Optimization of internal business and production processes
Time measurement and scheduling of manufacturing processes
Hoshin
Management by Objective
Results: Goals and Actions Matrix for every organization level
Lean Transformation
Holistic view of all processes in scope with the aim of reducing or eliminating inflexibility, variability and waste.
Result: > 20% EBITA
Line Balancing
Increase Productivity on Production Lines
Results: +15% increase PPH/ OEE
Savings achievement per measure €120.000
SFM
Development, introduction and integration of a holistic shop floor management system (SFM) with the aim of quickly and efficiently recognizing the challenges of the day and managing them on the shop floor.
SMED
Reduce changeover time (monthly workshops)
Results: increase utilization
Six Sigma
Reduce variation of paint layer thickness.
Results: reduce scrap €130.000 and reduce paint usage €80.000 (environment related project)
Supplier Improvement
Process Improvement Projects
Results: Cost/Price Reduction
Value Stream Design
Line Walks with Line Mapping
Tool: VSD
Results: reduce Lead Time, identify wastes and generate point kaizens
Summary
Automotive & Industry
Lean Management
Kaizen
Value Stream Mapping & Design
Six Sigma (Black Belt)
Hoshin Kanri
Continuous Improvement Process (CIP)
SMED
TPS
OEE
Theory of Constraints (TOC)
Languages
German
Advanced
English
Advanced
Education
Apr 2006 - Jul 2007
TFH Berlin
Master in Business Administration and Engineering · Business Administration and Engineering · Berlin, Germany · good
Oct 2000 - Sep 2005
FHTW Berlin
Diploma in Industrial Engineering, Innovation Management · Industrial Engineering · Berlin, Germany · good