Gottfried Forster

REFA expert, LEAN, process optimization, productivity improvement, cost reduction

Spaichingen, Germany
Experience
Jan 2025 - Dec 2025
1 year

Production

Automobile industry

  • Process analyses
  • Cycle times
  • Standard times
  • Productivity improvement measures
  • Multi-machine operation
Jan 2025 - Dec 2025
1 year

Work planning

Cardan shafts

  • Training in work planning with the IPASWIN system
  • Process analyses
  • Process optimization
  • Planned time setup
  • Standard time calculation
  • Presentation of potential
  • Assembly line balancing
Jan 2025 - Dec 2025
1 year

Work planning

Storage technology

  • Training in work planning with the IPASWIN system
  • Planned time values
  • Planned time formula
  • Regression calculation
Jan 2025 - Dec 2025
1 year

Production

Medical technology

  • Process analyses
  • Standard times
  • Productivity improvement measures
  • Process optimization
Jan 2024 - Dec 2024
1 year

Machining

Automobile industry

  • Process analyses
  • Multi-machine operation
  • CNC machining
  • Bottleneck analysis
  • Creation of an OPL action list
  • Measures and savings potentials
Jan 2024 - Dec 2024
1 year

Logistics

Food industry

  • REFA multi-moment study
  • Potential analysis
  • PDCA action list for productivity improvement and staffing capacities
Jan 2024 - Dec 2024
1 year

Production planning

Food industry

  • REFA process analyses
  • Productivity improvement
  • Process optimization
Jan 2024 - Dec 2024
1 year

Assembly

Defense industry

  • Process analyses
  • Standard time review
  • Target figures
  • Bottleneck analysis
  • Creation of an OPL action list
  • Savings potentials
Jan 2024 - Dec 2024
1 year

Switch cabinet

Switchgear

  • Process analyses
  • Standard time review
  • Target figures
  • Setup of planned time systems
Jan 2023 - Dec 2023
1 year

Machining

Automobile industry

  • Production line optimization
  • Process analyses
  • Cleaning and maintenance
  • Shopfloor management
  • Coaching managers and employees
  • Production planning and control
  • KPI indicator system
  • OEE productivity improvement
  • Workplace optimization
  • Personnel planning
Jan 2023 - Dec 2023
1 year

Production

Printing & media

  • REFA process analyses in offset and digital printing
  • Cutting
  • Folding
  • Packaging and shipping
  • Warehouse organization
  • Created planned time values and calculation key figures
  • Layout and material flow planning
  • Implementation and support of PDCA measures
  • Organizational structure
  • Job descriptions according to ERA
  • Potential analysis
  • Continuous improvement workshop
  • Workplace design and organization
Jan 2023 - Dec 2023
1 year

Assembly

Medical technology

  • Process analyses
  • Standard time review
  • Target figures
  • Bottleneck analysis
  • Creation of an OPL action list
  • Savings potentials
Jan 2023 - Dec 2023
1 year

Logistics

Food industry

  • REFA multi-moment study
  • Potential analysis
  • PDCA action list for productivity improvement and staffing capacities
Jan 2023 - Dec 2023
1 year

Machining

Space systems

  • REFA time studies
  • CNC machining center
  • Potential analysis
  • PDCA measures
  • Target vs. actual time comparison
  • Savings potentials
Jan 2023 - Dec 2023
1 year

Assembly

Defense industry

  • Process analyses
  • Standard time review
  • Target figures
  • Bottleneck analysis
  • Creation of an OPL action list
  • Savings potentials
Jan 2023 - Dec 2023
1 year

Electronics vulcanization

Switchgear

  • Process analyses
  • Standard time review
  • Target figures
  • Multi-machine operation
  • Bottleneck analysis
  • Creation of an OPL action list
  • Savings potentials
Jan 2022 - Dec 2022
1 year

Assembly

Automobile industry

  • REFA time studies
  • Optimization of one-piece-flow workstations
  • Continuous improvement measures
  • Reviewed and updated standard times
Jan 2022 - Dec 2022
1 year

Production

Turned parts industry

  • REFA setup time analysis
  • Setup time optimization
  • Productivity improvement measures / machine run time optimization (OEE)
Jan 2022 - Dec 2022
1 year

Production

Printing & media

  • REFA process analyses in offset and digital printing
  • Cutting
  • Folding
  • Packaging and shipping
  • Warehouse organization
  • Created planned time values and calculation key figures
  • Layout and material flow planning
  • Implementation and support of PDCA measures
  • Organizational structure
  • Job descriptions according to ERA
  • Potential analysis
  • Continuous improvement workshop
  • Workplace design and organization
Jan 2022 - Dec 2022
1 year

Production

Filter technology

  • REFA time studies
  • Check and update standard times
  • Potential analysis
  • PDCA measures for productivity improvement and cost reduction
  • Target vs. actual data comparison
  • Production data management
Jan 2022 - Dec 2022
1 year

Machining

Medical technology

  • REFA time studies
  • Check and update standard times
  • Target vs. actual data comparison
  • Production data management
  • Goal: planning reliability
Jan 2022 - Dec 2022
1 year

Assembly

Medical technology

  • REFA time studies
  • Check and update standard times
  • Potential analysis
  • PDCA measures for productivity improvement and cost reduction
  • Planning reliability
Jan 2022 - Dec 2022
1 year

Production

Medical technology

  • REFA time studies
  • Bending
  • Welding
  • Wire basket manufacturing
  • Potential analyses
  • PDCA action list for productivity improvement
Jan 2022 - Dec 2022
1 year

Baking line

Food industry

  • REFA multi-moment study
  • Potential analysis
  • PDCA action list for productivity improvement
Jan 2022 - Dec 2022
1 year

Bakery production

Food industry

  • REFA multi-moment study
  • Potential analysis
  • PDCA action list for productivity improvement and staffing capacities
  • Equipment maintenance
Jan 2021 - Dec 2021
1 year

Machining

Automobile industry

  • Checked and updated standard times
Jan 2021 - Dec 2021
1 year

Assembly

Automobile industry

  • Reviewed assembly processes and standard times
  • Potential analysis
  • Continuous improvement projects
Jan 2021 - Dec 2021
1 year

Assembly

Electronics

  • REFA time studies
  • Final assembly
  • Development of planned time structure
  • Planned time formulas
  • Planned time values
  • New product costing system
Jan 2021 - Dec 2021
1 year

Assembly

Pumps

  • REFA time studies
  • Check and update standard times
Jan 2020 - Dec 2020
1 year

Machining

Automobile industry

  • REFA time studies
  • Multi-machine operation
  • Machining
  • Process optimization
  • Productivity improvement
Jan 2020 - Dec 2020
1 year

Assembly

Automobile industry

  • REFA time studies
  • Time data management
  • Time review and update
Jan 2020 - Dec 2020
1 year

Assembly

Automobile industry

  • REFA time studies
  • Check and update standard times
  • Costing and planning basics
  • Process optimization
  • Tool optimization
Jan 2020 - Dec 2020
1 year

Assembly

Automobile industry

  • Video analyses
  • Check and update standard times
  • Video analyses
Jan 2020 - Dec 2020
1 year

Assembly

Electronics

  • REFA time studies
  • Final assembly
  • Setting up a planned time structure
  • Planned time formulas
  • Planned time values
  • Setting up a costing system
  • Continuous improvement projects
Jan 2020 - Dec 2020
1 year

Assembly

Mechanical engineering

  • REFA time studies
  • Productivity improvement measures
  • Organizational structures in production
Jan 2019 - Dec 2019
1 year

Assembly

Automobile industry

  • Potential analysis
  • Process optimization
  • Layout and material flow planning
  • Assembly line balancing
Jan 2019 - Dec 2019
1 year

Series launch

Automobile industry

  • Project manager for product launch / ramp-up in battery production
  • Layout and material flow planning
  • Logistics concept
  • Assembly line
Jan 2019 - Dec 2019
1 year

Vulcanizing

Automobile industry

  • Production data management
  • Standard time and task content review
  • Productivity
  • Multi-machine operation
Jan 2019 - Dec 2019
1 year

Assembly / coating

Pump systems

  • Process analyses
  • Process optimization
  • Creation of costing basics
  • REFA time studies
  • Potential analysis
  • Layout and material flow planning
  • Implementation of packing measures
  • Productivity improvement
  • Value creation projects
Jan 2018 - Dec 2018
1 year

Fan technology

Automobile industry

  • Process analyses
  • Update of costing basics and productivity
  • Bottleneck analysis
  • Process optimization
  • Productivity improvement measures and OEE
  • Implementation of measures
Jan 2018 - Dec 2018
1 year

Personnel

Automobile industry

  • Workplace evaluation according to ERA
  • Classification review
  • Expert opinion
Jan 2018 - Dec 2018
1 year

Electronics / series launch

Aerospace industry

  • Interim launch manager (6 months)
  • Process planning and implementation for new projects through series production
  • Organization and control of involved departments until series maturity
  • Change management
Jan 2018 - Dec 2018
1 year

Lean

Pump systems

  • Layout and material flow planning (new build)
  • Organization concept, org chart, tasks
  • Setting up a flow production, process organization, workplace design
  • Concept for assembly modules
Jan 2018 - Dec 2018
1 year

Assembly

Pump systems

  • Process analyses within the value chain
  • Identifying savings potentials for efficiency and productivity improvement
Jan 2017 - Dec 2017
1 year

Machining

Aluminum industry

  • Coaching in REFA methods
  • TWI (Training Within Industry)
  • Theory and practice
Jan 2017 - Dec 2017
1 year

Packing area

Aluminum industry

  • Layout and material flow planning
  • Implementation of measures
  • TWI (Training Within Industry)
  • Work methods for productivity improvement
Jan 2017 - Dec 2017
1 year

Packing & shipping

Aluminum industry

  • Process analyses in packaging
  • Potential analysis -> layout and material flow planning
  • Implementation of measures
  • TWI (Training Within Industry)
  • Optimized packing performance
Jan 2017 - Dec 2017
1 year

Electronics

Automobile industry

  • Concept development for productivity improvement in SMD placement
  • Final testing
  • Transport
  • Logistics
  • Equipment utilization optimization
Jan 2017 - Dec 2017
1 year

Fan technology

Automobile industry

  • Process analyses
  • Assembly line balancing
  • Bottleneck analysis
  • Process optimization
  • Productivity improvement measures and OEE
  • Implementation of measures
Jan 2017 - Dec 2017
1 year

Machining

Automobile industry

  • Process analyses
  • Assembly line balancing
  • Bottleneck analysis
  • Process optimization
  • Productivity improvement measures
  • Implementation
Jan 2017 - Dec 2017
1 year

SMD placement

Automobile industry

  • Process analyses
  • Component kitting
  • SMD and conventional placement
  • SMD path optimization
  • Setup time optimization
  • Final inspection
  • Visual inspection
  • Multi-machine operation
  • Bottleneck analysis
  • Personnel capacity planning
Jan 2017 - Dec 2017
1 year

Turbo housings

Automobile industry

  • Process analyses
  • Assembly line balancing
  • Bottleneck analysis
  • Process optimization
  • Productivity improvement measures and OEE
  • Implementation of measures
  • Shopfloor management
Jan 2017 - Dec 2017
1 year

Welding line

Wire basket systems

  • Process analyses
  • Bottleneck analysis
  • Process optimization
  • Productivity improvement measures and OEE
  • Implementation of measures
Jan 2017 - Dec 2017
1 year

Logistics

Cosmetics, pharma, food, technical products

  • Layout and material flow planning
  • FIFO warehouse planning
  • Concept development for measure implementation
Jan 2017 - Dec 2017
1 year

Base line

Furniture industry

  • Process analyses
  • Identification of planned time values
  • Bottleneck analysis
  • Productivity improvement measures
Jan 2017 - Dec 2017
1 year

Shipping

Furniture industry

  • Process analyses
  • Identification of new planned time values
  • Work method and work system descriptions
  • Potential analysis -> layout and material flow planning
Jan 2017 - Dec 2017
1 year

Anodizing

Surface finishing

  • Process and cost analyses for producing carriers – variants –
  • Developed costing concept
Jan 2016 - Dec 2016
1 year

Automatic packaging stations

Aluminum industry

  • Process analysis – shift recordings
  • Error analysis at automatic packaging stations
  • Concept development for productivity improvement
Jan 2016 - Dec 2016
1 year

Manufacturing

Aluminum industry

  • REFA training
  • TWI (Training Within Industry) – value creation and waste identification
  • Savings potentials
  • Implementation of measures
Jan 2016 - Dec 2016
1 year

Packing station

Aluminum industry

  • Process analyses at the packing station
  • Savings potentials -> implementation of measures
  • TWI (Training Within Industry)
  • Identify value creation and waste
  • Optimized packing performance
Jan 2016 - Dec 2016
1 year

Electronics / logistics

Automobile industry

  • Workplace evaluation according to ERA
  • Classification review
  • Expert opinion
Jan 2016 - Dec 2016
1 year

Transmission production

Automobile industry

  • Multi-moment studies to determine distribution time allowances
  • Process and setup time analyses
  • Material flow and layout planning
  • Shopfloor management
  • Personnel planning
  • Employee coaching
  • Multi-machine operation
Jan 2016 - Dec 2016
1 year

Logistics

Automobile industry

  • Process analyses
  • Personnel requirement determination
  • Productivity improvement concept
Jan 2016 - Dec 2016
1 year

Assembly

Automobile industry

  • Process analyses
  • Standard time determination
  • Process optimization measures
  • Savings potentials
  • Productivity improvement (Poland plant)
Jan 2016 - Dec 2016
1 year

Assembly

Automobile industry

  • Process analyses
  • Process optimization of production cells
  • LEA management
  • Shopfloor management
Jan 2016 - Dec 2016
1 year

Assembly

Automobile industry

  • Process analyses
  • Assembly line balancing
  • Takt time planning
Jan 2016 - Dec 2016
1 year

Assembly

Automobile industry

  • Process analyses on production lines
  • Station balancing
  • Optimized material logistics
  • Process organization
  • Workplace design
Jan 2016 - Dec 2016
1 year

Prototype construction

Automobile industry

  • Process analyses
  • Tube production
  • Deep drawing
  • Setup time optimization
Jan 2016 - Dec 2016
1 year

Deep drawing

Automobile industry

  • Process analyses
  • Evaluation of value creation
  • Savings potentials
  • Concept for productivity improvement
  • Implementation of measures
  • TWI (Training Within Industry) – production –
Jan 2016 - Dec 2016
1 year

Wheel loader

Vehicle construction

  • Process analyses
  • Standard time determination
  • Creation of costing basics
Jan 2016 - Dec 2016
1 year

Palletizing and packing

Cosmetics, pharma, food, technical products

  • Process analyses
  • Evaluation of value creation
  • Savings potentials
  • Concept for productivity improvement
Jan 2016 - Dec 2016
1 year

Electroplating, powder coating

Surface finishing

  • Process analyses
  • Created costing sheets for sales
  • Employee coaching
  • Packing area optimization
  • Shipping
Jan 2015 - Dec 2015
1 year

Manufacturing

Aluminum industry

  • Process documentation
  • Production planning
  • System selection for production visualization – Industry 4.0 –
  • OEE data collection
  • KPIs
  • KPI evaluation
  • Measures
Jan 2015 - Dec 2015
1 year

Machining

Automobile industry

  • Interim project: lean management in machining
  • Introduction of shopfloor management
  • Measures
  • Scheduling
  • Implementation
Jan 2015 - Dec 2015
1 year

Assembly

Automobile industry

  • Assembly line balancing
  • Takt times
  • Potential analysis
  • Workplace design
  • Measures
  • Implementation
Jan 2015 - Dec 2015
1 year

Assembly

Automobile industry

  • Process analyses
  • Savings potentials
  • Assembly line balancing
  • Measures
  • Implementation
Jan 2015 - Dec 2015
1 year

Injection molding

Automobile industry

  • Setup time optimization – injection molding –
  • Potential analysis
  • Process organization
  • Planned time modules
Jan 2015 - Dec 2015
1 year

Goods receipt

Wood industry

  • Process analyses
  • Potential analysis
  • Measures
  • Implementation
  • Layout planning
Jan 2015 - Dec 2015
1 year

Packing area

Surface finishing

  • Interim project: packing area
  • Direct packaging
  • Measures
  • Implementation
  • Employee coaching
Jan 2015 - Dec 2015
1 year

Packing & shipping

Surface finishing

  • Process analyses
  • Setup of a planned time system
  • Creation of costing sheets
  • Variants
  • Preliminary costing
Jan 2015 - Dec 2015
1 year

Organization

Special machine construction

  • Process analyses
  • Determination of tasks in invoicing
  • Shipping
  • Complaints
  • Purchasing
  • Receiving
  • Accounting
Jan 2014 - Dec 2014
1 year

Final assembly

Automobile industry

  • Process analyses
  • Savings potentials
  • Measures
  • Implementation
Jan 2014 - Dec 2014
1 year

Final assembly

Automobile industry

  • Coaching REFA staff
  • Work methods
  • Savings potentials
  • Productivity
Jan 2014 - Dec 2014
1 year

Fan technology

Automobile industry

  • Production data management
  • Process analyses
  • Standard time and costing update
Jan 2014 - Dec 2014
1 year

Assembly

Automobile industry

  • Process analyses
  • Savings potentials
  • Assembly line balancing
  • Measures
  • Implementation
Jan 2014 - Dec 2014
1 year

Organization

Automobile industry

  • Production planning and control – control center process optimization in production planning
Jan 2014 - Dec 2014
1 year

Assembly

Office furniture

  • Process analyses
  • Standard time determination
  • Savings potentials
  • Measures
  • Implementation
  • Layout and material flow planning
  • Workplace design
Jan 2014 - Dec 2014
1 year

Visual inspection

Turned parts

  • Process analyses
  • Savings potentials
  • Layout and material flow planning
  • Measures
  • Implementation
Jan 2014 - Dec 2014
1 year

Assembly

Lighting technology

  • Process analyses
  • Planned time systems
  • Costing basics
  • Standard time calculation
Jan 2014 - Dec 2014
1 year

Production

Lighting technology

  • Process analyses
  • Standard time determination
  • Takt times
  • Savings potentials
  • Measures
  • Implementation
  • Introduction of planned time systems
Jan 2014 - Dec 2014
1 year

Final assembly

Fan technology

  • Process analyses
  • Standard time determination
  • Savings potentials
  • Measures
  • Implementation
Jan 2014 - Dec 2014
1 year

Final assembly

Medical technology

  • Process analyses
  • Workplace design
  • Layout and material flow planning
  • Coaching REFA staff
Jan 2014 - Dec 2014
1 year

Production

Switch technology

  • Process analyses
  • Standard time determination
  • Takt times
  • Savings potentials
  • Measures
  • Implementation
Jan 2014 - Dec 2014
1 year

Machining

Special machine construction

  • Interim project: production management
  • Machining
  • Savings potentials
Jan 2013 - Dec 2013
1 year

Assembly

Automobile industry

  • Process analyses
  • Standard time determination
  • Savings potentials
  • Measures
  • Implementation
Jan 2013 - Dec 2013
1 year

Assembly / machining

Automobile industry

  • Process analyses
  • Standard time determination
  • Savings potentials
  • Assembly line balancing
  • Measures
  • Implementation
  • SMD placement
  • Power setup
Jan 2013 - Dec 2013
1 year

Surface finishing

Automobile industry

  • Process analyses
  • Standard time determination
  • Competitive cost comparisons
Jan 2013 - Dec 2013
1 year

Assembly line

Fluid technology

  • Process analyses
  • Standard time determination
  • Savings potentials
  • Measures
  • Implementation
Jan 2013 - Dec 2013
1 year

Drilling line

Wood industry

  • Process analyses
  • Standard time determination
  • Takt times
  • Savings potentials
  • Measures
  • Implementation
  • Piece rate / equipment utilization
Jan 2013 - Dec 2013
1 year

Powder coating

Surface finishing

  • Determination of process costs
  • Savings potentials
Jan 2013 - Dec 2013
1 year

Machining

Special machine construction

  • Interim project: production management
  • Machining
Jan 2012 - Dec 2012
1 year

Turned parts

Automobile industry

  • Bottleneck analysis
  • Production line optimization and balancing
  • Utilization rate
  • TPM shifts
  • Savings potentials
Jan 2012 - Dec 2012
1 year

Assembly

Automobile industry

  • Bottleneck analysis
  • Process optimization measures
  • Implementation
Jan 2012 - Dec 2012
1 year

Assembly

Automobile industry

  • Production line optimization
  • Assembly line balancing
  • Capacity calculation
  • TPM shifts
  • Savings potentials
  • Measures
  • Implementation
Jan 2012 - Dec 2012
1 year

Assembly

Wire basket systems

  • Process analyses in welding lines
  • Final assembly
  • Final inspection
  • Production data management
Jan 2012 - Dec 2012
1 year

Door line

Wood industry

  • Process analyses
  • Standard time determination
  • Assembly line balancing
  • Layout and material flow planning
  • Workplace design
Jan 2012 - Dec 2012
1 year

Production

Lighting technology

  • Introduction of planned time systems for standard time determination
  • Preliminary costing
  • Production data management
  • Setup time optimization
Jan 2012 - Dec 2012
1 year

Final assembly, warehousing, shipping

Musical instruments

  • Process optimization
  • Process organization
  • Organizational design
  • Layout and material flow planning
  • Production planning and control
  • Assembly line setup
Jan 2011 - Dec 2011
1 year

Painting technology

Automobile industry

  • Production data management
  • Layout and material flow planning
  • Identification of savings potentials
  • Implementation of measures
  • Assembly line balancing
  • Process optimization
Jan 2011 - Dec 2011
1 year

Fan technology

Automobile industry

  • As-is analysis
  • Plant comparison of national and international sites (standard times)
Jan 2011 - Dec 2011
1 year

Machining

Automobile industry

  • Production data management
  • Final assembly
  • Shipping
  • Kitting
  • Bottleneck analysis
  • Improvement suggestions
  • Savings potentials
  • Process optimization
Jan 2011 - Dec 2011
1 year

Assembly

Automobile industry

  • As-is analysis
  • Standard time determination
  • Savings potentials
Jan 2011 - Dec 2011
1 year

Assembly

Automobile industry

  • Process analyses
  • Standard time determination
  • Savings potentials
  • Assembly line balancing
  • Measures
  • Implementation
  • SMD placement
  • Power setup
Jan 2011 - Dec 2011
1 year

Assembly

Automobile industry

  • Process analyses
  • Standard time determination
  • Savings potentials
  • Measures
  • Implementation
Jan 2011 - Dec 2011
1 year

Organization

Automobile industry

  • Production planning and control
Jan 2011 - Dec 2011
1 year

Switch technology

Automobile industry

  • Production data management
  • SMD placement
  • Setup time optimization
  • Planned time system setup
  • Personnel deployment planning
Jan 2011 - Dec 2011
1 year

Injection molding

Automobile industry

  • Production data management
  • Setup time optimization in plastic injection molding
  • Setup time optimization workshop
  • Material flow and layout planning
  • Bottleneck analysis
  • Process optimization measures
  • Implementation
Jan 2011 - Dec 2011
1 year

Injection molding

Automobile industry

  • Master data in ERP system
  • Order processing
  • Production planning and control
  • Pre- and post-costing
Jan 2011 - Dec 2011
1 year

Organization

Wood industry

  • Production data management
  • Final assembly
  • Kitting
  • Bottleneck analysis
  • Improvement suggestions
  • Process optimization
Jan 2011 - Dec 2011
1 year

Final assembly

Medical technology

  • Assembly line balancing
  • Workplace design
  • Personnel deployment planning
Jan 2011 - Dec 2011
1 year

Final assembly

Music industry

  • Production data management
  • Identification of savings potentials
  • Material flow and layout planning
  • Bottleneck analysis
  • Process optimization measures
  • Implementation
Jan 2010 - Dec 2010
1 year

Coating

Automobile industry

  • Production data management
  • Layout and material flow planning
  • Identification of savings potentials
  • Implementation of measures
  • Process optimization
Jan 2010 - Dec 2010
1 year
Lorem ipsum dolor sit amet

Wire basket systems

  • Production data management
  • Process optimization
  • Assembly line balancing
Summary

As a process manager with over 40 years of experience in production optimization, I help companies boost efficiency and value creation. With my expertise in REFA methods, lean principles, and production KPI analysis, I have significantly optimized workflows and increased productivity for our clients. My goal is to enable sustainable success for companies through customized solutions. Currently, I work at Consulting, where I focus on analyzing and improving production processes. My systematic approach and use of proven methods allow me to solve complex challenges and deliver lasting results. Transparency in the value chain is for me the key to unlocking potential and guiding companies on their path to success.

Languages
German
Advanced
English
Elementary
Education
Aug 1976 - Apr 1980

TVH

Studies in engineering · Engineering · Stockach, Germany

Aug 1976 - Jun 1979

Vocational school center

Advanced technical college entrance qualification · Stockach, Germany

Aug 1976 - Apr 1979

Vocational school center Stockach

Wholesale and foreign trade clerk · Stockach, Germany

Certifications & licenses

Special certificate in metal cutting production

REFA

Basic certificate for work study

REFA

Making competence visible

LinkedIn

Lean Six Sigma – Basics

LinkedIn

Online course in Lean Six Sigma

Practitioner diploma

MTM

Qualification as ERA-TV

Southwestmetall

Standard data

MTM

Technician for work study and operations organization

REFA

UAS

MTM

Value stream design

REFA

Need a freelancer? Find your match in seconds.
Try FRATCH GPT
More actions