  • The electronic patient record (ePA), jointly developed by the Bitmarck Group and the software house RISE, was successfully rolled out to all 87 affiliated statutory health insurers on January 1, 2021. Insured persons can download their insurers' ePAs from the Apple or Google app stores and use them on a voluntary basis to archive their medical documents - and, if needed, share them with their doctors to avoid, for example, duplicate treatments.
  • As part of the project assignment, the functionality of the ePA app for iOS and Android mobile devices as well as the Windows and macOS desktop application was tested, including:
  • Basic, smoke, and regression testing
  • Tests for new app releases to obtain approvals
  • Tests for new component releases to obtain approvals
  • Test case creation and their extensions and adaptations to new releases
  • Test design and test plan creation
  • Defect management
  • Communication and coordination with business units, technical departments, and development
  • Support in product design
  • Tools: Confluence, Jira, Teams, Windows, macOS, Android, iOS
Dec 2021 - Apr 2022
5 months
Germany

Service Management Consultant

Hessian Data Processing Center

  • Commissioned by the Hessian State Chancellery, the HZD service desk was tasked with creating standardized processes for reporting and handling the loss/theft of security-relevant access media:
  • Notebooks/Tablets
  • Smartphones
  • VPN tokens
  • Secure boot sticks
  • User access credentials
  • This included:
  • Conducting an inventory of the current procedure.
  • Documenting special cases and deviations in the police, justice, and Hessian state parliament sectors.
  • Defining general and access-media-specific requirements.
  • Developing a concept for the future approach to procedure standardization in two stages - initial implementation variant and full implementation.
  • Tools: Skype, Word, Excel
Nov 2021 - Nov 2021
1 month
Germany

Consultant

Neovia Germany GmbH

  • Short project:
  • Creation of a test concept for the introduction of a new logistics system and replacement of the existing legacy system
  • Creation of a training concept
Aug 2020 - Jun 2021
11 months
Germany

Technical Implementation Coordinator and Subproject Lead

Hessian Data Processing Center

  • Subproject lead and collaboration on process definition and implementation as part of the Online Access Act implementation for the following projects at the Hessian Data Processing Center:
  • Registration procedure for care and nursing facilities
  • Operating cost subsidies for daycare centers
  • Anti-money laundering
  • Export of medical devices
  • Tools used: SharePoint, Skype, Word, Excel
Oct 2017 - Apr 2020
2 years 7 months
Germany

Test and Quality Manager, Customer Support, Release Manager

Avaya Deutschland GmbH

  • In the context of Avaya's redesign of the telecommunications environment at AOK, a web-based application (customer portal) was developed to enable AOK employees, managers, and administrators to administer and access extensive data (e.g., number management, pickup groups, ACD hunt groups, reports, fax devices, asset management, ticketing, permission assignment, cost center management).
  • Over the course of the project, the customer portal platform developed by an external company was internally reprogrammed by Avaya software development and deployed with the AOK clients.
  • Created user and administrator manuals for the AOK customer portal.
  • Lead quality management for the newly created customer portal software based on ITIL guidelines.
  • Review and testing of the user interface design.
  • Member of Avaya's QoS team for the customer portal.
  • Creation and review of test cases.
  • End-to-end tests: telephone system -> devices -> customer portal software.
  • Error analysis/tracking and organization of error resolution.
  • Support for AOK Hessen, kubusIT, AOK Systems, and AOK RPS during tests and technical inquiries.
  • Management of error reports (Jira) and coordination between end customers, Avaya project management, and Avaya software development.
  • Change and release manager for the introduction of new releases (2-3 week intervals).
  • Gathering customer requirements and coordinating with development and project management regarding feasibility and budgeting.
  • Migration of data from production to test data.
  • Modification of test data via SQL queries to adapt to possible test scenarios.
  • 2nd level support for the service.
  • Support of various AOK clients and their service providers as test manager and customer support for the customer portal platform.
  • Creation of individual test plans for the AOK clients.
  • Tools used: Jira, Confluence, SharePoint, Slack, Trello, HeidiSQL
Apr 2016 - Jan 2017
10 months

Test Manager

British Telecom

  • Responsible test manager for British Telecom on Commerzbank project "Connected": replacing the entire voice infrastructure including all peripheral interfaces at all Commerzbank sites and branches worldwide (>50,000 users).
  • New systems include:
  • Cisco Unity Call Manager in several clusters
  • Cisco Jabber
  • Presence solutions
  • Verint Voice Recording
  • WebEx integration
  • Video conferencing
  • Trading integration
  • Call center integration
  • Working with the Commerzbank test manager to test the test cases created by the responsible teams in the pre-live test environment, evaluate the results, and work through errors together with the project managers.
  • Preparing and organizing test cases from the different areas of responsibility
  • Managing test execution with BT and CoBa testers
  • Performing and supporting tests (single tests up to end-to-end tests)
  • Maintaining test cases in HPQC
  • Planning, managing, and controlling the four test phases according to ITIL guidelines
  • Documenting test execution and errors (participating in error analysis)
  • Revising test cases in case of deviations in coordination with the customer
  • Creating a test plan
  • Monitoring and documenting bug fixes, organizing re-tests
  • Daily organization of a test schedule for pre-tests by BT testers
  • Participating in creating the test concept and test plan
  • Daily creation of status reports for the BT and CoBa project management
  • Leading and moderating test meetings and daily status conference calls
  • Weekly reporting to the BT and CoBa project management on test progress (statistics, etc.)
  • Evaluating test cases before and after tests
  • Managing and evaluating performance analyses and tests
  • Tools: HP Quality Center, Word, Excel
Feb 2016 - Mar 2016
2 months
Mouscron, Belgium

Project Manager

WTG Westfälische Telefongesellschaft

  • Managing the replacement of network and telecommunication components (Avaya AURA) in the data centers for Lufthansa Cargo Future in Hahn and Mouscron.
  • Recording and updating the current state
  • Coordinating the setup of the new components
  • Planning, aligning, and supporting the rollout
  • Tools: Word, Excel
Dec 2015 - Feb 2016
3 months
Germany

Project Manager

First Data Deutschland GmbH

  • Coordinating the network migration from Frame Relay to MPLS at AT&T Circuits.
  • 13 First Data customers in Ireland, the UK, Italy, Dubai, and Saudi Arabia.
  • Tools: Word, Skype
Sep 2015 - Oct 2015
2 months
Frankfurt, Germany

Technical Project Manager

Sage Software GmbH

  • Documenting the hardware of the existing videoconferencing system at the Frankfurt site (Cisco WebEx).
  • Organizing and supporting the kickoff for FY 2016. This was conducted via a WebEx videoconference across seven locations.
  • Technical discussions and tests with an external videoconference service provider, PGi.
  • Organizing an alternative solution for the current sound system at the Frankfurt site.
  • Researching an alternative solution using Cisco TelePresence.
  • Tools: Word, Excel, WebEx Videoconference
Apr 2014 - Sep 2015
1 year 6 months
Germany

Technical Project Manager

WTG Westfälische Telefongesellschaft

  • IT/telecom audit at Kabel Deutschland GmbH
  • Recording the IT/telecom infrastructure in the data center and documenting it
  • Documenting the server and client applications used in the data center
  • Recording the organizational procedures (release management, etc.)
  • Documenting information about external service providers
  • Reviewing and evaluating the collected data
  • Making recommendations on the above points
  • Creating a communication diagram for the new telephony environment of Sheraton Hotels.
  • Subproject management for Applications & Integrations in the IT-Exchange project of Eplus Customer Services.
  • As part of this project, WTG is responsible for the complete rebuild of the ECS telephony environment. The following activities (among others in the Eplus data center) were carried out:
  • Installing and configuring the CTI software Avaya Interaction Center
  • Coordinating the installation of the Avaya SAP Connector
  • Subproject management for integrating external applications into the newly built Avaya telephony environment (Avaya AURA, SAP, Kubis, Shrimps, SP-Expert, Datawarehouse, SATMAP)
  • Designing IP and host names for about 80 new systems
  • Creating design specifications for the SAP, Kubis, and Shrimps subprojects
  • Coordinating the implementation of a new call recording system from NICE
  • Defining and implementing call recording rules according to legal and internal customer regulations
  • Creating communication matrices and firewall rules
  • Managing the test environment
  • Test management for system tests, integration tests, and user acceptance tests (creating test cases and test plans, managing and coordinating tests, testers, and test processes, analyzing test results)
  • Release management for deploying new software updates
  • Coordinating error analysis and correction
  • Creating various user documentation
  • Creating technical documentation describing the hardware environment
  • User management for the NICE and AIC systems – organizing automated user maintenance (e.g., via LDAP), setting up administrative accounts
  • Tools: Jira, Confluence, SQL
Jul 2013 - Dec 2013
6 months
Frankfurt, Germany

Technical Consultant

Kreditanstalt für Wiederaufbau

  • Technical project support for the introduction of complex test environments
  • Project name: IT Operations Professionalization
  • Subproject: Test System Management
  • Analysis of the planned infrastructure for two large-scale projects in the client/server (including WebSphere, Apache) and IBM mainframe environments
  • Derivation and design of test environments for these large-scale projects
  • Participation in the business target description for setting up a pre-production environment and introducing system integration test environments
  • Designing a questionnaire to determine the test system requirements for business-critical legacy systems
  • Consolidation of the analysis results from the architecture board of the overall production infrastructure regarding the technology used, applications, interfaces, databases, infrastructure
Mar 2012 - Mar 2013
1 year 1 month
Frankfurt, Germany

Technical Project Lead and Maintenance

ING-DiBa AG

  • Technical project support for the introduction of a new NICE call recording system:
  • Gathering requirements on a business and technical level
  • Developing the architecture design for the production, pre-production, and development environments
  • Integration into the existing environments
  • Creating the IT concept together with the business units
  • Leading and controlling the implementation in cooperation with the IT teams (Windows, datacenter, network, security, voice, storage)
  • Managing the connection to the Avaya AURA Communication Manager
  • Evaluating, controlling, and supporting the design of all required security measures (network design, firewall settings, redundancy design, load balancing) in ING-DiBa's data center
  • Defining and implementing call recording and retention rules according to legal regulations (BaFin/MiFID)
  • Creating and reviewing the test concept
  • Planning, organizing, and overseeing load and performance tests
  • Organizing the setup of the test environments (test environment management)
  • Test management and execution of technical tests (HP Quality Center)
  • Test management for business user tests
  • Supporting user integration (LDAP/AD)
  • Error analysis and tracking
  • Successful rollout planning and execution
  • Creating user documentation for call search and playback
  • Supporting daily operations:
  • Training and onboarding a new employee
  • Maintaining systems: Avaya Interaction Center, Verint call recording, Avaya Enablement Server, configuring the Avaya PBX
  • Incident and problem management
  • Planning, organizing, and conducting releases as the responsible release manager
Jan 2011 - Dec 2011
1 year
Germany

System Engineer Release and Configuration Management

Deutsche Telekom Products & Innovation

  • Technical coordination in the 'VoIP Support Systems' team
  • Planning and monitoring rollouts for cross-system projects and releases as responsible release manager
  • Analysis and presentation of the current infrastructure in the data center
  • Coordination of system decommissioning or upgrading outdated system environments (hardware, OS, middleware)
  • Technical subproject management in the 'Videomeet' project (system architecture, system setup, requirements, documentation, tests)
  • Supporting and training the team in creating changes
  • Technical support for the rebuild of the web conferencing system (hardware rollout)
  • Interface to license management, application management, operations, quality management, T-Systems, etc.
  • Organizing load balancer configurations, network enablements, database installations, access permissions, DNS
  • Maintaining the monitoring handbook for VoIP support systems
  • Technical support for IPv6 introduction
  • Project management for 'IVR-based authentication'
  • Environment: Genesys
Apr 2009 - Dec 2010
1 year 9 months
Germany

System Engineer Voice Value-Added Services

DB Systel GmbH

  • Technical subproject management in the area of value-added services in the Deutsche Bahn group-wide VoIP project
  • Collaboration in the design, setup, and introduction of value-added services in the DB Systel test data center for the Cisco VoIP solution test environment
  • Components:
  • Voicemail (Cycos mrs by Siemens Enterprise)
  • Announcement service (IVR by Siemens Enterprise)
  • Unified Messaging (UMS by Siemens Enterprise)
  • CTI (Click2Call by Cisco) integration in IP telephony
  • VoIP softphone (IP Communicator by Cisco)
  • Conference call system (Meetingplace by Cisco)
  • Lotus Notes Sametime integration (Presence by Cisco)
  • Activities:
  • Gathering requirements
  • Connecting the systems to Cisco CallManager
  • Project tracking
  • Designing, test management, and execution of acceptance-relevant system tests
  • Support in building a complex test environment (test environment management)
  • Architecture and system design of the voicemail system for 40,000 users in the live network
  • Support for user integration (LDAP/AD)
  • Coordination of DB Systel departments with the vendor for system setup and system connection to the CUCM VoIP telephone system
  • Supervision of the pilot phase and field test during VoIP setup in the data center
  • Creating user and system documentation
  • Project-related introduction of 'Systems' processes in the 'Telematic' environment (tools for incident and change creation and monitoring, error reporting tools, release handling, databases)
  • Design of the company-wide voice user database for the systems CUCM, Cycos mrs, CUMP, and CUPS
  • Technical environment: Cisco Unified Communication Manager (CUCM), Cycos mrs, Lotus Domino / Sametime, LDAP
Dec 2003 - Jan 2004
2 months
Germany

IT Support and Consulting

Sogec Marketing GmbH

  • Defining database descriptions
  • Creating statistical analyses
  • IT consulting for project implementation
Oct 2003 - Apr 2004
7 months
Germany

IT Consultant

Allgemeine Deutsche Direktbank AG

  • Design and development of a CTI client application (C++) for transferring calls within the call center based on the Lucent CTI server system "CTITalent" (October 2003).
  • Switching the communication interface of the CTITalent software to socket communication. Corresponding adjustments in all server and client modules (November 2003 - April 2004).
Jun 2003 - Dec 2008
5 years 7 months
Frankfurt, Germany

Software Development and IT Project Management

ING-DiBa AG

  • Architecture design for the future CTI environment regarding the relocation of all components to the data centers and the centralization and consolidation of the telephone systems
  • Project tracking
  • Gathering requirements
  • Budget calculation
  • Support for tenders
  • Selection and evaluation of hardware components
  • Preparation of the software upgrade
  • Requirements analysis and liaison with specialist departments
  • Developing IT concepts
  • Creating comprehensive system and user documentation
  • Test management and execution of functional and technical tests
  • Architecture design and implementation of the CTI system Avaya Interaction Center (14 servers, 3 locations, 1500 agents)
  • Architecture design and implementation of the call recording system Avaya Contact Store (10 servers, 3 locations)
  • Architecture design and implementation of Avaya Enablement Services (6 servers, 3 locations)
  • Architecture design and implementation of test environments for all CTI systems (test environment management)
  • Coordination of interfaces with customer teams: UNIX, Windows client, Windows server, databases, application support, security, SAN data
  • Support and consulting for the CTI integration of the bank's customer dialogue application (softphone) and the Siemens IVR
  • Business analysis and consulting in the design of the user interface for the employee call center software in coordination with the relevant department
  • Definition of the interfaces of an OCX for connecting the ING-DiBa softphone to AIC with integration into LDAP/AD
  • Specification of a proprietary SNMP process for AIC to send error messages to the bank's monitoring system @friend (Active Friend, Siemens)
  • Specification of a proprietary process for login-independent monitoring of all devices in customer dialogue
  • Definition of call recording rules according to BaFin regulations
  • Central contact and advisor for all CTI questions, projects, and issues at ING-DiBa AG
  • Collaboration in implementing the IT landscape in the data center according to ITIL guidelines
Jan 2002 - Oct 2004
2 years 10 months
Germany

Service, support and further development (CTI server system "CTITalent")

Avaya Deutschland GmbH

  • Service, support and further development for Avaya regarding the CTI server system "CTITalent" (on-call as needed)
  • Creation of a feasibility analysis for merging two call centers based on software-related similarities and differences (August 2002).
Jan 2002 - Jun 2003
1 year 6 months
Nuremberg, Germany

IT Consultant

Entrium Direct Bankers AG

  • Various CTI and IT support, as well as error analysis, system and configuration checks
Jan 2002 - Mar 2002
3 months
Germany

Software and hardware architecture design

Westfälische Provinzial Versicherung AG

  • Development of client software to display queue and agent status information at agent workstations for the head office (Avaya Definity, Windows NT)
  • Development of a server program:
  • Access to online data provided by socket connections on the Avaya CMS (Sun)
  • Access to historical daily data provided via an ODBC connection on the Avaya CMS (Sun)
  • Development of a client program:
  • Graphical and text display of daily data for viewing current queue and agent information across the entire call center, as well as a primary skill
  • Creation of a user manual and a system manual
Jul 2001 - Dec 2001
6 months
Darmstadt, Germany

Project Manager

Sikom Software GmbH

  • Service, support and further development for Avaya regarding the CTI server system
  • Setting up the Darmstadt site: planning, procurement and installation of infrastructure (telephony, servers, etc.)
  • DAK Deutsche Angestellten Krankenkasse:
  • Project management for the introduction and installation of Sikom's own speech recognition software "Voiceman"
  • Initial integration of the software with the Nortel Meridian telephony system
  • Requirements engineering for the DAK helpdesk frontend software
  • User interface design for the DAK helpdesk
  • Monitoring and control of software development, troubleshooting and quality management
  • Crisis management
  • Creating specifications, user documentation and a system manual
Jan 2001 - Jun 2001
6 months
Darmstadt, Germany

Project Manager

Authensis AG, Central division

  • Service, support and further development for Avaya regarding the CTI server system
  • Specification of a license management system for the Authensis ACD system "Achat"
  • Specification of an email adapter for intelligent distribution of emails, integrated into the Authensis ACD system "Achat"
  • Supporting Authensis in setting up (Darmstadt) and expanding (other sites) the infrastructure (including use of the CVS software management tool)
Sep 1997 - Dec 2000
3 years 4 months
Weiterstadt, Germany

Senior Software Engineer

Lucent/Avaya Technologies Professional Services

  • Call center for Comdirect Bank AG
  • Project management, specification and implementation of a CTI server system for voice-data integration
  • The voice response system
  • The voice recording system
  • The Lucent Definity G3x telephony system
  • The frontend applications
  • Specification of APIs for IVR, VLU and the frontend
  • Team: 5 members
  • AIX, C++, CTI middleware IBM Callpath, message router pipes
  • Expansion and further development of this system, among other things into a virtual, multi-site CTI server system
  • Presales and project management of the integration and customer-specific customization of the CTI server system at three additional German banks and one French direct bank:
  • Comdirect Bank AG in Kiel
  • Comdirect Bank AG in Paris
  • Commerz Service GmbH in Essen
  • Commerzbank AG (test environment in Frankfurt/Main)
  • Allgemeine Deutsche Direktbank AG in Frankfurt/Main
  • Allgemeine Deutsche Direktbank AG in Hannover
  • Entrium Direct Bankers AG in Nürnberg
  • Presales and conducting various CTI workshops to gather customer-specific CTI requirements, including at:
  • Stadtsparkasse Köln
  • Postbank main branch Bonn
  • Prompter AG
  • Swisscom AG
  • Specification and project management of various CTI integrations (e.g., host-based routing projects) at:
  • Vorwerk & Co.
  • DHL Worldwide Express
  • Other activities:
  • Specification of a Java softphone to connect to the CTI server
  • Training and onboarding of new employees
  • Consulting and support for customers and BCS employees on integration and CTI call center-specific issues
  • Sales and presales support
  • Monitoring software development work within the department
Jul 1995 - Aug 1997
2 years 2 months
Weiterstadt, Germany

Software development engineer

Triple C GmbH

  • Developing internal programming guidelines
  • Creating a specification for a Windows 3.11 GUI application for freely configurable user-specific statistical analysis and online display of Informix ACD data from the Siemens HiCom 300 telephony system, called "Reportgenerator"
  • Implementing the Reportgenerator under Borland C++: specification and implementation of the extension of the Reportgenerator to the ACD V2.5 of the Siemens HiCom 300 telephony system, called "ReportView"
Nov 1992 - Jun 1995
2 years 8 months
Dreieich, Germany

System engineer

LH Integration

  • New development and enhancement of an external ACD for the Siemens HiCom ICD/2 telephony system based on IBM OS/2 in C++
  • Specification and implementation of server and client components, tools and libraries
  • Interface between ICD and voice response units (IVR), automatic generation of multilingual text files
  • Developing internal programming guidelines
  • Supporting the quality assurance team
  • Project management
Mar 1988 - Nov 1992
4 years 9 months
Frankfurt, Germany

System Engineer

Cap Gemini Deutschland GmbH (later Cap Gemini SCS BeCom GmbH and Cap Debis BeCom GmbH)

  • Specification and implementation of a test system for the in-house real-time multitasking operating system SRE/86 on PC/AT, DOS, using Turbo Pascal, MS Pascal, and MS assembler
  • Implementation of a multitasking application for presenting SRE/86 at trade shows: control of 3 robot arms
  • Specification and implementation of a software package (INTERGRAF) for collecting, statistical analysis, and graphical presentation of measurement data in a PC-based process control system
  • Development of a test suite for approval testing of X.21 data terminal equipment (NET1)
  • Project management, planning, high-level and detailed specifications, and implementation of an evaluation system for the Intergraf software (see above)
  • Development of mobility management (MM) software in Layer 3 for a GSM mobile station on the D1 network (team: 30 employees, VAX/VMS, SDL, C, customer-specific development tools)

Languages

German
Native
English
Advanced
French
Advanced

Education

Oct 1984 - Jun 1987

Cologne University of Applied Sciences, Gummersbach Dept.

Diploma in Business Informatics · Business Informatics · Gummersbach, Germany

Oct 1982 - Jun 1984

University of Bonn

Physics, minor in Chemistry · Bonn, Germany

Municipal High School Siegburg

High school diploma (Abitur) · Siegburg, Germany

Certifications & licenses

PRINCE2

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions