Jörg Gruber

IT Interim and Transition Manager

Hamburg, Germany
Experience
Sep 2023 - Present
1 year 11 months

IT Interim and Transition Manager

Arvato Systems GmbH

  • Task force deployment
  • Management support for the transition core team
  • Identify potential CR claims and propose solutions for CR dissent issues
  • Analyze project and contract documentation for deviations
  • Evaluate and quantify deviations
  • Align negotiation strategy with legal and core team regarding deviations
  • Prepare for and participate in dissent negotiations with EWE AG
  • Interim management: lead the CR and demand management team
  • Interim management: act as key account manager for client EWE AG
May 2023 - Jul 2023
3 months

PPM Project/Program Manager

Deutsche Glasfaser Wholesale GmbH

  • Introduce an Excel-based resource management tool to identify resource bottlenecks and over-allocations and visualize resource gaps
  • Verify the existing project management tool
  • Prioritize projects
  • Perform risk and value assessments
  • Map project dependencies
  • Establish PPM governance
  • (Project was split into multiple steps; step 1 implemented the resource management tool)
Apr 2023 - Aug 2023
5 months

Interim and Transition Manager

Elsflether Werft AG

  • Temporarily took on the CFO role during self-administered insolvency (CFO was on sick leave)
  • Member of the interdisciplinary management team
  • Alignment meetings with banks
  • Prepare monthly liquidity planning and other finance planning data
  • Support in preparing financial statements
  • Participate in creditor meetings
  • Report to stakeholders (CEO, CRO, insolvency administrator)
Jan 2023 - Jun 2023
6 months

IT Program and Transition Manager

Veoneer Germany GmbH

  • Transition scope €1.5 billion
  • Coordinate pre-closing phase
  • Project language: English
  • Coordinate IT teams in JNP, RO, US, GER
  • Project manager and single point of contact for Magna International Inc.
  • Ensure IT-relevant topics for day-one readiness
  • Build project organization
  • Set up and manage PMO with stand-up and regular meetings
  • Create transparent reports for stakeholders
  • Implement program and project management
  • Manage resources and resolve ad-hoc resource conflicts
  • Monitor regulatory requirements and align with SMO/IMO/legal
  • Stakeholder management, project controlling, risk management
Jul 2022 - Feb 2023
8 months

IT Program and Transition Manager

Arvato Systems GmbH

  • Transition scope >€0.3 billion
  • Manage the carve-in subproject and eight parallel carve-out subprojects for EWE AG
  • Coordinate EWE AG’s IT service provider BTC IT Services GmbH (outgoing and incoming)
  • Ensure transition planning and governance in projects
  • Ensure meaningful budget control
  • Ensure “in time, in quality, in budget” management criteria
  • Lead project managers; team of 85 project staff
  • Lead project manager jour fixe meetings
  • Set up and manage PMO with stand-up and regular meetings
  • Status reporting to line management and executive board
  • Implement program and project management
  • Monitor regulatory requirements and align with SMO/IMO/legal
  • Stakeholder management, project controlling, risk management, resource management
Oct 2021 - Jul 2022
10 months

Tender and Program Manager, Bid Manager

Arvato Systems GmbH

  • Tender volume >€0.5 billion
  • Build a complex project organization based on four lots
  • Member of a four-person bid team
  • Support preparation of tender documents
  • Support bid submissions: four offers plus final BAFO
  • Support negotiations on the transition contract
  • Build and coordinate project organization (six project managers, 10 subproject managers, 125 project staff)
  • Introduce PPM project portfolio management
  • Ensure transition readiness by initiating workshops
  • Manage and coordinate transition preplanning workstreams
  • Lead jour fixe meetings
  • Status report to line management and executive board
Sep 2021 - Nov 2021
3 months
Großhansdorf, Germany

Project Manager

Lungen Klinik Grosshansdorf

  • Introduce PPM project portfolio management
  • Perform risk and value assessments
  • Prioritize IT projects under the KHZG hospital future law
  • Create IT roadmap for prioritized IT projects and plan implementation
May 2021 - Jul 2022
1 year 3 months
Berlin, Germany

Interim and M&A Manager

VisiTrans (VisiMatch) GmbH

  • Startup in shipping/logistics
  • Process planning and control, investor outreach
  • Ensure interim financing
  • Determine company value and build business case
  • Create teaser and exposé
  • Monitor due diligence
Apr 2021 - Sep 2021
6 months
Aachen, Germany

M&A / IT Program Manager

Next.e.GO Mobile SE

  • Project management and support for carve-out from seller’s perspective
  • ITSM infrastructure services, provider management (GPS, NetAachen, Netgo, Telekom)
  • Identify and capture cost savings
  • Coordinate implementation of MS Teams telephony
  • Coordinate WLAN infrastructure renewal
  • Ensure IT move from campus to plant
  • Oversee IT application subprojects (PSI PENTA, PTC apps, Windchill, eGecko)
  • Support ERP rollout MS Dynamics 365 Business Central including F&O
  • Executive-level status reports to line management and executive board
  • Implement program and project management
  • Stakeholder management, project controlling, risk management, resource management
  • Hybrid project management approach (agile & waterfall)
Aug 2020 - Mar 2021
8 months
Kempen, Germany
Hybrid

Project Manager

Convertec / SEG GmbH

  • Client: financial investor
  • ERP rollout MS Dynamics 365 Business Central including F&O
  • Hybrid approach (Scrum & waterfall)
  • Manage suppliers and service providers
  • Executive-level status reports to line management and executive board
  • Set up and manage PMO
  • Implement program and project management
  • Stakeholder management, project controlling, risk management, resource management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Hybrid project management approach (agile & waterfall)
May 2019 - Sep 2020
1 year 5 months

Interim and M&A & Transition Manager, Bid Manager

Elsflether Werft AG

  • Took on CIO role during self-administered insolvency
  • Coordinate major projects SSS GORCH FOCK, ELBE tender, and WISCHE houseboat
  • Self-administered insolvency
  • Align business needs and IT (solution architect, business analyst) for implementation
  • Member of interdisciplinary management team
  • Coordinate and manage M&A process up to signing and closing as SPOC
  • Create M&A teaser and info package for investors
  • Perform due diligence and build digital data room
  • Develop and implement portfolio management strategy
  • Conduct risk and value management
  • Build project portfolio management to maintain shipyard operations
  • Support ERP tender for MS Dynamics 365 Business Central including F&O
  • Integrate ongoing yard projects into portfolio management
  • Ensure transition and yard operations in post-merger phase
Jan 2019 - Aug 2019
8 months

Program Manager, Overall Project Lead, Bid Manager

thyssenkrupp Steel Europe AG

  • Carve out IT department (focus: IDM/IAM/IGA), digitize IT security
  • Analyze IDM and IAM business processes and IT systems
  • Conduct requirement analysis & IT maturity assessment (IDM/IAM/IGA)
  • Design IT and sourcing strategy and service roadmap (IDM/IAM/IGA) including self-service portal
  • Develop IT concept/roadmap based on sourcing strategy
  • Align business needs and IT (solution architect, business analyst)
  • Coordinate RFI/RFP for managed services (MSPs)
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
Sep 2018 - Feb 2019
6 months

Program Manager, Project Manager, Bid Manager

SWM – Stadtwerke München GmbH

  • Prepare carve out of parts of the IT department
  • Manage selection of an MSP
  • Conduct market, requirement, and analysis
  • Coordinate requirements management for managed service packages
  • Design operating model for data center virtualization
  • Manage EU tender procedure
  • Align business needs and IT (solution architect, business analyst)
  • Support IT sourcing with RFI and RFP
  • Evaluate sourcing scenarios, define sourcing roadmap
  • Identify consolidation potentials
Jul 2018 - Jan 2019
7 months
Hybrid

Interim/Program Manager, Overall Project Lead

KSB SE & Co. KGaA

  • Digitize program and project portfolio management (PPM/PMO) using agile and waterfall (hybrid)
  • Assess relevant KPIs
  • Optimize resource management
  • Evaluate dependencies, project and budget risks
  • Analyze PPM readiness
  • Conduct risk and value assessments
  • Introduce PPM governance, department, and related committees
  • Design and implement PPM tool (SharePoint-based, custom)
  • Design and implement employee allocation tool (SharePoint)
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
Jan 2018 - Dec 2019
2 years
Hamburg, Germany

Member of the Management Board

Aequitas-Affinity GmbH

  • IT management consulting
Jan 2018 - Aug 2018
8 months
Hamburg, Germany

IT Program Manager, Bid Manager

H&R Chemisch-Pharmazeutische Spezialitäten GmbH

  • Optimize digitalization, conduct ERP/IT maturity assessment
  • Support ERP tender MS Dynamics 365 Business Central including F&O
  • Conduct interviews and workshops along COBIT framework
  • Perform market, requirement, and analysis (prepare RFI, RFP)
  • Evaluate sourcing scenarios, identify actions, define measures
  • Create prioritized, evaluated, and agreed action catalog
  • Align business needs and IT (solution architect, business analyst)
  • Design IT infrastructure target picture and project roadmap
  • Analyze IT service portfolio management and identify gaps
  • Implement PPM/PMO (waterfall)
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
May 2017 - Dec 2017
8 months

Project Lead

Dräxlmaier GmbH & Co. KG

  • Prepare ERP implementation, digitize CFO area
  • Value proposition & realization, business process analysis
  • Identify KPIs to aggregate monetary benefits for the business case
  • Evaluate process and system integration
  • Identify process and master data quality improvements
  • Evaluate process harmonization, improve speed and flexibility
Jan 2017 - Present
8 years 7 months
Hamburg, Germany

Owner

Jörg Gruber Consulting

  • M&A / IT management consulting
Jan 2017 - Dec 2018
2 years
Hamburg, Germany

Associate Partner

AdEx Beratungs GmbH & Co. KG

  • IT management consulting
Apr 2016 - Apr 2017
1 year 1 month

Project Lead, Bid Manager

IDUNA Vereinigte Lebensversicherung aG

  • Support IT sourcing with RFI and RFP
  • Reorganize and digitize strategic IT procurement
  • Conduct market, requirement, and analysis (RFI, RFP)
  • Ensure requirement management for VMS tool (consultant selection platform)
  • Align business needs and IT (solution architect, business analyst)
  • Design future IT infrastructure with focus on outsourcing potentials
  • Select suitable VMS service provider (BaaS, SaaS, PaaS)
  • Create business case
May 2015 - Mar 2016
11 months

Program Manager, Bid Manager

Hawesko Holding AG

  • Select and implement ERP solution
  • Introduce future workplace
  • Conduct digitalization assessment and IT maturity check
  • Perform market, requirement, and analysis (RFI, RFP)
  • Evaluate sourcing scenarios
  • Support ERP tender Dynamics/Navision including AX F&O
  • Align business needs and IT (solution architect, business analyst)
  • Design future IT infrastructure with modern cloud focus
  • Evaluate managed services (MSPs) and operating models (SaaS, PaaS)
  • Manage requirement analysis, tender process, and supplier interviews
  • Support IT procurement in RFI and RFP
  • Support procurement in contract negotiations
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
  • Introduce program management
  • Hybrid project management approach (agile & waterfall)
  • Manage service providers
Dec 2014 - Apr 2015
5 months

Coach, Test Coordinator

Ludwig Görtz GmbH

  • ERP implementation of Microsoft Dynamics NAV/AX
  • Facilitate testing workshop for all departments
  • Train on upcoming test phase activities and coach test coordinator
Jan 2013 - Dec 2014
2 years

Program Manager, Project Lead, Bid Manager

Vattenfall Europe AG / Mining & Generation GmbH

  • Implement ERP industry solution to digitize an industrial park
  • Tender for “truck supply control in industrial park” (interdisciplinary)
  • Perform market, requirement, and analysis (RFI, RFP)
  • Ensure program and requirement management with RFI/RFP
  • Analyze processes and identify optimization potentials
  • Analyze KPIs for future IT process control
  • Evaluate IT-supported, barrier-free infrastructure components
  • Align business needs and IT (solution architect, business analyst)
  • Evaluate sourcing scenarios and design future IT infrastructure
  • Support IT procurement with RFI and RFP and create business case
  • Support contract drafting and conduct supplier negotiations
  • Prepare implementation, manage internal and external IT providers
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
Apr 2012 - Dec 2012
9 months

Interim and Project Manager

DekaBank Deutsche Girozentrale

  • Mobile computing IT strategy “Bring Your Own Device” (BYOD)
  • Conduct requirement and analysis (RFI, RFP)
  • Analyze compliance requirements
  • Perform IT audit and potential analysis of current IT assets
  • Create business case
  • Facilitate consensus-oriented meetings with management, departments, and works council
Jul 2011 - Mar 2012
9 months

Project Lead

Giesecke & Devrient GmbH

  • Digitize IT security: study to introduce identity management (IDM) including SSO and self-service portal
  • Evaluate functional requirements, conduct requirement analysis
  • Perform IT infrastructure audit and IDM maturity analysis
  • Develop high-level, vulnerability, and requirement catalog (prepare RFI, RFP)
  • Conduct KPI and SWOT analysis
  • Identify IT risks
Mar 2011 - Jun 2011
4 months

Interim and Project Manager

Vattenfall Europe AG

  • Conduct IMS workshop (International Management Systems)
  • International participants from all Vattenfall units
  • Present case studies and highlight critical success factors
  • Moderate final discussion with recommendations
Jan 2010 - Mar 2011
1 year 3 months

Project Lead

Deutsche Telekom AG

  • Improve IT infrastructure and security delivery levels for IT operations
  • Conduct requirement and analysis (RFI, RFP)
  • Analyze relevant ERP and non-SAP systems
  • Ensure measures for sustainable IT security improvement
  • Manage IT suppliers TÜV Rheinland and TÜV Trust IT
  • Design security “flagging database”
Feb 2009 - Dec 2009
11 months

Interim and Program Manager

MediaMarktSaturn Retail Group

  • Implement PPM/PMO with Scrum and agile methods
  • Digitize and reorganize e-commerce IT area, coach IT leadership
  • Align business needs and IT (solution architect, business analyst)
  • Coordinate ERP Navision selection with procurement
  • Conduct ERP/IT maturity assessment and requirement analysis
  • Analyze business processes and identify improvement potentials
  • Evaluate sourcing scenarios and align sourcing roadmap
  • Implement ITSM (demand, requirement, incident management) per ITIL
Feb 2008 - Feb 2009
1 year 1 month

Project Lead, Bid Manager

E.ON Energie AG

  • Roll out group-wide IAM (identity and access management)
  • Align business needs and IT (solution architect, business analyst)
  • Conduct market, requirement, and analysis (RFI, RFP)
  • Support IT procurement for supplier and software selection
  • Use best practices, benchmarking, scoring model, RFI/RFP tools
  • Conduct supplier interviews
  • Manage IT suppliers and service providers
  • Coordinate testing, test management, and system acceptance
  • Plan roll-out roadmap, training, and pilot
Aug 2007 - Dec 2007
5 months

Interim and Project Manager

TVP Treuhand und Verwaltungsges. für Publikumsfonds mbH

  • Define future IT landscape
  • Conduct requirement analysis
  • Analyze ERP and other IT systems, perform IT maturity assessment (RFI, RFP)
  • Align business needs and IT (solution architect, business analyst)
  • Analyze business processes and IT systems
  • Develop detailed concept for process handbook and IT systems
  • Design measures catalog for “new ERP solution”
  • Analyze digitalization and outsourcing potentials and identify quick wins
Mar 2007 - Feb 2008
1 year

Project Lead

E.ON IS GmbH

  • Digitize IT security, build IDM and IAM operating organization
  • Design single sign-on (SSO) and self-service portal
  • Implement and lead project office (PMO, waterfall)
  • Introduce project structure fitting task complexity
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
Jan 2007 - Mar 2007
3 months

Coach

Versatel Holding GmbH

  • Management support for implementing number portability
  • Design Mobile Number Portability help desk
May 2006 - Jan 2007
9 months

Project Lead, Test Coordinator

E.ON@future GmbH

  • Build a Europe-wide test best practices platform
  • Coordinate test coordination concepts for end-to-end test cases of all SAP and non-SAP applications
  • Develop service portfolio management concepts
  • Coordinate test concepts for network, integration, FUT/UAT and pilot testing
  • Define and implement quality gates
Jan 2006 - Jun 2006
6 months

Project Lead, Bid Manager

Vattenfall Europe AG

  • Digitize IT security
  • Implement group-wide IDM with SSO and self-service portal
  • Conduct alignment meetings with IT committee and local works council
  • Coordinate setup of program and project management office (PMO)
  • Perform international market analysis
  • Align business needs and IT (solution architect, business analyst)
  • Conduct market, requirement, and analysis (RFI, RFP)
  • Support IT procurement with RFI and RFP
  • Evaluate sourcing approaches and create business case
  • Manage supplier and software selection process
  • Conduct supplier interviews
  • Manage chosen service provider during development and implementation
  • Coordinate test management with pilot, acceptance tests, and go-live
Jan 2006 - Mar 2006
3 months

M&A Program/Project Lead

E.ON Energie AG

  • Define strategic basis for a carve-out (BCC)
  • Coordinate M&A process
  • Lead M&A team
  • Ensure detailed due diligence
  • Coordinate potential, product, and SWOT analysis
  • Prepare and present board presentation
Mar 2005 - Dec 2005
10 months

Program Manager

Vattenfall Europe AG

  • Optimize and harmonize IT processes
  • Conduct market, requirement, and analysis (RFI, RFP)
  • Perform digitalization assessment (IT audit) based on COBIT
  • Identify IT silos
  • Conceptualize ERP update (SAP IS-U)
  • Design IT landscape and roadmap
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
May 2004 - Mar 2005
11 months

Interim Manager

Vattenfall Europe AG / VE IS

  • Lead and build a user help desk (UHD) with leadership responsibility
  • Build UHD team of 65 FTEs
  • Improve customer satisfaction, employee motivation, and productivity
  • Implement ITIL services: problem, incident, and demand management
  • Coordinate selection and implementation of UHD IT infrastructure
  • Implement workforce planning and quality assurance tools
  • Analyze digitalization and sourcing potentials, identify quick wins
  • Analyze and implement program management KPIs
  • Present to executive board
Apr 2004 - May 2004
2 months
Austria

Coach

Österreichische Regulierungsbehörde

  • Launch mobile number portability (MNP) in Austria
  • Coach national project leadership
  • Provide IT strategy recommendations on quality assurance and testing methods
  • Provide strategy recommendations on system acceptance
  • Act as technical and business contact for national project leader
May 2003 - May 2004
1 year 1 month

Program and Interim Manager

Deutsche Bahn AG

  • Develop IT strategy for mobile land-train-land connectivity in long-distance passenger transport
  • Conduct market, requirement, and analysis (RFI, RFP)
  • Evaluate onboard IT infrastructure/WLAN and internet
  • Create business case, analyze digitalization, cross-selling, and sales potential
  • Design showcase for corporate board
  • Coordinate pilot feasibility proof
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
Jan 2003 - May 2003
5 months
United States

Project Lead

Verisign Inc.

  • Develop acquisition strategy recommendation for “Jamba!”
  • Set up and coordinate M&A project
  • Conduct due diligence
  • Identify potential deal breakers
  • Prepare closing presentation
  • Present decision template to board
Nov 2001 - Dec 2002
1 year 2 months
Germany

Program and Interim Manager, National Technical Project Lead, Bid Manager

German Mobile Industry

  • Roll out mobile number portability (MNP) nationwide
  • Implement program management and evaluate business case
  • Conduct market, requirement, and analysis (RFI, RFQ/RFP)
  • Align requirements with entire German mobile industry
  • Digitize entire MNP routing process
  • Design future IT infrastructure and service operating model with data center operations
  • Ensure setup of a central master routing database (MNP zMRDB)
  • Ensure audit-proof selection process
  • Conduct contract negotiations and support selection of general contractor
  • Quarterly reporting to regulator
  • Support IT procurement with RFI and RFP
  • Manage service providers
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
Mar 2001 - Dec 2001
10 months

Program Manager, Project Lead

E-Plus Mobilfunk GmbH & Co. KG

  • Ensure MNP readiness for non-discriminatory number porting
  • Conduct requirement and analysis (RFI, RFP)
  • Analyze IT infrastructure and business requirements, evaluate business case
  • Digitize entire MNP process
  • Coordinate project setup and project office (PMO, agile & waterfall)
  • Conduct IT service portfolio management assessment
  • Align business needs and IT (solution architect, business analyst)
  • Support IT procurement in requirement management and tender process
  • Provide stakeholder-friendly, transparent status reports (line management, executive board)
  • Set up and manage PMO
  • Implement program and project management
  • Track progress control
  • Plan and control quality, budget, and schedule
  • Stakeholder management, project controlling, risk management, resource management
Jan 2001 - Apr 2001
4 months

Project Lead, M&A Manager

LBK Landesbetrieb Krankenhäuser Hamburg

  • Support M&A process for Asklepios deal
  • Member of interdisciplinary management team
  • Transition management
  • Perform due diligence
Oct 2000 - Feb 2001
5 months

Coach

Networks Unlimited AG

  • Coach CEO of ERP software company
  • Introduce IT project management (PMO, waterfall) and project controlling methods
  • Introduce project portfolio management
  • Optimize ERP software development and QA processes
May 2000 - Jan 2001
9 months

Project Lead, Bid Manager

LBK Landesbetrieb Krankenhäuser Hamburg

  • Digitize clinical processes
  • Implement ERP clinical solution
  • Lead project and chief physician meetings in merger environment
  • Coordinate setup of project office
  • Introduce IT project management (PMO, waterfall)
  • Implement project portfolio management (PPM)
  • Align business needs and IT (solution architect, business analyst)
  • Conduct market, requirement, and analysis (RFI, RFP)
  • Evaluate sourcing approaches and support procurement in RFI/RFP
  • Coordinate industry software tender
Jan 2000 - Dec 2017
18 years
Copenhagen, Denmark

Partner

Putz & Partner Member of Ramboll Management Consulting GmbH

  • International engineering and IT management consulting
Jan 1998 - Dec 2000
3 years
Nuremberg, Germany

Member of Management Board

ISO Software Systeme GmbH

  • International software house for tourism ERP standard and custom solutions
Jan 1995 - Dec 1998
4 years
Hamburg, Germany

Managing Partner

Gruber&Team GmbH

  • Startup: international software house for tourism ERP standard and custom solutions, asset deal with ISO group
Jan 1992 - Dec 1995
4 years
Hamburg, Germany

Managing Partner

Agiles-Gruppe

  • Startup: hardware distribution, ERP standard and custom software trade
Jan 1987 - Dec 1992
6 years
Hamburg, Germany

Managing Partner, Spokesperson of Management

FlamingoTours Reiseveranstaltungs GmbH

  • Startup: international specialty tour operator for the Caribbean, South America, and Florida
Jan 1986 - Dec 1987
2 years
Hamburg, Germany

Consultant

Pape & Partner Unternehmensberatung GmbH

  • Management consulting
Jan 1982 - Dec 1986
5 years
Hamburg, Germany

Junior Consultant, Programmer, Working Student

IBM Deutschland GmbH

  • Customer and sales center North: /34, /36, /38, AS400
Summary

Acts at the interface between the business department and IT. Competent interlocutor for business and executive board levels in all project phases. Leadership and IT management experience. Experienced in working with internal and external customer teams as well as managing suppliers and service providers. Expert in digitalization, IT transition, IDM/IAM/IGA, ERP selection and implementation projects, PPM project portfolio management, IT maturity assessments, and M&A projects.

Languages
German
Native
English
Advanced
Spanish
Elementary
French
Elementary
Education

University of Hamburg

Diplom-Kaufmann (equivalent to Master of Business Administration) · International Management and Computer Science · Hamburg, Germany

Certifications & licenses

IT Governance & Compliance Practitioner ITGCP - COBIT 5.0

ISACA

PP_AGILE© (analogous to Scrum)

PP_ITSM© (analogous to ITIL)

PP_VM© (analogous to PMI)

Train-the-Trainer Certification "Developing Leadership Style for Trusted Advisor"