Recommended expert

Atif Teta

Director of Operations (Interim)

Atif Teta
Bremen, Germany

Experience

Dec 2023 - Dec 2025
2 years 1 month

Director of Operations (Interim)

Hyva

  • Took full responsibility for P&L, R&D, HR, finance and quality at Hyva Italy
  • Reduced downtime by 30% through efficient optimization of production planning
  • Increased productivity by 20%
  • Initiated control mechanisms like whiteboards to improve transparency and efficiency
  • Enhanced employee satisfaction through clear structures and effective leadership
  • Reduced headcount by approximately 15%, from 224 to 199, without impacting productivity
  • Achieved cost savings of €1.35 million through vehicle leasing and closing an external warehouse
  • Organized weekly strategy meetings with department heads and stakeholders to foster collaboration and strategic alignment
May 2022 - Dec 2025
3 years 8 months

Plant Manager (Permanent)

Hyva

  • Held full responsibility for P&L at the Olbersdorf site
  • Minimized downtimes by 20% through targeted production interventions
  • Increased productivity by 17%
  • Introduced control mechanisms like whiteboards as a first measure
  • Improved employee motivation by introducing JobRad and fruit baskets
  • Implemented KPIs on 17 CNC machines and four assembly lines
  • Reduced headcount by approximately 20%, from 117 to 93
  • Achieved cost savings of €1.2 million in 2022
  • Conducted weekly strategy meetings with department heads and stakeholders
  • Implemented continuous improvement processes, lean management and 5S activities
  • Optimized HR processes by introducing a digital time-tracking system
  • Managed an L&O budget of €8.1 million with a turnover of €48 million
  • Oversaw a CAPEX budget of €2.4 million in 2023
Sep 2021 - Apr 2022
8 months

Operations Manager (Interim)

Royal Mail

  • Led 450 employees in warehousing, distribution and dispatch
  • Assumed PIC responsibility for automation
  • Implemented PSM (Parcel Sort Machine) for the first time
  • Participated in the central project team for rolling out automation in 20 distribution centers
  • Created seasonal forecasts
  • Organized timely return of customer goods (letter center sorting)
  • Reimplemented primary and secondary sorting via PSM
  • Rolled out a new PDA system at four manual centers
  • Managed a fleet of 250 vehicles in 24/7 operation
Apr 2021 - Sep 2021
6 months

Interim Senior Logistics Manager (Interim)

Grupo Antolin

  • Restructured the logistics department by transferring full operations from Redditch 1 to Redditch 2
  • Implemented KPIs within internal logistics
  • Coordinated with key internal and external stakeholders nationally and internationally (transfers to Germany and Spain)
  • Automated packaging control for an efficient workflow
  • Contributed to harmonizing efficient processes, procedures, methods and resources
  • Served as primary contact for customers like BMW, JLR Solihull and JLR Castle Brom
  • Improved internal material flow through SMED analyses
  • Automated material disposition in SAP
  • Took over production planning for injection molding and press machines
Jul 2019 - Apr 2021
1 year 10 months

Plant Manager

EUROFIT Group

  • Ensured daily execution of production activities and strategic future planning for a growing business
  • Increased production efficiency from 62% to 82% through strategic planning and inspiring leadership
  • Held responsibility for overall operations, planning and P&L of €14 million
  • Led the purchasing team to achieve 5% lower costs in 2020
  • Oversaw maintenance of facilities and equipment
  • Controlled CAPEX and depreciation
  • Optimized organizational and personnel capabilities to meet current and future demands
  • Maintained health and safety records and implemented a new role as H&S inspector
  • Installed a second high-voltage generator in compliance with local regulations
  • Developed plant goals and business plans in line with Eurofitgroup strategies
  • Managed project budgets of €24 million across four countries with about 16 suppliers
Aug 2018 - Jul 2019
1 year

Senior Supply Chain/Plant Manager (Interim)

Grammar Inc

  • Took full responsibility for daily management and execution of the supply chain including all sub-level and ad-hoc projects
  • Set lead times, raw materials, inventory levels and production requirements for manufacturing and suppliers in S&OP
  • Assumed full responsibility for CAPEX and P&L
  • Monitored performance levels of raw material inventory management
Mar 2018 - Aug 2018
6 months

Plant Manager (Interim)

LEONI

  • Reduced inventory value in Durango/Hermosillo and Mérida, Mexico by a total of $3.5 million and reported to the VP Supply Chain
  • Led a €17 million reduction project across eight LEONI plants within three months
  • Achieved results by implementing PDCA and following a daily action plan
  • Focused on SAP master data management for MM and SD
  • Reduced supplier lead times through targeted adjustments and implementation of the JNI tool
Oct 2017 - Mar 2018
6 months

Project Leader (Interim)

BMW

  • Led the project to implement a new logistics structure across all four BMW plants as part of the Brexit initiative
  • Estimated £26 million in costs for new structures and communicated them to the board for approval
  • Managed the project and multiple sites
  • Conducted customs research in collaboration with 3PL providers
  • Intensified Brexit planning for BMW Swindon, BMW Hams Hall and Rolls-Royce Goodwood
  • Created capacity plans for Brexit project teams in all UK plants for 2018 and 2019
Oct 2016 - Oct 2017
1 year 1 month

MP&L Project Leader (Interim)

Jaguar Land Rover

  • Created weekly reports on logistics status for PST meetings
  • Led project logistics for the 8X760 Pembroke project
  • Conducted ERP and MRP coaching sessions
  • Oversaw three projects in total
  • Negotiated and procured 3PL services
  • Acted as purchaser for small parts
  • Coached prototype material planning
  • Integrated logistics and VE departments as well as change management into bills of materials
Nov 2015 - Oct 2016
1 year

Logistics Manager (Interim)

Magneti Marelli

  • Implemented JIS integration with a lead time of 158 minutes and developed the design for a JIS monitoring system
  • Reduced staff from 21 to 9
  • Optimized internal material flow
  • Managed OPEX for transport and operations
  • Participated in A-price and B-price calculations for the Amarok project in Argentina
  • Conducted a production analysis and implemented results to maximize machine capacity by reducing shifts
Feb 2015 - Jun 2015
5 months

Packaging (Interim)

Grammer AG

  • Maintained and adjusted RL-T codes
Mar 2014 - Jan 2015
11 months

Material Planning and Logistics Engineer (Interim)

Visteon

  • Implemented door equipment at the VW customer site in Poznań, Poland
  • Conducted project planning for three models and prepared A-price and B-price calculations for VW
Jan 2013 - Feb 2014
1 year 2 months

Head of Logistics

Magna International Inc

  • Ensured timely procurement of materials and services for the Daimler Benz plant in Bremen and initiated rollout of a new enterprise software solution for sales reporting
  • Strengthened business by implementing a new forwarding system
  • Trained and coached employees to ensure smooth introduction of the new program
  • Worked closely with sales, customers and internal interfaces to win new projects and drive development and implementation of new policies in Europe
  • Exceeded corporate goals by reducing inventory from €2.1 million to €1.6 million
  • Increased profit by 60% in one year through business line restructuring
  • Assigned shipments to forwarders in the central database
Jun 2008 - Dec 2012
4 years 7 months

PC&L Coordinator and Deputy Logistics Manager

Faurecia Emission Control Technologies

  • Successfully implemented new logistics procedures within four months for the plant in Hungary
  • Participated in contract negotiations for the "Makan" project at the Leipzig plant
  • Managed all inbound and outbound processes and prepared supplier evaluations
  • Translated business requirements and priorities into new logistics strategies
  • Minimized damage and repair costs through careful management and preventive maintenance
  • Took corrective actions in case of accidents and delays
  • Optimized delivery schedules to maximize productivity and reduce costs

Industries Experience

See where this freelancer has spent most of their professional time. Longer bars indicate deeper hands-on experience, while shorter ones reflect targeted or project-based work.

Experienced in Automotive (12 years), Manufacturing (7 years), and Transportation (0.5 years).

Automotive
Manufacturing
Transportation

Business Areas Experience

The graph below provides a cumulative view of the freelancer's experience across multiple business areas, calculated from completed and active engagements. It highlights the areas where the freelancer has most frequently contributed to planning, execution, and delivery of business outcomes.

Experienced in Operations (10 years), Procurement (8.5 years), Logistics (8 years), Supply Chain Management (5.5 years), Project Management (5 years), and Production (4.5 years).

Operations
Procurement
Logistics
Supply Chain Management
Project Management
Production

Summary

Experienced Plant Director with over 10 years of expertise in operations management and Lean Manufacturing. Successfully reduced downtime by 30% and increased productivity by 20% at Hyva by implementing effective optimization strategies. Proven success in cost reduction and team leadership, including delivering savings of €1.35 million. Committed to continuous improvement and innovative solutions, positioned to contribute significantly to a company’s growth and success.

Languages

German
Native
English
Advanced
Spanish
Elementary
Urdu
Elementary

Education

Feb 2011 - May 2014

Bremen Chamber of Commerce and Industry (IHK Bremen)

Bachelor/Master Craftsman · Logistics Management · Bremen, Germany

Certifications & licenses

Level 2 Lean Organisation Management Techniques

NVQ-Level 3 Logistics

Prince 2

Profile

Created
Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions

Frequently asked questions

Do you have questions? Here you can find further information.

Where is Atif based?

Atif is based in Bremen, Germany and can operate in on-site, hybrid, and remote work models.

What languages does Atif speak?

Atif speaks the following languages: German (Native), English (Advanced), Spanish (Elementary), Urdu (Elementary).

How many years of experience does Atif have?

Atif has at least 17 years of experience. During this time, Atif has worked in at least 14 different roles and for 13 different companies. The average length of individual experience is 1 year and 3 months. Note that Atif may not have shared all experience and actually has more experience.

What roles would Atif be best suited for?

Based on recent experience, Atif would be well-suited for roles such as: Director of Operations (Interim), Plant Manager (Permanent), Operations Manager (Interim).

What is Atif's latest experience?

Atif's most recent position is Director of Operations (Interim) at Hyva.

What companies has Atif worked for in recent years?

In recent years, Atif has worked for Hyva, Royal Mail, Grupo Antolin, and EUROFIT Group.

Which industries is Atif most experienced in?

Atif is most experienced in industries like Automotive, Manufacturing, and Transportation and Logistics.

Which business areas is Atif most experienced in?

Atif is most experienced in business areas like Operations, Procurement and Purchasing, and Logistics. Atif also has some experience in Supply Chain Management, Project Management, and Production/Manufacturing.

Which industries has Atif worked in recently?

Atif has recently worked in industries like Manufacturing, Automotive, and Transportation and Logistics.

Which business areas has Atif worked in recently?

Atif has recently worked in business areas like Operations, Production/Manufacturing, and Strategy and Planning.

What is Atif's education?

Atif holds a Bachelor in Logistics Management from Bremen Chamber of Commerce and Industry (IHK Bremen).

Does Atif have any certificates?

Atif has 3 certificates. These include: Level 2 Lean Organisation Management Techniques, NVQ-Level 3 Logistics, and Prince 2.

What is the availability of Atif?

Atif will be available full-time from March 2026.

What is the rate of Atif?

Atif's rate depends on the specific project requirements. Please use the Meet button on the profile to schedule a meeting and discuss the details.

How to hire Atif?

To hire Atif, click the Meet button on the profile to request a meeting and discuss your project needs.

Average rates for similar positions

Rates are based on recent contracts and do not include FRATCH margin.

1200
900
600
300
Market avg: 870-1030 €
The rates shown represent the typical market range for freelancers in this position based on recent contracts on our platform.
Actual rates may vary depending on seniority level, experience, skill specialization, project complexity, and engagement length.