analysis, conversion, analysis, concept, specification, modifications, change settlement, LO-SRS (retail)
Dec 2002 - Apr 2003
5 months

Consulting SD/MM/CO IS-U and development ABAP/4

NetCologne (Subsidiary of GEW Rhein Enerie AG)

  • Improvement of SAP R/3 SD/MM/CO/FI/WF support
  • Upgrade from 4.0B to 4.70 (6.20)
  • Market segment: Telecommunication for IBM
  • System landscape: SAP R/3 rel. 4.0B and 4.70, Sun Solaris, Windows 2000, Oracle 8i, MS Office
  • Coordination and execution of technical and functional upgrade to 4.70, GUI XT
  • Project goal: Improvement of CO postings from SD and MM. Go-live of 4.70 including process improvements based on the new release.
  • Problem analysis IS-U (first step/blueprint)
  • Stock exchange
  • Conversion, Budget Control System (BCS)
  • Strategic Enterprise Management (SEM), troubleshooting in SAP workflow, creation of various workflows, add-on customizing for SD/MM/CO, development of SD user exits
  • Development of SD/MM/CO BTCI, reporting
  • Data clearing for FI and CO
  • Bug fixing, rollback modifications, technical and functional upgrade concept, alignment of modifications, upgrade and delta customizing for SD, MM, FI, CO, go-live check, go-live support and sign-off
  • Team size: 6 members
Oct 2002 - Oct 2002
1 month

Project management Support, Developer ABAP/4

LSG (Lufthansa Service Group) Sky Chiefs

  • Market-Segment: Airline services
  • System-Landscape: SAP R/3 rel. 4.6 C, HP UNIX, Windows 2000, Oracle 8i, MS Office, SAP R/3 4.0B-4.7
  • Project-Goal: Change of migration, substitution, validation of data extracts, migration of accounting areas, change management; ALE
  • Team-size: 2 developer
Oct 2001 - Dec 2002
1 year 3 months

Project management Support, Team-Lead ABAP/4, SAP -Script, Consulting Support SD-Customizing and Development ABAP/4,

T-Systems Nova (Subsidiary T-Systems International)

  • Market-Segment: Telecommunication
  • System-Landscape: SAP R/3 rel. 4.6 C, HP UNIX, Windows 2000, Oracle 8i, MS Office, GUI XT
  • Project-Goal: Implementation of a central R/3 with interfaces to subsidiary systems, pilot project Central R/3, T-Systems International.
  • Project-Goal: Implementation of client specific solutions within SAP R/3 modules MM and SD for “Deutsche Telekom Mediabroadcast”.
  • Project management support
  • Team-lead SAP script and ABAP/4
  • Consulting support and architecture
  • Reporting concept SD, MM, MM-PUR; ALE, FI
  • Completion of SD, MM and MM-PUR procedures to secure completeness of reports and statistics
  • Analysis, bank business analyser. Concept, specification of modifications of banking-interfaces
  • Development ABAP/4 SD and VIS
  • Project management reporting SD (VIS)
  • Consulting support for conversion of SAP Mobile Sales Data
  • Customizing SD (master data, procedures)
  • Customizing MM (master data)
  • Customizing MM-PUR (procedures)
  • Analysis, conception, specification of modifications
  • Development ABAP/4 in SD and EIS/VIS, MM
  • Creating of different workflows
  • mysap.com workplace design sales
  • Implementation SD and VIS
  • Creation of a new SD specification
  • Developed new Dynpro-functionality
  • Analysis and presentations of SM for add-on functions
  • New pricing-module and price finding
  • Realization of automatic product-management
  • Life-cycle-management of material master
  • Interface for 45-subsystems
  • Exchange infrastructure
  • Automatic communication interface
  • Solution-management and solution-architecture
  • Creation and customization own adaptive editor
  • Feed forward control of different systems
  • ABAP/4
  • Sign-off
  • Authorization concept and realization
  • Individual object analysis: transaction step analysis, SQL performance analysis, ABAP runtime analysis, ABAP Debugger, optimizing database accesses
  • Unsuitable access path: introduction to database indexes; create, change and delete database indexes; DB views or ABAP joins and database indexes; open SQL statements and database indexes
  • Suitable access paths: accessing individual tables, accessing multiple tables, accessing pool and cluster tables, SAP table buffering
  • Optimized use of internal tables: design and definition of internal tables, efficient structure, efficient access, applications
  • SAP system analysis - overview
  • SAP workload analysis (transaction profiles)
  • Team-size: 15 members
Jan 2001 - Jan 2002
1 year 1 month
Neuss, Germany

Consultant, Customizing FI, SD,CO, MM and SM, ABAP/4 Developer

Xerox

  • Client specific solutions in ABAP/4 modules MM/SD IS-U
  • Implementation of client specific solutions within SAP R/3 modules MM and SD and Cognos / Impromptu for ITS
  • Market segment: Software, printing
  • System-Landscape: SAP R/3 rel. 4.6 b, HP UNIX, WinNT 4.0, Oracle 8, MS Office
  • Work planning
  • System and solution architecture
  • Security architecture, user authorization
  • Interface design IS-U and BW
  • Web interface, Web Dynpro
  • Analysis, conception, specification
  • Development ABAP/4
  • Customizing FI, CO
  • Analysis and completion FI customizing for SDW
  • Analysis and completion MM customizing for SDW
  • Analysis and completion MM-PUR-customizing
  • Data-load for SDW (Sales-Data-Warehouse)
  • Tests
  • Implementation
  • Sign-off
  • Analysis of SDW for possible add-on functions
  • Creation of glossary’s
  • Rule based interface
  • Internet and intranet business-TV
  • Connect to IS-U for counter read
  • Team-size: 3-5 members
Dec 2000 - Feb 2001
3 months

Development and customization of reports, SAP scripts, Dynpro’s for CO Order by IBM

Schubert AG

  • SAP R/3 (customizing and development CO)
  • Market segment: Chemical- and healing-industry
  • System landscape: Sun Solaris, HP Unix, WinNT 4.0, Oracle 7, ABAP/4 Workbench, LIS, MS Office
  • Project goal: Optimization / development CO
  • Development
  • Data migrations
  • Customizing
  • MM: analysis, improvement, completion
  • CO: master data, procedures, training, support
  • ABAP/4
  • Team size: 1 to 10 members
Feb 2000 - Jan 2001
1 year

Senior Project Manager/Developer

Bertelsmann Media AG

  • License accounting system
  • Market segment: Telecommunication, television, hosting
  • System landscape: HP UNIX, WinNT 4.0, Oracle 8i, MS Office, diff. SAP
  • Project goal: Replacement of SAP R/3 license accounting with a new created one LAS
  • Project preparation, - planning, –staffing and architecture
  • As-is-analysis: financials, asset-management
  • Implementation concept: all modules, German localizations, interfacing
  • Coordination installation
  • Coordination functional team
  • Coordination technical-team
  • Coordination interfacing
  • Coordination data migration
  • Organization signoffs
  • ABAP/4
  • Team size: 3 members
Dec 1999 - Feb 2000
3 months
Nuremberg, Germany

Development and customization of reports, migration tables

Schöller

  • Migration SAP R/2 to SAP R/3 (part-time)
  • Market segment: ICE, transportation
  • System landscape: HP Unix, WinNT 4.0, Oracle 7, ABAP/4 Workbench, LIS, MS Office
  • Project goal: Implementation of SAP R/3 – migration of R/2 to R/3
  • Development of data-control-reports for CO.
  • Development of enhancements at the migrations tool
  • Creation and load of migrations tables
  • Migration of CO-data with DMIG
  • CO customizing
  • Implementations for purchasing and stock management including training and coaching for the development dept.
  • ABAP/4
  • Team size: 20 members
Jan 1999 - Mar 1999
3 months

Oracle-DB-Administrator / Developer

Aventis Behring

  • Reporting project SAP R/3 with KPMG Consulting GmbH
  • Market segment: Pharmacy
  • System landscape: Sun Solaris, WinNT 4.0, FoxPro, Oracle
  • Project goal: Change from FoxPro to a Oracle-database
  • DB-customizing
  • DB-reporting concept (warranty-covered services)
  • Development of reports
  • DB customizing and bespoke development
  • DB support
  • ABAP/4
  • Team size: 20 members
Oct 1998 - Feb 2000
1 year 5 months
Kerpen, Germany

Project Leader/Team Manager ABAP/4 Development

GE CompuNet GmbH

  • Roll-out of all modules
  • Market segment: Software / hardware
  • System landscape: HP Unix, WinNT 4.0, Oracle 8, MS Office, ABAP/4, SAP 3.1i
  • Project goal: Roll-out of all modules and definitions (US-law and DE-law)
  • Project preparation, - planning,–staffing and architecture
  • SD-customizing (analysis and completion)
  • MM-PUR customizing (analysis and completion)
  • Project management
  • Coordination of up to 140 developers
  • Creation of new methods and tools for project management and quality management with Lotus Notes
  • Development ABAP/4
  • Data migration R/2 – R/3 MM-direct-input
  • Coordination of implementation of LIS with customizing, bespoke development and training activities
  • Coordination of implementing new tools for SAP script
  • Coordination of bespoke development in SM
  • SM customizing
  • Adaptation of warranty and contract features
  • Modifications for data transmission to MM, SD and FI
  • Creation of a method and its implementation for quality control and - security of bespoke development
  • Coordination of ITS integration and web-solution, WAS
  • Smart form / Sapscript / Formscape
  • Team size: ca. 160 members (different size)
Oct 1998 - Dec 1999
1 year 3 months
Neuss, Germany

Consulting Logistics/Sales later, Project Management Bespoke-Development ABAP/4, Teacher

Jagenberg

  • Implementation SAP R/3 (accounting, MM, WM, SD, SM)
  • Market segment: Heavy machines (mining)
  • System landscape: IBM AIX, WinNT 4.0, Oracle 7, ABAP/4 Workbench, LIS, MS Office, Lotus Notes
  • Project goal: Replacement of SAP R/2 using a global SAP R/3 reference model and SAP migration tools
  • SD-customizing (analysis and completion)
  • MM-PUR customizing (analysis and completion)
  • Project management
  • Coordination of up to 6 developers
  • IS-U for interfacing to different engines
  • Creation of new methods and tools for project management and quality management with Lotus Notes
  • Development ABAP/4
  • Data migration R/2 – R/3 MM-direct-input
  • Coordination of implementation with customizing, bespoke development and training activities
  • Coordination of implementing new tools for SAP script
  • Coordination of bespoke development in SD
  • SM customizing
  • Adaptation of warranty and contract features
  • Modifications for data transmission to MM, SD and FI
  • Creation of a method and its implementation for quality control and - security of bespoke development
  • Coordination of ITS integration and web-solution
  • ABAP/4
  • Team size: 6 members/ 30 employee
Feb 1998 - Jun 1998
5 months
Wolfsburg, Germany

Functional Consultant for implementation Reporting

VW

  • CRM pilot project Oracle applications with KPMG Consulting GmbH
  • Market segment: Automotive
  • System landscape: Sun Solaris, WinNT 4.0 server, Oracle applications, Oracle 7, MS Office
  • Project goal: Implementation of a sales and marketing pilot for feasibility decisions
  • Analysis and documentation of business processes
  • Creation of data extracts
  • Data migration MM
  • Training
  • Team size: 10 members
Jul 1997 - Oct 1998
1 year 4 months

Team manager

Sony Germany

  • Trouble shooting / first and second level support
  • Market segment: Electronic / computer
  • System landscape: Sun Solaris, WinNT 4.0, Oracle 8, MS Office, SAP 3.1i
  • Project preparation, - planning,–staffing and architecture
  • Project management starting with software selection through to implementation, go-live and after-live-support
  • Modules: GL, AR, AP, AM, FI, CO, MM, SD, TR
  • Team-lead: distribution, interfacing
  • Testing: German localizations, financials period closing, data-migration all modules
  • Handling user access- authorization planning
  • Hyperion interface
  • Phoenix interface
  • Creation of smart form sheets
  • Protocol terms and concepts
  • ABAP/4
  • Team size: ca. 10 members (part-time 40 members)
Jan 1996 - Jan 1997
1 year 1 month

Developer

Krupp Fördertechnik

  • Part-time for 12 months.
  • Implementation SAP R/3 (accounting, MM and SD)
  • Market segment: Plant-construction
  • System-Landscape: HP UX, WinNT 4.0, Oracle 7, ABAP/4 Workbench, LIS, MS Office, SAP
  • Project goal: Replacement of an bespoke developed system by SAP R/3. SD, MM, LIS, PS, PP, PI, SAP script and bespoke-development ABAP/4
  • SD customizing (procedures)
  • MM customizing (procedures)
  • SM add-on customizing (warranty)
  • Implementation LIS
  • Bespoke development in LIS with ABAP/4
  • Modifications in SAP script
  • Training in ABAP/4
  • Team size: ca. 10 members
Jan 1995 - Dec 2000
6 years
Dortmund, Germany

Consultant Business Administrations, SAP R/3

Centra GmbH

Jan 1995 - Dec 2000
6 years
Duisburg, Germany

Scientific Referee for Business Administration, IT and Management

Institute in Duisburg

Jul 1992 - Jun 1997
5 years

Training Manager and Trainer for Business Administration, IT, Business Management and Project Management

Siemens-Nixdorf

  • Part-time engagement for 5 years.
  • Market segment: Training
  • System landscape: Networking/security/presentation-tools
  • Project goal: Delivery of trainings supported by case studies and 'real-life'-projects
  • Preparation, training, exams and coaching
  • Team size: 10-20 members
Jan 1992 - Dec 1993
2 years
Germany

Consulting, Implementations and Trainings

Contractor

Consulting, implementations and trainings as a contractor for small and general business in German area.

Summary

Helgo Göring-Drewes is currently working as a Senior Consultant/Manager and Interim manager for ERP- and CRM-Systems in the position of a contractor.

He supports SAP-Projects by Management, Architecture, Build-and-Rebuild, Review, Audit and Customizing systems also by developing in ABAP/4 or related tools.

And he has profound experience in conducting projects in a position of a manager or developer.

He leads in a managerial position – if desired he can support it as well as an Interim manager or Interface Technical Consultant.

Languages

German
Native
English
Advanced
Russian
Advanced

Education

Lorem ipsum dolor sit amet

Graduated Business Administrator · Business Administration

Lorem ipsum dolor sit amet

Graduated Electronic engineer, HF · Electronic Engineering

Lorem ipsum dolor sit amet

Master of Psychology · Psychology

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions