Klaus Brenner

Freelance Consultant

Heidelberg, Germany

Experience

Oct 2024 - Jul 2025
10 months
Heidelberg, Germany

Renovation, expansion and new fit-out of a train station

Ilo-Arts

  • Conversion into a restaurant, coordination and implementation.
Sep 2022 - Aug 2024
2 years
Heidelberg, Germany

Professional Development

Ilo-Arts

  • Project management, factory planning, Factory 4.0, digitalization, small projects.
  • Concept, implementation, execution.
Jan 2020 - Jun 2022
2 years 6 months
Heidelberg, Germany

Renovation of a five-story house

Ilo-Arts

  • From the basement to the attic with the executing companies.
  • Planning, organization, implementation measures, various conversions, converting the attic into a full apartment.
Apr 2019 - Dec 2019
9 months
Graben-Neudorf, Germany

Factory environment planning for a plant expansion towards 4.0

SEW Eurodrive, Wiepro- Anlagenmanagement

  • Planning the infrastructure of a production hall for optimal performance, cost-effectiveness, energy efficiency and environmental compatibility.
  • Developing solutions for 250 machining tools for chip disposal, coolant supply, extraction systems and machine cooling.
  • Creating feasibility studies and conceptual variants for later implementation of: coolant supply via 4 central coolant systems with 20-50000 L/min and chip disposal of 30 t/day.
  • Planning options for chip transport with coolant through pipes or via extraction or with mobile MLAs.
  • Recording the type and quantity of chips and coolant.
  • Creating layouts and media lists, specifications, negotiating with suppliers, risk analysis.
Aug 2018 - Dec 2018
5 months
Heidelberg, Germany

Renovation of a listed Art Nouveau villa

Ilo-Arts

  • Coordinating the renovation and the companies involved.
  • Inspecting renovation measures and executions.
Jun 2017 - Jun 2018
1 year 1 month
Heidelberg, Germany

Self-employed in Sales and Marketing

Ilo-Arts

  • Developed, finished, and published a cardboard model of Heidelberg Castle.
  • Expanded marketing for Kuxbalo in the therapy sector, game fairs, marketing, sales, agile project management.
Aug 2016 - May 2017
10 months
Mannheim, Germany

Carrying out special tasks in foundry projects

Daimler-Benz Werk Mannheim

  • Prepared for installation and assembly of the MFO 4 furnace, set up a steel granulate blowing system.
  • Planned the conversion from diesel forklifts to electric forklifts.
  • Prepared approval documents for the B144 north expansion, disposal and storage of flammable materials, fire protection plan, safety regulations for the laser welding room.
Sep 2015 - May 2016
9 months
Hattenhofen, Germany

Upgrading aluminum die-casting machines

Schweizergroup Werk Plattenhardt Hattenhofen

  • Optimized temperature control of the die-casting machines in foundries 1, 2, and 3.
  • Analyzed weak points in the heating/cooling systems.
  • Developed concepts and layouts for optimal use.
  • Process optimization: distributor wall with oil and water connections, power column with control cabinet, insulated hose channels.
  • Cleanly laid hose and duct lines with labeling.
  • Documentation: before 37% – after 2% scrap rate, staff training.
  • Addressed oil cracking issues: analysis and solution development.
Jul 2015 - Aug 2015
2 months
Heidelberg, Germany

Self-employed in designer lighting

Ilo-Arts

Mar 2015 - Jun 2015
4 months
Wörth am Rhein, Germany

Layout planning and relocation of quality inspection for trucks

Mercedes-Benz Werk Wörth

  • Defined requirements, created space concept, draft planning.
  • Concept and layout planning for the hall and offices.
  • Documentation, specifications.
Jan 2014 - Feb 2015
1 year 2 months
Sindelfingen, Germany

Equipment Planning for New Press Shop Construction in Kuppenheim

Mercedes-Benz Plant Sindelfingen

  • Equipment planning, concepts and elaboration for the areas of machine maintenance, toolmaking, training, warehouse, administration building, offices.
  • Move organization, on-site setup.
Oct 2013 - Dec 2013
3 months
Sindelfingen, Germany

New construction, industrial relocation project

Mercedes-Benz Plant Sindelfingen

  • Create concept for storing measurement data.
  • Create equipment and plant layouts.
Apr 2012 - Sep 2013
1 year 6 months
Walldorf, Germany

Layout creation, process optimization, assembly relocation, machine assembly

Balci GmbH

  • Analysis of the current situation: manufacturing, assembly.
  • Create specifications, select suppliers.
  • Plan space, machinery layout, and material flow considering utilities.
  • Develop equipment and a flexible support frame for assembling sturdy wooden floors.
  • Prepare tender documents.
  • Supervise assembly.
Oct 2007 - Mar 2012
4 years 6 months
Meckesheim, Germany

Machine relocation, move, assembly and quality management

Maag Systems

  • Reassembly and project management.
  • Develop concept, create machine layouts.
  • Create space planning, assembly planning, material flow plan.
  • Prepare tender documents.
  • Oversee assembly.
  • Develop tools and test fixtures.
  • Coordinate material orders from 80 suppliers.
  • Weekly steering committee meetings at HQ.
  • Implement Kanban system with HQ.
  • Project planning of the Capri packaging machine.
Jan 2007 - Jun 2007
6 months
Mannheim, Germany

Project planning, relocation

Ergion Mannheim Renewable Energy

  • Relocate and set up assembly for the Ergion machine.

  • Consider existing building structure.

  • Test setup: concept to capture waste heat from hardening furnaces.

  • Build heat storage and circulation system; convert screw compressors to steam operation.

  • Solar energy generation for water treatment, lighting, and heating of a fish farm.

May 2005 - Dec 2006
1 year 8 months
Heidelberg, Germany

Self-employed in designer lighting

Ilo-Arts

  • Development and optimization of designer lights.
Jan 2003 - Apr 2005
2 years 4 months
Kirchheimbolanden, Germany

Design Engineer, Developer

Borg Warner Turbo Systems

  • Design of clamping fixtures.
  • Product development of plastic parts with ProE.
Jan 2003 - Apr 2005
2 years 4 months
Kassel, Germany

Design Engineer, Developer

Rheinmetall Landsysteme

  • Development and design of an armored rear door, thermal insulation, door locking mechanism.
  • Retrofitting a stronger braking system with ABS in the tank.
  • Design of mechanical components with UG-NX.
Nov 2000 - Nov 2002
2 years 1 month
Weinheim, Germany

Production relocation

Freudenberg

  • Restructuring, relocation, optimization.
  • Basic data creation and recording in the concept phase.
  • Planning of capacities, frequencies, schedules, and costs.
  • Detailed scheduling of the move for the project in Italy.
  • Budget creation and cost monitoring.
  • Technical clarification and preparation for awarding contracts to third-party companies.
  • Layout creation in CAD.
  • Relocation, monitoring of the moves, implementation in the Netherlands.
  • Risk analysis and working out deficiencies for a new pressurized water system.
Jan 2000 - Jun 2000
6 months
Heidelberg, Germany

Technician

Endocon

  • Designing with Unigraphics NX.
  • Tools and fixtures.
  • Portal for a cell phone PCB assembly machine.
Mar 1998 - Oct 1999
1 year 8 months
Heidelberg, Germany

Self-employed Designer and Technician

Ilo-Arts

  • Develop and produce stainless steel constructions (design objects) in combination with glass.
Aug 1991 - Nov 1997
6 years 4 months
Wiesloch, Germany

Project and Production Planner

Heidelberger Druckmaschinen

  • Layout planning for the new Hall 12.
  • Restructuring and relocation of cylinder assembly.
  • OMO – optimizing assembly organization for the new building.
  • Layout planning of gear production in Hall 10.
  • Relocation of multiple assembly teams within and across halls.
  • Relocation of various departments as part of the plant restructuring.
  • Create a disposal concept for the Brandenburg plant.
  • Collect and prepare basic data in the concept phase.
  • Planning, design, and layout creation for the plant relocation.
  • Planning capacities, frequencies, schedules, and costs.
  • Prepare budgets and monitor costs.
  • Layout planning in Wiesloch, implementation in Brandenburg.
Apr 1989 - Jun 1991
2 years 3 months

Designer and Industrial Planner

Engineering Service Provider

  • Assignments at Heidelberger Druckmaschinen, Kraftanlagen Heidelberg, Walker Germany, Lauer, and Apparatebau Wiesloch.
  • Design and construction of piping systems.
  • Create isometric and technical drawings.
  • Design of a waste heat boiler and combustion furnace.
  • Planning and design of a hydraulic-pneumatic spot welding machine with an infeed table for catalysts.
  • Tool design for silencers.
  • Relocation planning and transfer of operational equipment.
  • Planning of 2 production lines for silencers.
  • Create a fire protection plan for the new plant.
Oct 1988 - Mar 1989
6 months
Mannheim, Germany

Design Engineer

INMA

  • Filter cleaning machine for the pharmaceutical industry.
  • Plan equipment and fixtures.
Jan 1977 - Sep 1988
11 years 9 months
Heidelberg, Germany

Technical Staff

Eltro Pfaffengrund, optische Geräte

  • Inspector in the quality assurance/production inspection department.
  • Assembler of optical equipment and designer.
  • Provide theoretical shop instruction for apprentices.
Sep 1969 - Mar 1974
4 years 7 months
Eppelheim, Germany

Apprenticeship as a toolmaker

Chrobok

  • Cutting tools, heating molds for rubber parts.
  • Vocational school - Heidelberg.
  • Graduation.

Summary

Currently I'm looking for a new challenge as a freelance consultant. My expertise is in project management for factory environments, including analysis, optimization and implementation.

My special skills are in mechanical engineering, project management, planning of structural and area-related topics, factory planning, decommissioning, relocations, moves, process manufacturing plant optimization and implementation.

For example:

  • Project management in a factory setting, factory planning, concept development, execution and coordination.
  • Planning and implementing the infrastructure, layout and machine equipment for a new hall.
  • PFMEA, analyzing existing production processes and assessing them. Actual vs. target state.
  • Conducting process optimization using Lean Manufacturing, Lean Production, Kaizen, and continuous improvement (CIP).
  • Analyzing, developing, planning and implementing optimal workflows for production machines and their integrated automation.

Management:

  • Factory planning, hall expansion, layout, production-related technical buildings
  • Optimization and design of production and assembly processes towards Factory 4.0
  • Project documentation and creation of as-built documentation
  • Coordinating project teams, leading and giving instructions to subcontractors on site..

As a freelance consultant I have successfully carried out many different factory environment projects with a structured, self-reliant and team-oriented approach.

Especially in the area of Factory 4.0, I would like to apply and further develop my experience in factory planning, optimization and implementation.

Languages

German
Native

Education

Apr 1981 - Jul 1985

DAG Technikum Essen

State-certified Mechanical Engineering Technician · Mechanical Engineering Technician · Essen, Germany

Sep 1969 - Mar 1974

Berufsschule Heidelberg

Apprenticeship as toolmaker, cutting tools, heating molds for rubber parts · Toolmaker · Eppelheim, Germany

Jun 1960 - Aug 1969

Volksschule Ziegelhausen

Secondary school diploma · Heidelberg, Germany

Certifications & licenses

State-certified Mechanical Engineering Technician

DAG Technikum Essen

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions