Experience

Oct 2024 - Present
1 year 3 months

Power Plant Solution Engineer

Vestas

  • Address customers’ electrical and grid-related inquiries to ensure on-time project delivery in full compliance with grid code requirements.
  • Document areas for improvement encountered during projects to provide feedback to the R&D team for future product enhancements.
  • Support customers on Nordseecluster (NSC) and Nordlicht (NDL) projects by explaining Vestas PPC and WTG control logic and methods.
  • Author PPC Function Design Specification (FDS) documents describing the functionality and design of the Wind Power Plant control system.
  • Tune PPC parameters according to project-specific settings agreed upon by customers and TSOs for full grid code compliance.
  • Clarify technical background of contractual agreements for project managers to protect company interests while fulfilling legal obligations.
  • Participate in negotiating testing procedures for the Baltic Eagle project and issue grid code testing procedure documents for NSC and NDL.
  • Create grid code compliance statements (GCCS) based on Germany and Netherlands grid codes and assess Vestas PPC, WTG, and SCADA system capabilities.
  • Document gaps in current product coverage and deliver them to the R&D team for prioritization in future development.
Oct 2022 - Oct 2024
2 years 1 month
Hybrid

Hybrid Power Plant Control Engineer

SGRE

  • Validate models by using field wind speed data to test the generic hybrid plant simulator model in Simulink and analyze the results.
  • Develop automated scripts for Model-in-the-Loop (MiL) testing to generate reports and assist in setting up Hardware-in-the-Loop (HiL) testing.
  • Design control algorithms for the Limited Energy Reservoir (LER) concept based on grid code compliance requirements from the Danish TSO, Energinet.
  • Port control algorithms from Simulink to the Siemens Energy Omnivise T3000 platform, create porting guidelines, and perform HiL testing.
  • Implement Modbus communication and thorough testing methods for the ported functions during the Kragerup Gods wind-to-X demonstrator project.
Jun 2022 - Aug 2022
3 months
Brande, Denmark

Student Worker

Siemens Gamesa Renewable Energy

  • Design Python code that can automatically call Matlab Simulink to generate structured text and import into Codesys as a Codesys library.

Summary

As I transitioned into the industry, I began working on hybrid power plant control.

Languages

Chinese
Native
English
Advanced
Danish
Elementary
German
Elementary

Education

Sep 2020 - Jul 2022

DTU, Technical University of Denmark

Master of Science · Wind Energy · Denmark

Sep 2016 - Jun 2020

Qingdao University of Science And Technology

Bachelor of Science · Electrical Engineering · Qingdao, China