Senior Consultant, Development Engineer and Design Engineer
FEA Calculation and Design Modification with CREO Simulate
May 2024 - May 2024
1 month
Cost controlling supplier development costs
PolarixPartner
Project management for plausibility check of development costs for mechanical, E/E and validation scopes
Plausibility check of development costs for mechanical and validation scopes
Jan 2024 - Feb 2024
2 months
HV connectors for eBuses
Forschner
Senior consultant, development engineer and designer
Design work on busbars in CATIA
Nov 2023 - Dec 2023
2 months
Cost controlling supplier development costs
PolarixPartner
Project management for plausibility check of development costs for mechanical, E/E and validation scopes
Plausibility check of development costs for mechanical and validation scopes
Jan 2023 - Sep 2023
9 months
Battery development for trucks
FEV
Concept, Design and construction in NX / Teamcenter
BTV for LV and TP
Cooling of the cells/modules
Nov 2022 - Dec 2022
2 months
Battery development for an H2EV
FEV
Concept, design and construction in NX / Teamcenter
BTV
Aug 2022 - Jan 2023
6 months
Inverter for axle drive
Schaeffler
Advice on the constructive concept and layout,
Design and construction of the busbars
Aug 2022 - Dec 2022
5 months
Repair (cell2pack)
FEV
Advice on the constructive concept in terms of dismantling,
Design and construction
Nov 2021 - Jul 2022
9 months
Battery for an electric sports car
FEV
Advice on the constructive concept,
Concept of the HV switching unit
Design and construction of the HV switching unit
Oct 2021 - Nov 2021
2 months
Battery (cell2pack)
FEV
Advice on the design concept,
Concept of the HV switching unit and LV control in NX / Teamcenter
Aug 2021 - Sep 2021
2 months
Thermal propagation
FEV
Advice on increasing safety in the event of battery fires
Jul 2021 - Jul 2021
1 month
Fuel cell
FEV
Advice on the series-ready construction of a fuel cell
Advice on building a fuel cell suitable for series production
CATIA
Jun 2021 - Nov 2021
6 months
Connectors (HV)
KOSTAL
Development / Construction - CATIA
May 2021 - Jul 2021
3 months
BMS/EE compartment 800V / 400V
FEV
Advising the "Thermal Propagation" task force – NX / Smaragd
Jul 2019 - Dec 2019
6 months
steam boiler for a steam jet unit
Renfert
Change construction due to changed sensors
Construction and calculation, documentation - CREO, SWX
May 2019 - Jul 2019
3 months
Dental implants
TRI-Implants
Building a library for TRI® DIGITAL IMPLANT with CREO
Mar 2019 - Mar 2021
2 years 1 month
BMS/EE compartment 800V / 400V
FEV
Lead design, system architect, development / construction – NX / Smaragd
Feb 2019 - Feb 2019
1 month
toy set
Matuschek / Schleich
Senior consultant, development engineer and designer
Advice on injection molding design
Construction work on injection molded parts for the toy set in CREO
Oct 2018 - Jan 2019
4 months
HV-Connectors for Automotive
Forschner
Design modification of different boxes for casting purposes
Support for engineering of casting parts
CAD-Design - 3D and 2D in CATIA V5 and NX
Feb 2018 - Mar 2018
2 months
Intake manifold with integrated intercooler for passenger cars
Handtmann
Concept in the installation space, positioning of the radiator and the throttle flap as well as production-oriented distribution of the individual parts, 3D in CREO
Apr 2017 - Jul 2018
1 year 4 months
steam boiler for a steam jet machine
Renfert
Concept phase - alternative designs for the boiler including cost evaluation
Construction and calculation of the preferred variant - 3D in CREO
Support of prototype production
Serial Design - 3D and 2D in Solid Works
Feb 2017 - Nov 2017
10 months
Frame with vacuum box for passenger cars
intercable
concept, DMU and injection molding construction, 2-part shell, 3D in CREO
Nov 2016 - Jun 2017
8 months
Controlling of supplier costs
AUDI
Project management Reasonability of costs for development for E/E-scopes
Project management and reasonability of costs for development for mechanical scopes
Project management and reasonability of costs for validation with single tests according to OEM-standards
Jul 2016 - Oct 2017
1 year 4 months
various bus bars for passenger cars
intercable
Injection molding design with Cu inserts, 3D in CREO
Jun 2016 - Oct 2016
5 months
various Cylinder head covers with integrated oil mist separator for passenger cars, lorries and marine
ElringKlinger
Design work for injection molded part in CREO and CATIA V5
Mar 2016 - Jul 2016
5 months
Pigtail for an eBike
Continental
Design concept and sealing of grommet, 3D and 2D in CREO
Jan 2016 - Jun 2016
6 months
United Kingdom
V-Clamp for exhaust systems
Norma UK
Prototype- and serial design, drawings for customer and machining, 3D and 2D in CREO
Nov 2015 - Dec 2015
2 months
Housing for a DC/DC-Converter
Helbling
Design-to-Cost: Concept to save manufacturing costs
Design concept suitable for die-casting and assembling, 3D and 2D in CATIA V5
Aug 2015 - Oct 2015
3 months
Intake manifold with integrated Charge-Air-Intercooler
Handtmann
Concept to save manufacturing costs
Design suitable for die-casting and injection-molding, 3D and 2D in CREO
Jan 2015 - Jul 2015
7 months
System consulting Gearbox for eDrive
Siemens
Consulting about concept, dimensioning and packaging, DVP, appraisal of returns
Requirement-Engineering: evaluation of the requirement specification sheet of OEM
Requirement-Engineering: issue of a requirement specification sheet for the gearbox supplier
Oct 2014 - Nov 2014
2 months
Planetary gear units (mechanical engineering)
Schuler
First draft, dimensioning and design of a planetary gearbox
3D and 2D in Pro/ENGINEER and CATIA V5, FEA in CREO Simulate
Aug 2014 - Oct 2014
3 months
Bilge pump for SUV engines
SHW
Packaging and design of the bilge pump integrated into an oil slicer
3D and 2D in Pro/ENGINEER
Jul 2014 - Dec 2014
6 months
ESP for passenger cars
Mando
First draft of hydraulic manifold with variable pump
Comparison of alternatives
3D and 2D in CATIA V5
Apr 2014 - Apr 2014
1 month
Gripper for a microchip
AEGid
First draft, development and drawings for machining of the gripper assembly
3D and 2D in Pro/ENGINEER
Mar 2014 - Sep 2014
7 months
Turbocharger for marine engines
MTU
Various assemblies with turbine, compressor and its housings, shafts, sealing and lubrication, design suitable for casting and machining
3D and 2D in Pro/ENGINEER
Dec 2013 - Feb 2014
3 months
Asynchronous motor for eDrive
Siemens
Design to Cost of details ready to go into prototyping and mass production
Optimization for mass production
Sep 2013 - Dec 2013
4 months
Gearbox for eDrive
Siemens
First draft and patents of a 2 gear rotary gearbox in various variations
Simulation with Matlab/Simulink
Mar 2013 - Aug 2013
6 months
System consulting Gearbox for eDrive
Siemens
Consulting, concepts, pre-dimensioning and packaging of the gearbox
Requirement-Engineering: Draft of the requirement specification sheet for A-Sample
Jan 2013 - Mar 2013
3 months
various Cylinder head covers with integrated oil mist separator and impactor
ElringKlinger
First draft and serial development
3D and 2D in Pro/Engineer and CATIA V5
Nov 2012 - Nov 2012
1 month
Forging tool holder
ElringKlinger
Design and drawing according to OEM-standard
3D and 2D in CATIA V5
Oct 2012 - Nov 2012
2 months
Quick connector for breathing hood
PM Atemschutz
First draft and design suitable for injection molding with all drafts and parting line
3D and 2D in Pro/ENGINEER
Sep 2012 - Oct 2012
2 months
various injection molded parts
Hummel-Formen
Modifications of customer parts to meet the needs of tooling, related to geometry, parting line, drafts, thickness and material accumulations
3D and 2D in Pro/ENGINEER and CATIA V5
Nov 2011 - Jun 2017
5 years 8 months
Controlling of supplier costs
BMW
Project management Reasonability of costs for development for E/E-scopes
Project management and reasonability of costs for development for mechanical scopes
Project management and reasonability of costs for validation with single tests according to OEM-standards
Mar 2010 - Dec 2012
2 years 10 months
Controlling of supplier costs Powertrain
Daimler
Project management mechanical and application scopes
Reasonability of costs for development based on requirement specification sheet and/or quotation for concept, development, design work, mechanical testing, validation, car-application and OBD-scopes
Sep 2007 - Nov 2007
3 months
Development of a differential star for passenger car transmissions
GKN
Design and FEA of components in the differential gearbox
3D in Pro/Engineer, FEM calculation with Pro / Mechanica
May 2005 - Jul 2005
3 months
Components for a vacuum coating system
Aixtron
Senior consultant, development engineer and designer
Design and drawing derivation of components of an OLED coating system
Design in Pro/E
Jan 2005 - Dec 2008
4 years
Development of various EGR coolers
Pierburg
Conceptual design for the realization of the EU5 and EU6 exhaust gas standard for various diesel engines, passenger cars and commercial vehicles
design of the cooling channels, EGR valve and bypass connection
prototype construction, casting raw parts and fixing mechanical machining thermal, mechanical and structural mechanics optimization
standard die cast construction
3D and 2D in Pro/Engineer and CATIA V5
Mar 2003 - Jun 2003
4 months
User training for a foreign project team
FEV
Pro/Engineer training from the basic training course to the (almost complete) model of a cylinder crankcase within the framework of a series of training courses "Motorenbau"
complete training in English
Inside of Pro/E training the design of combustion engines was to explain at the same time as the handling of the CAD-Tool
procedure, design focus of the respective component, tips and tricks
Nov 2002 - Mar 2005
2 years 5 months
Design of a controlled intake manifold for a V8-cylinder Otto engine with gasoline direct injection
Pierburg
Concept: routing of air-flow and cross-sections of the channels , control of the channel-length , CVTS-control
detailing of the 3D-data for mold making
various stages from magnesium sand-casting up to magnesium die-casting
Customer- and machining drawings
Customization for various cars including packaging and modification of variant parts
3D and 2D in Pro/ENGINEER
Jan 2002 - Dec 2008
7 years
development of various intake manifolds and charge air manifolds for passenger cars
Pierburg
Concept development for the supply phase
detailed 3D and 2D in Pro/E and CATIA V5
Jun 1999 - Dec 2008
9 years 7 months
combustion engine development
FEV
Pro/Engineer administration for all VW projects
Development and design work for combustion engines of various end customers,
focus: crankcase, cylinder heads including timing and valve drive, crankshaft drive
Packaging in various projects
3D and 2D in Pro/Engineer
Jun 1998 - May 1999
1 year
Design of the body of a wagon from extruded aluminum extrusion profiles and calculation of the structure
Hoogovens
Pro/ENGINEER-concept as Top-Down-Design , inclusive dependent references for the shells of Pro/Mechanica
Pro/ENGINEER - Administration and user coaching
Detailed design of the railcar superstructure from welded aluminum extrusion profiles
3D in Pro/Engineer, FEA in Pro/Mechanica – complete wagon as shells
Mar 1997 - Dec 2007
10 years 10 months
R&D-services
Vaillant
CAD-coaching Pro/Engineer by side
Design of various gas burners
Design of various design housings for heating controllers,
3D and 2D in Pro/E, FEA in Pro/Mechanica
Jan 1997 - Dec 2000
4 years
CAD consultant and teacher
DENEX
Training program for new Pro/E users,
Basic training
Advanced training
FEM training
Design of various insulations for power plants
BSB
Pro/ENGINEER - administration and network-based system maintenance
Pro/ENGINEER - user training for employed designers
3D representation of the typicals (typical design situations during construction site assembly)
3D modeling as an overview, e.g. of a flue gas desulfurization system
3D modeling of an internally insulated transition area immediately behind the turbine (round to square) under extreme operating conditions with regard to flow velocity, temperature and medium and drawing derivation with all sheet metal developments