Support in planning and selecting hardware components, support in planning and designing required sensors and actuators, engineering of third-party components, familiarization with customer-specific software, project planning and control activities, programming the plant with Embarcadero C++, clarifying requirements for ECU communication, programming ECU/control unit interface via CAN and a Vector CAN adapter using Vector CANoe with Embarcadero C++, programming and integration of special devices from various manufacturers, e.g. label readers, pre-commissioning at the main plant and commissioning of the plants at the European secondary plant, training staff, creating technical documentation with Microsoft Word 2024, creating technical documentation for ECU communication, project was conducted entirely in English (global collaboration with Czech Republic / Switzerland / Italy)
Familiarization with the PLC software template, adjustment of the hardware configuration to the new components, migration of the PLC software from Siemens STEP7 Professional (Classic) on an S7-300 to Siemens TIA Portal v15.1 and an S7-1500 CPU, removal of no longer needed components, integration of new components into the PLC software, revision of test sequences, implementation of the Rea-Jet Verifier (for checking 2D code quality) via a customer-specific interface, conversion of communication to the SQL database directly from the S7-1500 CPU, takeover and adaptation of the HMI application, on-site commissioning at the customer, handover to customer staff, documentation of HMI changes with Microsoft Office 2024
Analysis of customer requirements, expansion of PLC standard blocks with Siemens TIA Portal and Siemens STEP7 (Classic), development of new functions, implementation of the software in multiple existing plants (Classic + TIA Portal), programming communication between the plants, extension of the HMI application of existing plants, creation of technical documentation
Familiarization with the customer's basic software structure, programming necessary functions, preparation of the HMI application, on-site commissioning at the customer, handover to customer staff, documentation of HMI changes with Microsoft Office 2024
Familiarization with the customer's prepared software, commissioning of the packaging machine at the customer's site, commissioning all components, commissioning of SEW drives / Keyence camera / glue unit / vacuum device, optimization of existing software, support in further commissioning at the end customer's site (remote), documentation of changes with Microsoft Office 2024
Familiarization with the customer's prepared software, commissioning of the modified software at the end customer on site, alignment of software versions, commissioning the modified Profinet communication to the upstream sorting system, optimization of the start/stop behavior of the packaging machine, extension of the HMI application, recommissioning of the packaging machine and supervision of test runs, documentation of changes with Microsoft Office 2024
Analysis of customer requirements, familiarization with the customer's existing C++ software, revision of the test sequence plan and adaptation to customer requirements, development of new functions, optimization of existing source code with Borland C++ Builder 2007 in C++, documentation of existing source code with Doxygen, extension of step sequences and process control with C++, test runs and optimizations at the customer's site, support during commissioning, handover to the customer's programmers, documentation of HMI changes with Microsoft Office 2019
Analysis of customer requirements, familiarization with project requirements, programming and commissioning of several plants with Siemens TIA Portal and Siemens WinCC flexible, optimization of existing PLC standard functions, creation of technical documentation
Analysis of customer requirements, programming PLC standard blocks with Siemens TIA Portal and Siemens STEP7 (Classic), programming statistical data collection with Microsoft Visual C#.NET 2022, implementation of the software in multiple existing plants (Classic + TIA Portal), extension of the HMI application of existing plants, creation of technical documentation
Support in planning and selecting new hardware components, support in planning and designing the required new sensors and actuators, engineering of third-party components, familiarization with customer-specific software, project planning and control activities, programming new functions with Embarcadero C++ and Borland C++, clarifying changed and extended requirements for ECU communication, extension of ECU/control unit interface via CAN and a PCAN adapter with Embarcadero C++ and Borland C++, programming and integration of special devices from various manufacturers, e.g. a power supply for the test applications, pre-commissioning at the main plant and commissioning of the plants in the European secondary plant, training staff, creating technical documentation with Microsoft Word, creating technical documentation for ECU communication, project was conducted entirely in English (global collaboration with Czech Republic / Switzerland / Italy)